34-031-27205

Well Details

Well ID: 34-031-27205
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Oxford Township
Operator Name: DEVON ENERGY PRODUCTION CO LP
Well Pad ID: US-OH-000609
Farm/Lease Name: J HILL
License Status: Plugged Back
License Date: 2012-09-04
Spud Date: 2012-11-03
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-11-19
Well Total Depth: 10456.00 ft
Configuration: Vertical
Latitude: 40.230000
Longitude: -81.690000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-04 Proposed Formations:BLACK RIVER, Issued Date:9/4/2012, Expired Date:9/4/2014 12:00:00 PM, Drilling unit acres:434.07, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-11-19
Construction Permit Expires 2014-09-04
Record Last Modified 2016-03-24

For data sources see[2]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 DEVON ENERGY PRODUCTION CO LP Brine 0 0

For data sources see[3] [4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1004003740 2015-4-2 0:00:0 DD No Violations 4.00
-1179550804 2015-5-18 0:00: PL No Violations
-1221664622 2019-10-16 0:00 PW No Violations 1.30
-1327966618 2012-11-8 0:00: DD No Violations
-1470634951 2018-2-21 0:00: PW No Violations 1.00
-1525176664 2012-11-13 0:00 DD No Violations
-1648867685 2012-11-19 0:00 DD No Violations
-1706121525 2015-6-2 0:00:0 PL No Violations
-1858003039 2012-11-5 0:00: DD No Violations
-1912127169 2012-11-2 0:00: DD No Violations
-260513469 2012-10-17 0:00 DD No Violations
-327136927 2012-10-29 0:00 DD No Violations
-572512047 2015-9-29 0:00: PL No Violations
-894933605 2019-2-27 0:00: TI No Violations 0.70
0164612221 2015-08-18 Preliminary Restoration No Violations On the day of my inspection I found that the wash-out and the one bare hillside had not been addressed. I called and left a message with Ron Romanetti in regards to getting the restoration finished. He returned my call and claimed that he was awaiting authorization from Devon energy to complete the work.
0260513469 2012-10-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drill pad and lease road were fully constructed and graveled. Drainage was in place and the berms were seeded/strawed. The drilling rig was not on location. Security was posted at the site entrance.
0327136927 2012-10-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Rig #254 was in the process of rigging up. Most of the drilling equipment was on location. The well was not yet spudded. The permit was in the company mans trailer and the permit information was displayed on operators signs at the site entrance and at the access road entrance. There were no leaks or spills. No violations at this time.
0374964688 2012-11-21 Drill / Deepen / Reopen No Violations At the time of my inspection Halliburton was on location preparing their equipment to cement the production casing. See casing report for details.
0572512047 2015-09-29 Preliminary Restoration No Violations On the day of my inspection I found that the wash-out and the one bare hillside had not been addressed. I sent an email to Brian Schmit of Devon Energy detailing the problems with the restoration and requesting that they be remediated as soon as possible.
0573378871 2012-11-06 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson #254 was not drilling. They were in the process of replacing the blind rams on the blow out preventer (BOP). Doug Plummer of Devon Energy reported that the blind rams failed to open after the BOP test. The charts indicated the BOP passed all pressure tests at 5000 psi. There were no leaks or spills. No violations at this time.
0678829803 2015-10-01 Preliminary Restoration No Violations I was contacted by Ron Romanetti of ROC Services to inform me that he received authorization from Devon Energy to address my concerns with the restoration. He is scheduled to start work the first week of October.
0801677315 2018-02-14 Production Wells No Violations I received a phone call from Eric Brown with Geopetro to let me know that he got the identification sign updated. He also said that he has submitted his application and associated fees to continue the temporary inactive status through 2018. On the day of my inspection I found that the identification sign at the site entrance gate had been updated with the correct information.
0894933605 2019-02-27 Temporary Inactive Well Status No Violations I received a copy of Chiefs Order 2018-399 in December of 2018 which stated that Geopetro was denied another year of temporary inactive status. The well status has since been changed to SI (shut in). On the day of my inspection I found that the identification sign at the access road entrance gate was updated with Geopetros information. The gate was unlocked and open. The access road was still in good condition and easily passable with a passenger vehicle. The well pad was still in good condition and free of debris. The restored land along the access road and around the perimeter of the well pad was 95% covered with established vegetative growth. There were some bare spots, but there were no issues with erosion. The well was equipped with a wellhead and two gate valves. The wellhead was capped and the valves were closed. The cellar was covered with a steel grate and full of water. There was a steel tubular barrier around the wellhead. There were no signs of fluid or gas leaks from the wellhead. The water in the cellar was covered with a layer of ice. I called Eric Brown with Geopetro to get an update on the plan. He did not answer so I left a voice message.
1004003740 2015-04-02 Drill / Deepen / Reopen No Violations Per the request of the County Inspector I looked at the well and the site in response to an application for Temporary Inactive Status with him. The wellhead area is acceptable. East of the well pad is not reclaimed and some erosion issues have been formed. There have been people with 4 wheel drive vehicles try going up the east wall. The lease road is acceptable. The well has been drilled and cased but never completed. There are no tanks at the site.
1179550804 2015-05-18 Preliminary Restoration No Violations On the day of my inspection I found that the preliminary restoration work had not been started. I found substantial erosion after two days of rainfall. I tried to contact Ron Romanetti of ROC Services, and left a message for him to return my call. I contacted Jillian Mershon of Devon Energy, to inquire about the restoration issues. She claimed she would get me an answer with the next two days. Ron Romanetti returned my call. He claimed he was waiting for his contact from Devon, Brian Schmitt, to give the word to move in and get started.
1304837933 2015-04-07 Production Wells No Violations I contacted Devon Energy to report that I found evidence of camp fires, firearms use and atv use on their drill pad. I requested that they secure the pad to prevent trespassing. I also requested that they address the erosion issues to complete the preliminary restoration before temporary inactive status will be considered.
1327966618 2012-11-08 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson Drilling #254 drilled a 12.25 hole on fluid to 1125. They ran 9.625 casing to 1125 and picked up 1 off bottom. Patterson #254 circulated the hole with their mud pump for approximately 2 hours. Halliburton pumped 25 barrels of gel spacer, followed by 380 sacks of cement. They displaced with 10 barrels of fresh water and 72 barrels of salt water, landed the plug and bumped the plug to an additional 500 psi. There was good circulation throughout the job with approximately 12 barrels of cement returns.
1349443101 2012-10-04 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the lease road was cut and 90 percent graveled. Drainage and erosion control measure were in place; culverts were installed and the berms were seeded. The drill pad was still under construction. Butchs Rathole Svc was drilling a 30 conductor hole with a track mounted auger bit, they were at a depth of 45. New 20 conductor casing and new 13.375 casing was staged on location. No violations at this time.
1349462663 2012-10-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Butchs Rat Hole Svc had drilled a 30 hole to 91 with an auger style rig. They ran 85 of 20 110lb/ft conductor casing, fitted with a float shoe/cement retainer. They stung into the float shoe with 3.5 casing. Petroset broke circulation, pumped 200 lbs gel, followed by 370 sx cement. Good circulation was maintained throughout the job. The cement was just starting to circulate to surface when the truck ran out. The fluid level did not fall when they shut down. My recommendation to the crew was to let the cement set up, tag the cement top, and either grout it to surface or use ready-mix cement.
1351999732 2012-11-02 Drill / Deepen / Reopen No Violations Chris Grimm and I met the company man and the saftey man at the Patterson rig 254. They just installed a new mast on the large triple rig.
1352134092 2012-11-04 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson Drilling #254 drilled a 17.5 hole on fluid to 442. They ran 13.375 casing to 442 and picked up 2 off bottom. Patterson #254 circulated the hole with their mud pump for approximately 2 hours. Halliburton pumped 25 barrels of gel spacer, followed by 5 barrels of fresh water and 111 barrels (510 sacks) of cement. They displaced with 62.72 barrels of fresh water, landed the plug and bumped the plug to an additional 500 psi. There was good circulation throughout the job with approximately 45 barrels of cement returns.
1352498179 2012-11-08 Drill / Deepen / Reopen No Violations On site with Central Office staff leading tour of drill sites explaining what different procedures rig crews were performing while group was on site and explaining what a BOP does and the differences in casing and drill pipe and collars and other equipment they observed while on site.
1353035010 2012-11-08 Drill / Deepen / Reopen No Violations On day of inspection the tour of the Columbus staff was purpose of being on site. Rig was nippling down to get ready to install BOPs. Heather Stone, Eddie Guadro were escorting the group at the facility.
1354543953 2012-12-03 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling rig #254 was no longer on location. All drilling equipment and personnel trailers were removed from the location. The well head was shut in and fenced. There were no leaks or spills and the permit information was displayed on the operators sign at the site entrance. Security guards were still posted at the entrance. No violations at this time.
1386857414 2013-12-12 Preliminary Restoration No Violations On the day of my inspection I found that the well was shut in. There was no production equipment. The drill pad was fenced with orange temporary fencing. The ground was snow covered . Identification was posted on the gate at the lease road entrance.
1428079118 2015-04-02 Production Wells No Violations I received an application for Temporary Inactive Well Status. This well has been drilled, but not completed. It has been sitting idle for 2 years 5 months. On the day of my inspection I found that the wellhead was shut in and fenced. I found no leaks or spills around the wellhead. Identification was posted at the gate, but not at the wellhead. There was no tank battery or production equipment associated with this well. The lease road was in good condition. There were a few areas along the road that were starting to erode. There was also an area on the lower side of the well pad that was starting to wash out and erode. Good vegetative cover for erosion control has never been established around the well pad. Additionally, I found evidence that people have been riding off-road vehicles, burning small fires and shooting firearms on and around the well pad. I recommend that the well pad be fenced. I do not recommend that temporary inactive status be granted until the preliminary restoration is complete.
1430495854 2015-05-01 Preliminary Restoration No Violations On the day of my inspection I met Ron Romanetti, of R.O.C. Service Co., at the well pad to discuss the work needed to complete the preliminary restoration. We walked the site and the lease road to identify the problem areas. Mr. Romanetti claimed he would relay the information to Devon Energy and get started as soon as possible.
1432816569 2015-05-28 Preliminary Restoration No Violations I received a call from Ron Romanetti of ROC Services on 5/23/15 to notify me that they were moving in to start the remediation of the preliminary restoration. On the day of my inspection I found that there were no personnel or equipment on location. No work had been started.
1434119852 2015-06-11 Preliminary Restoration No Violations On the day of my inspection I found that hydro-seed had been applied to all of the bare areas throughout the length of the lease road and around the entire well pad.
1436451332 2015-07-09 Preliminary Restoration No Violations On the day of my inspection I found that 95% of the areas that had been graded and hydro-seeded were growing with well established grass. I found one area along the lease road where the grass didnt germinate. I also found that the area on the lower well pad wall where the major wash out had occurred was washing out again. I contacted Ron Romanetti of ROC Services to discuss the issues. I suggested that they burry a drainage pipe in the wash out to divert rain water run off. I also requested that the bare area along the lease road be re-seeded. Romanetti said that he would be out of state until the first of August, and he would address the issues upon his return.
1445608649 2015-10-23 Preliminary Restoration No Violations On the day of my inspection I was contacted by Ron Romanetti of ROC Services to notify me that he was out to address the remaining issues with the restoration. I found that the bare hillside along the lease road had been covered with top soil, seeded and covered with straw. The washed out erosion ditch had been graded up and filled with rip-rap and the disturbed area around the drainage ditch had been seeded an covered with straw.
1460039335 2016-04-07 Production Wells No Violations I received an application for Temporary Inactive Well Status, second year. This well has been drilled, but not completed. It has been sitting idle for 3 years 5 months. On the day of my inspection I found that the wellhead was shut in and the gauge showed zero (0) psi. The cellar was full of water. It was covered with a steel grate and fenced with tubular steel. The mouse hole casing was capped. I found no leaks or spills around the wellhead. The entrance was gated and locked. Identification was posted at the gate, but not at the wellhead. There was no tank battery or production equipment associated with this well. The lease road and well pad were in good condition. There were still a few bare areas along the lease road, but there was no erosion. Approximately 90% of the site and lease road berms were covered in vegetation.
1466174054 2016-06-17 Preliminary Restoration No Violations On the day of my inspection I found that 95% of the disturbed area bordering the lease road and well pad were growing with well established vegetation. There were four relatively small areas where the grass had died, but the roots were still binding the soil and there were no erosion issues. This site passes preliminary restoration.
1470634951 2018-02-21 Production Wells No Violations I was contacted by DOGRM Central Office to notify me that Geopetro had requested another year of temporary inactive status on this well. On the day of my inspection I found that the identification sign at the access road entrance gate was updated with Geopetros information. The gate was unlocked and open. The access road was still in good condition and easily passable with a passenger vehicle. The well pad was still in good condition and free of debris. The restored land along the access road and around the perimeter of the well pad was 95% covered with established vegetative growth. There were some bare spots, but there were no issues with erosion. The well was equipped with a wellhead and two gate valves. The wellhead was capped and the valves were closed. The cellar was covered with a steel grate and full of water. There was a steel tubular barrier around the wellhead. I have spoken with Eric Brown of Geopetro, who claims they want to do a single stage frac on this well to assess the production potential. Eric said they will use that data to determine their course of action with regards to plugging the well or completing it for production.
1489160447 2017-03-10 Production Wells No Violations This inspection was conducted in response to an application for Temporary Inactive Well Status, year 3. This well has been drilled and cased, but not completed. On the day of my inspection I found that the wellhead was shut in and the gauge showed zero (0) psi. The cellar was full of water. It was covered with a steel grate and fenced with tubular steel. The mouse hole casing was capped. I found no leaks or spills around the wellhead. The entrance was gated and locked. Identification was posted at the gate, but not at the wellhead. There was no tank battery or production equipment associated with this well. The lease road and well pad were in good condition. There were still a few bare areas along the lease road, but there was no erosion. Approximately 90% of the site and lease road berms were covered in vegetation. There were no indications at the surface that the well was leaking.
1515770074 2018-01-12 Production Wells No Violations On the day of my inspection I found that the Devon Energy sign was posted on the gate at the lease road entrance. The road was still in good condition. There were some bare areas along the perimeter of the road, but there were no wash-outs or erosion. The well was still shut in and surrounded with a steel barrier. There were no signs of leaking around the wellhead components. I called Geopetro to ask that they get new identification posted to reflect the current well owners.
1516721719 2018-01-23 Production Wells No Violations I spoke with Eric Brown of Geopetro on 1/12/18 to ask that they get the identification sign updated to reflect the current owners. Eric said that he would take care of it right away. On the day of my inspection I found that the sign at the gate had not been updated and there was not any form of identification at the wellhead.
1518197105 2018-02-09 Production Wells No Violations On the day of my inspection I found that identification for Geopetro had not been posted. I called and left a voice message for Eric Brown with Geopetro to remind him of the need to update the ID sign and to remind him that the Temporary Inactive permit expires on 2/24/18.
1525176664 2012-11-13 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #254 was drilling on fluid with an 8.75 bit at a depth of 4644. The permit was displayed in the company trailer and there were no leaks or spills. No violations at this time.
164612221 2015-8-18 0:00: PL No Violations
1648867685 2012-11-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Drilling Rig #254 was not drilling. The well was drilled to a total depth of 10456, the rig was preparing to clean out the hole and lay down the drill pipe. The permit was displayed in the company trailer and there were no leaks or spills. No violations at this time.
1706121525 2015-06-02 Preliminary Restoration No Violations On the day of my inspection I found that ROC Services was on location working on the restoration. All of the bare, eroding areas had been re-graded. There were no more ruts or wash outs along the lease road or well pad. They were planning to hydro-seed the areas by the end of the week.
1802346585 2019-10-28 0:00 PW No Violations 0.40
1858003039 2012-11-05 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson Drilling Rig #254 was not drilling. The crew was in the process of nippling up the blow out preventer. The permit was in the company trailer and there were no leaks or spills. No violations at this time.
1912127169 2012-11-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Patterson Rig #254 was 90% rigged up. All of the drilling equipment was on location. The rig was waiting for electricity. The well was not yet spudded. The permit was in the company mans trailer and the permit information was displayed on operators signs at the site entrance and at the access road entrance. There were no leaks or spills. No violations at this time.
2044919153 2017-09-11 Production Wells No Violations This well recently changed ownership, so I came out to inspect the well site. I found that the identification sign at the entrance gate had been removed. The access road was in good condition. There were a few bare spots on the banks along the access road, but there were no erosion issues. The well site was clear of materials and debris. The wellhead was shut in and there was a barrier around the cellar. The gauge had been removed from the gate valve on the wellhead. There was water in the bottom of the cellar. I did not see any bubbling or discoloration in the water. There were no indications that the well was leaking. I called Eric Brown with Geopetro to ask what their plans were. Eric said that they planned to do one stage of the frac in order to assess the potential productivity of the well. He said that if the well didnt show anything they would most likely plug it. I left Eric know that the temporary inactive status year 3 permit expires on February 24, 2018. I also asked Eric to get a new identification sign posted at the gate.
374964688 2012-11-21 0:00 DD No Violations
573378871 2012-11-6 0:00: DD No Violations
678829803 2015-10-1 0:00: PL No Violations
778248082 2020-2-3 0:00:0 PW No Violations 0.50
801677315 2018-2-14 0:00: PW No Violations 1.00
910827420 2019-10-17 0:00 PW No Violations 0.60