If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27164 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Jackson Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS | |
License Status: Producing | |
License Date: 2011-08-08 | |
Spud Date: 2011-10-11 | |
Spud Drilling Contractor: FMS DRILLING | |
Final Drill Date: 2011-10-22 | |
Well Total Depth: 3990.00 ft | |
Configuration: Vertical | |
Latitude: 40.250000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-08 | Proposed Formations:BEREA - CLINTON, Issued Date:8/8/2011, Expired Date:8/7/2013 12:00:00 PM, Drilling unit acres:105.18, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-10-22 | |
Completion Report Received | 2013-05-02 | |
Construction Permit Expires | 2013-08-07 | |
Change of Owner | 2018-03-07 | Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2018-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-05-03 | 3893 | 3942 | 58 |
3893 | 3942 | 58 | |
3893 | 3942 | 58 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-11-18 | H2O | 15 | 2300 Bbl | 40000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 0 |
2012 | NGO DEVELOPMENT CORP. | 428.00 | 0.00 | 220 |
2013 | NGO DEVELOPMENT CORP. | 309.00 | 0.00 | 365 |
2014 | NGO DEVELOPMENT CORP. | 938.00 | 289.00 | 365 |
2015 | NGO DEVELOPMENT CORP. | 371.00 | 69.00 | 365 |
2016 | NGO DEVELOPMENT CORP. | 462.00 | 99.00 | 365 |
2017 | NGO DEVELOPMENT CORP. | 568.00 | 56.00 | 365 |
2018 | NGO DEVELOPMENT CORP. | 357.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | NGO DEVELOPMENT CORP. | Brine | 85 | |
2012 | NGO DEVELOPMENT CORP. | Brine | 0 | 220 |
2013 | NGO DEVELOPMENT CORP. | Brine | 0 | 365 |
2014 | NGO DEVELOPMENT CORP. | Brine | 139 | 365 |
2015 | NGO DEVELOPMENT CORP. | Brine | 57 | 365 |
2016 | NGO DEVELOPMENT CORP. | Brine | 29 | 365 |
2017 | NGO DEVELOPMENT CORP. | Brine | 31 | 365 |
2018 | NGO DEVELOPMENT CORP. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1907125903 | 2011-10-5 0:00: | DD | No Violations | |
-274427794 | 2011-10-13 0:00 | DD | No Violations | |
-929048091 | 2012-11-19 0:00 | PL | No Violations | |
0274427794 | 2011-10-13 | Drill / Deepen / Reopen | No Violations | Drilling cement out of 8 casing 495. |
0541994376 | 2011-11-18 | Completion Testing | No Violations | Producers fracing well. |
0929048091 | 2012-11-19 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drill site was graded out with well established vegetative cover. The well head was equipped with a pumping unit and connected to a tank battery that consisted of one 100 barrel stock tank, one 50 barrel brine tank, one separator and an earthen dike. There were no leaks or spills and proper identification was posted. This site passes preliminary restoration. No violations at this time. |
1027010108 | 2015-03-19 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a pumping unit. The motor was intact, the valves were open and the polished rod showed signs of recent use. The tank battery consisted of one 100 barrel tank, one 50 barrel tank, one separator and an earthen dike. Proper identification was posted an I found no leaks or spills. |
1318351407 | 2011-10-11 | Drill / Deepen / Reopen | No Violations | Drilling 2 190. ( FMS drilling ) |
1318531136 | 2011-10-12 | Drill / Deepen / Reopen | No Violations | Ran 8 casing and cemented. Good circulation at start of cement mixing, released plug to start cement down and out back side of casing. Cement locked up with cement 100 up back side of casing. Cement inside casing is at 240. Let cement set up for 8 hrs. went back in hole to drill cement out to run bond log and try and perforate casing and squeeze cement on back side of casing to surface. |
1907125903 | 2011-10-05 | Drill / Deepen / Reopen | No Violations | Meet with landowner and Scott Kees with NGO devel. Went over new well site on lease to be drilled. |
1978465089 | 2011-10-13 | Drill / Deepen / Reopen | No Violations | Let cement set up for 8 hrs. went back in hole to drill cement out of 8 casing. Ran bond log to find top of cement on back side of casing. Going to perforate casing and squeeze cement on back side of casing to surface. |
541994376 | 2011-11-18 0:00 | CT | No Violations |
For data sources see[9]