If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27160 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.19,"lon":-82.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Pike Township | |
Operator Name: WHEELER MICHAEL D | |
Well Pad ID: | |
Farm/Lease Name: MINNICH | |
License Status: Producing | |
License Date: 2011-08-03 | |
Spud Date: 2011-09-29 | |
Spud Drilling Contractor: WHEELER MICHAEL D | |
Final Drill Date: 2012-01-12 | |
Well Total Depth: 3106.00 ft | |
Configuration: Vertical | |
Latitude: 40.190000 | |
Longitude: -82.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-03 | Proposed Formations:CLINTON, Issued Date:8/3/2011, Expired Date:8/2/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-01-12 | |
Completion Report Received | 2012-03-16 | |
Construction Permit Expires | 2013-08-02 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-04-06 | 3066 | 3106 | 0 |
3066 | 3106 | 0 | |
3066 | 3106 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-01-16 | H2O | 0 | 60307 Gal | 30000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MACKENCO INC | 0.00 | 442.00 | 366 |
2013 | MACKENCO INC | 0.00 | 510.00 | 365 |
2014 | MACKENCO INC | 0.00 | 347.00 | 365 |
2015 | HOPCO RESOURCES INC | 0.00 | 0.00 | 0 |
2016 | MACKENCO INC | 0.00 | 182.00 | 365 |
2017 | MACKENCO INC | 0.00 | 198.00 | 365 |
2018 | MACKENCO INC | 0.00 | 133.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MACKENCO INC | Brine | 1383 | 366 |
2013 | MACKENCO INC | Brine | 810 | 365 |
2014 | MACKENCO INC | Brine | 805 | 365 |
2015 | HOPCO RESOURCES INC | Brine | 0 | 0 |
2016 | MACKENCO INC | Brine | 38 | 365 |
2017 | MACKENCO INC | Brine | 37 | 365 |
2018 | MACKENCO INC | Brine | 77 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1035441073 | 2015-6-25 0:00: | PL | No Violations | |
-1458775791 | 2011-12-27 0:00 | DD | No Violations | |
-2108840244 | 2015-9-11 0:00: | PL | No Violations | |
0094003298 | 2015-05-14 | Preliminary Restoration | No Violations | On the day of my inspection I found that the hillside along the lease road was bare and eroding. I contacted Mac McConnell and told him that the restoration must be finished right away. |
0178148773 | 2011-10-04 | Completion Testing | No Violations | Well fracked this date by Producers. |
0505167949 | 2015-07-23 | Preliminary Restoration | Violations Noted | On the day of my inspection I found that the south bank of the well site had no established vegetation for erosion control. The bank was heavily rutted and washed-out from erosion. The preliminary restoration for this site was due on 9/29/2011. Re-grade and re-seed the south bank of the well site within 90 days. |
1035441073 | 2015-06-25 | Preliminary Restoration | No Violations | On the day of my inspection I found that no work had been done on the restoration. I met Mike Wheeler at the site. He claimed that the rain has prevented them from getting in to do any work. |
1204080416 | 2015-10-13 | Preliminary Restoration | No Violations | On the day of my inspection I found that the hillside above the well was approximately 85% covered in short grass. A diversion ditch and culvert had ben installed to control rain water. I found no further signs of erosion or run-off. This site passes preliminary restoration. |
1317131445 | 2011-09-27 | Drill / Deepen / Reopen | No Violations | Mike Wheeler moved on location to start drilling. |
1317906721 | 2011-10-06 | Drill / Deepen / Reopen | No Violations | Ran surface casing and cemented. |
1318883178 | 2011-10-17 | Drill / Deepen / Reopen | No Violations | Ran 7 casing and power mudded by cemenco. Casing will be left in well. |
1325780754 | 2012-01-05 | Drill / Deepen / Reopen | No Violations | Ran 5.5 casing and cemented by Cemenco cementing. |
1458775791 | 2011-12-27 | Drill / Deepen / Reopen | No Violations | Cable tool rig drilling Big Lime formation. |
178148773 | 2011-10-4 0:00: | CT | No Violations | |
2108840244 | 2015-09-11 | Preliminary Restoration | No Violations | On the day of my inspection I found that the bank had been graded out, seeded and covered in straw. The grass was just starting to come up. |
505167949 | 2015-7-23 0:00: | PL | No Violations | |
94003298 | 2015-5-14 0:00: | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0505167949 | US-OH-125513 | 2015-11-10 | Failure to restore within six months |
For data sources see[9]