X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27127

Well Details

Well ID: 34-031-27127
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Pike Township
Operator Name: RDB DRILLING LLC
Well Pad ID:
Farm/Lease Name: MOORE
License Status: Producing
License Date: 2009-12-02
Spud Date: 2010-01-04
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2010-01-18
Well Total Depth: 3300.00 ft
Configuration: Vertical
Latitude: 40.220000
Longitude: -82.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-12-02 Proposed Formations:CLINTON, Issued Date:12/2/2009, Expired Date:12/2/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-01-18
Completion Report Received 2010-11-15
Construction Permit Expires 2010-12-02
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-01-05 3216 3250 70
3216 3250 70
3216 3250 70

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-08-24 H2O 15 2400 Bbl 50000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 HOPCO RESOURCES INC 85.00 401.00 114
2011 HOPCO RESOURCES INC 239.00 583.00 365
2012 HOPCO RESOURCES INC 285.00 306.00 366
2013 HOPCO RESOURCES INC 209.00 259.00 365
2014 HOPCO RESOURCES INC 41.00 148.00 365
2015 HOPCO RESOURCES INC 5.00 231.00 365
2016 HOPCO RESOURCES INC 35.00 175.00 365
2017 HOPCO RESOURCES INC 28.00 138.00 365
2018 HOPCO RESOURCES INC 87.00 100.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 HOPCO RESOURCES INC Brine 403 114
2011 HOPCO RESOURCES INC Brine 550 365
2012 HOPCO RESOURCES INC Brine 366 366
2013 HOPCO RESOURCES INC Brine 351 365
2014 HOPCO RESOURCES INC Brine 173 365
2015 HOPCO RESOURCES INC Brine 419 365
2016 HOPCO RESOURCES INC Brine 192 365
2017 HOPCO RESOURCES INC Brine 282 365
2018 HOPCO RESOURCES INC Brine 160 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2013184371 2010-8-24 0:00: CT No Violations
-998533328 2010-1-22 0:00: DD No Violations
0216625803 2016-09-07 Production Wells No Violations On the day of my inspection I found that the stuffing box had been cleaned. The oil impacted soil around the wellhead head been scraped up and the area had been treated with Bio-sorb. New gravel had been spread around the wellhead. Correct, legible identification had been posted at the tank battery. The compliance issues have been resolved.
0998533328 2010-01-22 Drill / Deepen / Reopen No Violations Well drilled , rig moving out this date .
1262979196 2010-01-08 Drill / Deepen / Reopen No Violations H & D Drilling , Formation cementing . Ran 7 casing and cemented , good returns .
1288109922 2010-10-26 Preliminary Restoration No Violations Well in production. Pit and location graded and seeded. Vegetation started
1355611300 2016-07-19 Production Wells Violations Noted On the day of my inspection I found that the well was being produced with an electric powered pumping unit. The motor was intact, the lines were connected and the valves were open. The unit was in operation at the time of inspection. The stuffing box was covered in oil, and there was a 2 x 4 area of oil soaked soil and gravel around the wellhead. The tank battery consisted of two separate dikes. The upper dike contained on 100 barrel steel tank and one vertical separator. The lower dike contained one 100 barrel steel tank. I found no leaks or spills around the tank battery. There was no identification posted for this well. The issues that need to be addressed to bring this well into compliance are: remove the oil impacted soil and gravel around the wellhead, and post correct, legible identification at the tank battery. I called Gary Hopkins to go over the compliance issues. He agreed to have everything taken care of within 30 days.
1644642736 2010-04-28 Production Wells No Violations Drilling pit closed . Well not in production this inspection .
2013184371 2010-08-24 Completion Testing No Violations Well fraced this date , 340 gal acid , 500 lb sand and 800 bl water . Frac witnessed.
216625803 2016-9-7 0:00:0 PW No Violations 0.70

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1355611300 US-OH-110292 2016-09-29 Well operation causing pollution and contamination
1355611300 US-OH-110293 2016-09-29 Failure to legibly identify well

For data sources see[9]

References