If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-031-27185 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2,"lon":-81.67,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Coshocton | |
| Municipality: Linton Township | |
| Operator Name: MFC DRILLING INC | |
| Well Pad ID: | |
| Farm/Lease Name: GAULT | |
| License Status: Producing | |
| License Date: 2011-12-22 | |
| Spud Date: 2012-03-15 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 2012-03-21 | |
| Well Total Depth: 4528.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.200000 | |
| Longitude: -81.670000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-12-22 | Proposed Formations:CLINTON, Issued Date:12/22/2011, Expired Date:12/21/2013 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-03-21 | |
| Completion Report Received | 2012-09-14 | |
| Construction Permit Expires | 2013-12-21 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-10-04 | 4371 | 4376 | 5 |
| 2012-10-04 | 4392 | 4402 | 26 |
| 4371 | 4376 | 5 | |
| 4392 | 4402 | 26 | |
| 4371 | 4376 | 5 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-08-30 | H2O | 15 | 115243 Gal | 33700 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | MFC DRILLING INC | 0.00 | 0.00 | 0 |
| 2013 | MFC DRILLING INC | 2621.00 | 0.00 | 365 |
| 2014 | MFC DRILLING INC | 3538.00 | 69.00 | 365 |
| 2015 | MFC DRILLING INC | 7179.00 | 0.00 | 365 |
| 2016 | MFC DRILLING INC | 5815.00 | 131.00 | 365 |
| 2017 | MFC DRILLING INC | 3651.00 | 149.00 | 365 |
| 2018 | MFC DRILLING INC | 2245.00 | 42.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | MFC DRILLING INC | Brine | 0 | 0 |
| 2013 | MFC DRILLING INC | Brine | 0 | 365 |
| 2014 | MFC DRILLING INC | Brine | 0 | 365 |
| 2015 | MFC DRILLING INC | Brine | 0 | 365 |
| 2016 | MFC DRILLING INC | Brine | 0 | 365 |
| 2017 | MFC DRILLING INC | Brine | 74 | 365 |
| 2018 | MFC DRILLING INC | Brine | 38 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1068903757 | 2012-3-16 0:00: | DD | No Violations | 4.00 |
| -400802916 | 2014-10-6 0:00: | PL | No Violations | |
| 0400802916 | 2014-10-06 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site was graded and growing with well established tall grasses. I found no drilling equipment or materials. The well site and lease road were covered with gravel. This well site passes preliminary restoration. |
| 1068903757 | 2012-03-16 | Drill / Deepen / Reopen | No Violations | On day of inspection Maric Drilling is setting 514of 8.625casing in 565of 11open hole. Petroset is Cementing casing in place with 250 sks of cement. Good circulation. Ran 100%excess and had 20 barrel of returns. There was 85 feet of 11.75 conductor cemented back to surface on 3-15-12. |
| 1342296696 | 2012-07-09 | Completion Testing | No Violations | On day of inspection Chris Grim and I looked at site. Well has not been fraced yet. Restoration has not been completed. |
For data sources see[9]