If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-031-26796 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-82.11,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Coshocton | |
| Municipality: Perry Township | |
| Operator Name: DERRICK PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: ROWE | |
| License Status: Final Restoration | |
| License Date: 2015-03-03 | |
| Spud Date: 2000-12-15 | |
| Spud Drilling Contractor: PINNACLE DRILLING | |
| Final Drill Date: 2000-12-19 | |
| Well Total Depth: 3491.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.250000 | |
| Longitude: -82.110000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2000-12-04 | 37 HOPCO RESOURCES INC Proposed Formation CLINTON Issued Date 12/4/00 Expired Date 12/4/01 6:00:00 AM |
| Original Spud | 2000-12-15 | RBDMS Rec |
| Completed | 2000-12-19 | RBDMS Rec |
| Reached Total Depth | 2000-12-19 | RBDMS Rec |
| Completion Report Received | 2001-05-11 | RBDMS Rec |
| Change of Owner | 2004-03-17 | Operator changed from 37, HOPCO RESOURCES INC to 296, DERRICK PETROLEUM INC |
| APP | 2015-03-03 | Proposed Formations:CLINTON, Issued Date:3/3/2015, Expired Date:3/2/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2015-09-10 | RBDMS Rec |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
| Construction Permit Expires | 2017-03-02 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2001-07-11 | 3408 | 3421 | 26 |
| 3408 | 3421 | 26 | |
| 3408 | 3421 | 26 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 55190 Gal | 70000 | 300 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | HOPCO RESOURCES INC | 149.00 | 56.00 | 293 |
| 2002 | HOPCO RESOURCES INC | 1228.00 | 147.00 | 365 |
| 2003 | HOPCO RESOURCES INC | 1419.00 | 75.00 | 365 |
| 2004 | HOPCO RESOURCES INC | 231.00 | 0.00 | 365 |
| 2005 | DERRICK PETROLEUM INC | 621.00 | 39.00 | 265 |
| 2006 | DERRICK PETROLEUM INC | 332.00 | 37.00 | 365 |
| 2007 | DERRICK PETROLEUM INC | 426.00 | 15.00 | 365 |
| 2008 | DERRICK PETROLEUM INC | 322.00 | 0.00 | 365 |
| 2009 | DERRICK PETROLEUM INC | 130.00 | 0.00 | 365 |
| 2010 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 365 |
| 2011 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 0 |
| 2012 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 366 |
| 2013 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 0 |
| 2014 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 0 |
| 2015 | DERRICK PETROLEUM INC | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | HOPCO RESOURCES INC | Brine | 190 | 293 |
| 2002 | HOPCO RESOURCES INC | Brine | 420 | 365 |
| 2003 | HOPCO RESOURCES INC | Brine | 280 | 365 |
| 2004 | HOPCO RESOURCES INC | Brine | 0 | 365 |
| 2005 | DERRICK PETROLEUM INC | Brine | 225 | 265 |
| 2006 | DERRICK PETROLEUM INC | Brine | 80 | 365 |
| 2007 | DERRICK PETROLEUM INC | Brine | 200 | 365 |
| 2008 | DERRICK PETROLEUM INC | Brine | 160 | 365 |
| 2009 | DERRICK PETROLEUM INC | Brine | 0 | 365 |
| 2010 | DERRICK PETROLEUM INC | Brine | 0 | 365 |
| 2011 | DERRICK PETROLEUM INC | Brine | 0 | |
| 2012 | DERRICK PETROLEUM INC | Brine | 0 | 366 |
| 2013 | DERRICK PETROLEUM INC | Brine | 0 | 0 |
| 2014 | DERRICK PETROLEUM INC | Brine | 0 | 0 |
| 2015 | DERRICK PETROLEUM INC | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1220226070 | 2015-2-10 0:00: | PW | No Violations | |
| -1507719445 | 2009-1-28 0:00: | PW | No Violations | |
| -1507789029 | 2015-8-21 0:00: | PW | No Violations | |
| 001287i708 | 2002-05-03 | Preliminary Restoration | No Violations | rest pasted |
| 0096025539 | 2016-08-10 | Final Restoration | No Violations | I was contacted by Travis Dugan to notify me that the separator and associated materials had been removed. On the day of my inspection I found that The separator and the plastic lines had been removed. This site passes final restoration. |
| 0214555546 | 2003-05-06 | Production Wells | No Violations | |
| 0473643715 | 2007-10-17 | Production Wells | No Violations | Well in production . |
| 1147276335 | 2006-05-10 | Production Wells | No Violations | Well in production . |
| 1220226070 | 2015-02-10 | Production Wells | Violations Noted | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The valves from the tubing and casing were closed. The polished rod was dry, the motor and gearbox were overgrown with weeds and the wellhead was blocked in with straw bails. I found no storage tanks. There was a separator near the wellhead. There was plastic gas line connected to the separator. No identification was posted. This well has had no production reported since 2009. This well must be plugged within 180 days of the issuance of this compliance notice. |
| 1287i708 | 2002-5-3 0:00:0 | PL | No Violations | |
| 1441721618 | 2015-09-08 | Plug / Plug Back | No Violations | On the day of my inspection I found that Mike Wheeler was rigged up to plug the well. He was running 1.5 tubing to a depth of 3437. Cemenco pumped a 30 sack class A cement bottom plug. |
| 1441814323 | 2015-09-09 | Plug / Plug Back | No Violations | On the day of my inspection Mike Wheeler ripped the 4.5 casing at 2933. He pulled the casing from the well and then ran 1.5 tubing back in to 2496 in order to set a cement plug at the top of the Big Lime. |
| 1441897523 | 2015-09-10 | Plug / Plug Back | No Violations | On the day of my inspection I found that Mike Wheeler had 1.5 tubing ran to 2496. Cemenco established circulation and pumped a 200 cement plug at the top of the Big Lime. Cemenco also pumped cement plugs through the Berea and at the base of the surface casing. Circulation was established and maintained through both plugs. The fluid started to fall when Cemenco was pumping the surface plug. Wheeler pulled the remaining tubing and they found the fluid to be down approximately 180 to 200. Cemenco bridged the well at the top of the fluid with block and stone, and filled the well to surface with cement. The cement stayed up in the surface casing 10 inches from the top. |
| 1507719445 | 2009-01-28 | Production Wells | No Violations | Well capable of production . |
| 1507789029 | 2015-08-21 | Production Wells | No Violations | On the day of my inspection I found that the well was still sitting idle. The wellhead and pumping unit were surrounded with shrubs and weeds. The belts and pulleys on the motor were entwined with vines. Access to the wellhead was blocked by hay bails. There was a plugging permit issued on 3/3/15. I called Dwayne Dugan to ask when he planned to plug the well. He argued that he never received the compliance notice and that he voluntarily obtained the plugging permit, thereby giving him two years to plug the well. I informed him that we did send the compliance notice on 2/11/15 and it stipulated that the well was to be plugged within 180 days. Dwayne called me back after he located the original compliance notice and agreed on the previously discussed plug-by date. He asked for 30 days to get a rig lined up. I granted him a 30 day extension from today. |
| 1991035303 | 2016-06-08 | Final Restoration | No Violations | On the day of my inspection I found that the well site and access road had been graded out to the contour of the surrounding landscape and the were growing with well established hayfield vegetation. There were no erosion issues. There was still a vertical separator and some plastic line left along the fencerow where the tank battery was once located. I called Travis Dugan and left a message. |
| 214555546 | 2003-5-6 0:00:0 | PW | No Violations | |
| 473643715 | 2007-10-17 0:00 | PW | No Violations | |
| 96025539 | 2016-8-10 0:00: | FR | No Violations | 1.00 |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 1220226070 | US-OH-105897 | 2015-09-17 | Well shall be plugged |
For data sources see[9]