If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-031-25921 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-81.9,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Coshocton | |
| Municipality: Bethlehem Township | |
| Operator Name: NGO DEVELOPMENT CORP. | |
| Well Pad ID: | |
| Farm/Lease Name: SUPREME COUNCIL-HOUSE OF JACOBS | |
| License Status: Final Restoration | |
| License Date: 1986-12-12 | |
| Spud Date: 1986-12-18 | |
| Spud Drilling Contractor: UNGER DRILLING | |
| Final Drill Date: 1986-12-22 | |
| Well Total Depth: 3907.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.310000 | |
| Longitude: -81.900000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1986-12-12 | 37 HOPCO RESOURCES INC GeoDate 12/12/86 |
| Oil and Gas | 1986-12-12 | Issued Date 12/12/86 Expired Date 12/12/87 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03907 Proposed Drill Depth 03907 |
| Original Spud | 1986-12-18 | |
| Completed | 1986-12-22 | |
| Reached Total Depth | 1986-12-22 | |
| Completion Report Received | 1987-02-03 | |
| Construction Permit Expires | 1987-12-12 | |
| CO | 1993-08-19 | 98 NGO DEVELOPMENT CORP. GeoDate 12/12/86 |
| Plugged Back | 2013-10-16 | |
| Record Last Modified | 2019-06-14 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-06-10 | 4332 | 6534 | 156 |
| 4332 | 6534 | 156 | |
| 4332 | 6534 | 156 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 05/20/2014 | 05/24/2014 | 3820 | 419519 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | I-7L | Universal Well Services | iron control | Ethylene Glycol | 107-21-1 | 20 | 0.013657 | 359.59 |
| triethanolamine hydroxyacetate | 68299-02-5 | 20 | 0.013657 | 0 | ||||
| glycolic acid | 79-14-1 | 2.5 | 0.001707 | 0 | ||||
| LEB 10X | Universal Well Services | Breaker | Ethylene Glycol | 107-21-1 | 40 | 0.001001 | 13.25 | |
| Unigel 5F | Universal Well Services | Viscosifier | Guar Gum | 9000-30-0 | 99 | 0.00000076 | 5700 | |
| Nitrogen | Universal Well Services | gas | Nitrogen | 7727-37-9 | 100 | 29.1451 | 21,389,400.0 | |
| Unihib-G | Universal Well Services | corrosion inhibiter | short chained glycol ether | 112-34-5 | 60 | 0.001135 | 60 | |
| formaldehyde | 50-00-0 | 1 | 0.00001900 | 0 | ||||
| ethoxylated alcohol | 68002-97-1 | 35 | 0.000662 | 35 | ||||
| thiourea | 62-56-6 | 1 | 0.00001900 | 0 | ||||
| methanol | 67-56-1 | 5 | 0.00009500 | 5 | ||||
| acetophenone | 98-86-2 | 1 | 0.00001900 | 0 | ||||
| water | NGO Development | treatment carrier | water | 7732-18-5 | 100 | 0.000464608 | 100 | |
| Unifoam | Universal Well Services | foamer | sulfonic acids, C14-16- Alkane
Hydroxy and C14-16-Alkene, sodium salts |
68439-57-6 | 5 | 0.006836 | 0 | |
| N-Cocoaamidopropyl-N, N-dimethyl-N-2-hydroxypropylsulfobetain
N-Cocoaamidopropyl-N, N-dimethyl-N-2-hydroxypropylsulfobetaine |
68139-30-0 | 15 | 0.020509 | 0 | ||||
| glycol ethers | 111-76-2 | 20 | 0.027345 | 826.34 | ||||
| Silica Sand | US Silica | proppant | Crystalline Silica (quartz | 14808-60-7 | 99.9 | 0.00001779 | 134000 | |
| Cla-Check LP | Universal Well Services | clay control | 2-propen-1-aminium, N, N-dimethyl-N-2-propenyl-,
chloride, homopolymer |
26062-79-3 | 20 | 0.011115 | 0 | |
| ethylene glycol | 107-21-1 | 40 | 0.022229 | 338.95 | ||||
| EC6116A | Universal Well Services | biocide | dibromoacetonitrile | 3252-43-5 | 5 | 0.001226 | 125.4 | |
| 2, 2-dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.007356 | 0 | ||||
| polyethylene glycol | 25322-68-3 | 60 | 0.014713 | 0 | ||||
| HCL(15%) | Universal Well Services | formation damage removal | Hydrochloric Acid | 7647-01-0 | 15 | 0.328145 | 13000 | |
| NE-90 | Universal Well Services | non emulsifier | EO-C9-11-si, C10 rich alchohols | 78330-20-8 | 5 | 0.002252 | 0 | |
| 2-ethylhaxanol | 104-76-7 | 10 | 0.004503 | 0 | ||||
| Isopropanol | 67-63-0 | 10 | 0.004503 | 0 | ||||
| EO-C7-iso-, C8-rich alchohols | 78330-19-5 | 5 | 0.002252 | 0 | ||||
| methanol | 67-56-1 | 60 | 0.027021 | 327.66 | ||||
| naphthalene | 91-20-3 | 1 | 0.00045 | 0 | ||||
| Heavy aromatic naphtha | 64742-94-5 | 5 | 0.002252 | 0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| N2 | 0 | 180 Mscf | 0 | |||
| 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1987 | HOPCO RESOURCES INC | 10906.00 | 2566.00 | 330 |
| 1988 | HOPCO RESOURCES INC | 5660.00 | 1311.00 | 365 |
| 1989 | HOPCO RESOURCES INC | 3448.00 | 1060.00 | 365 |
| 1990 | HOPCO RESOURCES INC | 2406.00 | 874.00 | 365 |
| 1991 | HOPCO RESOURCES INC | 2000.00 | 1000.00 | 365 |
| 1992 | HOPCO RESOURCES INC | 1997.00 | 675.00 | 365 |
| 1993 | NGO DEVELOPMENT CORP. | 1187.00 | 472.00 | 365 |
| 1994 | NGO DEVELOPMENT CORP. | 1728.00 | 563.00 | 365 |
| 1995 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 365 |
| 1996 | NGO DEVELOPMENT CORP. | 3003.00 | 1172.00 | 365 |
| 1997 | NGO DEVELOPMENT CORP. | 1755.00 | 450.00 | 365 |
| 1998 | NGO DEVELOPMENT CORP. | 2458.00 | 865.00 | 365 |
| 1999 | NGO DEVELOPMENT CORP. | 1851.00 | 634.00 | 365 |
| 2000 | NGO DEVELOPMENT CORP. | 1981.00 | 518.00 | 0 |
| 2001 | NGO DEVELOPMENT CORP. | 1105.00 | 276.00 | 365 |
| 2002 | NGO DEVELOPMENT CORP. | 917.00 | 313.00 | 365 |
| 2003 | NGO DEVELOPMENT CORP. | 1231.00 | 278.00 | 365 |
| 2004 | NGO DEVELOPMENT CORP. | 1156.00 | 254.00 | 365 |
| 2005 | NGO DEVELOPMENT CORP. | 916.00 | 222.00 | 365 |
| 2006 | NGO DEVELOPMENT CORP. | 840.00 | 230.00 | 365 |
| 2007 | NGO DEVELOPMENT CORP. | 761.00 | 182.00 | 365 |
| 2008 | NGO DEVELOPMENT CORP. | 870.00 | 225.00 | 365 |
| 2009 | NGO DEVELOPMENT CORP. | 909.00 | 186.00 | 365 |
| 2010 | NGO DEVELOPMENT CORP. | 1000.00 | 154.00 | 365 |
| 2011 | NGO DEVELOPMENT CORP. | 862.00 | 194.00 | 365 |
| 2012 | NGO DEVELOPMENT CORP. | 821.00 | 144.00 | 366 |
| 2014 | NGO DEVELOPMENT CORP. | 295.00 | 31.00 | 365 |
| 2015 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 365 |
| 2016 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 365 |
| 2017 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1029486572 | 2018-10-30 0:00 | PW | No Violations | 0.50 |
| -1071664791 | 2014-2-10 0:00: | DD | No Violations | |
| -1922619620 | 2013-10-16 0:00 | PB | No Violations | |
| -1961226162 | 2013-10-12 0:00 | DD | No Violations | |
| -2074032959 | 2014-7-24 0:00: | DD | No Violations | |
| -2124900127 | 2017-9-29 0:00: | PW | No Violations | 0.80 |
| -245898620 | 2014-1-21 0:00: | DD | No Violations | |
| -351868306 | 2014-2-12 0:00: | DD | No Violations | |
| -509950701 | 2015-3-25 0:00: | PW | No Violations | |
| -593939197 | 2014-1-17 0:00: | DD | No Violations | |
| -988500169 | 2014-6-13 0:00: | DD | No Violations | |
| 0064823008 | 2014-12-15 | Preliminary Restoration | No Violations | On the day of my inspection I found that lease road and lower basin of the site were covered in gravel. The berms of the site and lease road were 95% covered in well established grass. The tank battery and separator were both diked and the dikes were covered in grass. There were no drilling materials or debris left at the location. This site passes preliminary restoration. |
| 0245898620 | 2014-01-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was not drilling. They were making repairs to the mud pump. The hole was at a depth of 3135 The permit was posted in the doghouse. There were no sags or tears in the pit liner and I found no leaks or spills. |
| 0351868306 | 2014-02-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was at a measured depth of 6510. They were drilling laterally in the Clinton sandstone. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 0509950701 | 2015-03-25 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The motor was intact and the valves were open. There was one separator and an electric meter inside of one dike. There were two 210 barrel tanks and one 100 barrel tank inside of a separate dike. Identification was posted and I found no leaks or spills. |
| 0581330606 | 2013-12-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the well pad and lease road were finished. No drilling equipment had been moved onto the location yet. |
| 0593939197 | 2014-01-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was drilling on fluid at a depth of 2696 The permit was posted in the doghouse. There were no sags or tears in the pit liner and I found no leaks or spills. |
| 0788647260 | 2013-10-11 | Plug / Plug Back | No Violations | On the day of my inspection RB Drilling and Formation Cementing were on location to set a bottom plug through the Clinton in order to prepare to drill horizontally. RB Drilling set 1.5 tubing at 3833 inside of 4.5 casing. Formation pumped 56 barrels of salt water to circulate the well. Then they pumped 30 sacks of class A cement and 1 bag of cotton seed hulls to set a 400 plug. |
| 0824187591 | 2016-01-25 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The electric motor was intact, the valves on the tubing and casing were open and the polished rod showed signs of recent use. The gauges showed 100 psi on the tubing and 70 psi on the casing. The tank battery consisted of two 210 barrel tanks, one 100 barrel tank and an earthen dike. There was one separator and a meter inside of a second dike. Identification was posted and I found no leaks or spills. |
| 0899392384 | 2016-08-11 | Production Wells | No Violations | On the day of my inspection I found that the well was being produced with an electric powered pumping unit. The motor was intact, the lines were connected and the valves were open. The unit was in operation at the time of inspection. The tank battery consisted of two 210 barrel steel tanks and one 100 barrel steel tank inside of an earthen dike. The tank valves were equipped with bull plugs. There was also another dike around a horizontal separator. Correct, legible identification was posted and I found no leaks or spills at the wellhead or tank battery. |
| 0988500169 | 2014-06-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling service rig #15 was rigged up on location drilling out the stage plugs from the frac job. At the time of my inspection they were connecting the power swivel to drill out the first plug at a depth of 4371. A blowout preventer was in use and I saw a record of the BOP being tested at 600 psi. They had 500 barrels of salt water on location. A closed loop, steel pit mud system was in use. |
| 1029486572 | 2018-10-30 | Production Wells | No Violations | On the day of my inspection I found that the pumping unit was in operation. There were no fluid or gas leaks from the wellhead and there was no contamination on the ground. Correct, legible identification was posted on one of the steel tanks. I found no leaks or spills around the tanks or separators. The access road was in good condition. |
| 1071664791 | 2014-02-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was at a measured depth of 6230. They were drilling laterally in the Clinton sandstone. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 1216264994 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that all of the drilling equipment had been moved off of the location. The well was shut in. The pit was still open. The fluid level was approximately 2 feet down and there were no sags or tears in the liner. I found no leaks or spills around the drill site. |
| 1232011407 | 2020-3-3 0:00:0 | PW | No Violations | 0.50 |
| 1389366974 | 2014-01-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling Rig 200 was moving onto the location and rigging up. The drill pit was not constructed. I met with Scott Kees at the location. He estimated that they would spud the well by 1/12/14. |
| 1389621885 | 2014-01-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was rigged up, but not drilling. The pit was dug and lined, and all of the drilling equipment was in place. They expect to spud the well later today. |
| 1389794846 | 2014-01-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was tripping out of the hole to change bits. They reported that they ran in to the kick plug with a PDC bit when NGO decided to switch over to a tri-cone bit for the kick-off. The kick off point will be at 2245. They intend to drill the curve with the tri-cone bit, at which point they will switch back to the PDC for the horizontal. The permit was posted, there were no leaks or spills and there were no sags or tears in the pit liner. |
| 1389902831 | 2014-01-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was drilling on fluid at a depth of 2365 The permit was posted in the doghouse. There were no sags or tears in the pit liner and I found no leaks or spills. |
| 1390489670 | 2014-01-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was drilling on fluid at a depth of 3200. They were routing their cuttings through shale shakers. The permit was posted in the doghouse. There were no sags or tears in the pit liner and I found no leaks or spills. |
| 1391093272 | 2014-01-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was at a depth of 3694. They were tripping out of the hole to replace the down-hole motor. The mud pumps were back in operation, the pit was thawed and they were circulating the hole. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 1392389119 | 2014-02-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 had reached a total depth of 6759. They were running in with a 7.875 tri-cone bit to ream the hole before running casing. |
| 1392738419 | 2014-02-18 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 ran new 5.5 production casing on 2/17/14. Baker Hughes cemented the casing with 631 sacks of cement. HAD was rigging down. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 1556127676 | 2019-04-24 | Production Wells | No Violations | On the day of my inspection I was accompanied to the well site by inspector John Fleming. We found that the electric powered pumping unit was in operation. There were no major leaks around the wellhead. The Baird valves were dripping, but the pumper had absorbent pads under to catch the oil drops. There were no leaks or spills around the production equipment, and correct identification was posted. Appalachian Solvents showed up to treat the well while we were at the location. |
| 1571343920 | 2019-10-16 0:00 | PW | No Violations | 0.50 |
| 1600168790 | 2014-01-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was not drilling. The project was on temporary hold for repairs to the mud pump. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 1740224640 | 2017-11-07 | Production Wells | No Violations | On the day of my inspection I found that the pumping unit was being serviced. NGO pumper Jeff Butler was replacing the drive belts from the electric motor to the pulley. Jeff started the pumping unit before he left. There were no leaks around the pumping unit or production equipment. Correct, legible identification was posted on one of the storage tanks. |
| 1747119287 | 2013-12-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the location was almost finished. I contacted Scott Kees who reported that the drilling rig was scheduled to move in on Dec. 13, 2013. |
| 1922619620 | 2013-10-16 | Plug / Plug Back | No Violations | On the day of my inspection I found that RB Drilling had 2 upset tubing set at 2634. Baker Hughes broke circulation and pumped 165 sack of class A cement for a 500 kick-off plug at the top of the Big Lime. |
| 1961226162 | 2013-10-12 | Drill / Deepen / Reopen | No Violations | Scott Kees reported that RB Drilling ripped the 4.5 casing at 3150, pulled it and ran back in on a packer to 620 to set in the bottom joint of the 8.625 surface casing. They loaded the surface casing with fresh water and pressured up to 305 psi. He reported that the pressure was still holding at 300 psi after 30 minutes. |
| 2074032959 | 2014-07-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the wellhead was equipped with a plunger lift system. The well was set up to flow back into a 500 barrel frac tank. There was 500 psi on the tubing. A crew was on location installing the tank battery. I found no leaks or spills. |
| 2124900127 | 2017-09-29 | Production Wells | No Violations | On the day of my inspection I found that the pumping unit was in operation. There were no leaks or spills around the wellhead or the production tanks. The identification sign was legible and correct. The access road was in good condition and the site was well covered in vegetation. |
| 2131161938 | 2014-02-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that HAD Drilling rig 200 was at a measured depth of 4818. They were drilling laterally in the Clinton sandstone. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site. |
| 581330606 | 2013-12-23 0:00 | DD | No Violations | |
| 64823008 | 2014-12-15 0:00 | PL | No Violations | |
| 788647260 | 2013-10-11 0:00 | PB | No Violations | |
| 824187591 | 2016-1-25 0:00: | PW | No Violations | 0.50 |
| 899392384 | 2016-8-11 0:00: | PW | No Violations | 1.00 |
For data sources see[10]