X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27223

Well Details

Well ID: 34-031-27223
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Clark Township
Operator Name: JAMES R BERNHARDT INC
Well Pad ID:
Farm/Lease Name: JONES CLYDE
License Status: Producing
License Date: 2013-07-30
Spud Date: 2013-09-19
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2013-09-24
Well Total Depth: 3649.00 ft
Configuration: Vertical
Latitude: 40.420000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-30 Proposed Formations:CLINTON, Issued Date:7/30/2013, Expired Date:7/30/2015 12:00:00 PM, Drilling unit acres:123.2, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-09-24
Construction Permit Expires 2015-07-30
Completion Report Received 2016-05-20
Record Last Modified 2019-06-11

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 JAMES R BERNHARDT INC 4865.00 823.00 365
2015 JAMES R BERNHARDT INC 4164.00 442.00 365
2016 JAMES R BERNHARDT INC 2998.00 396.00 365
2017 JAMES R BERNHARDT INC 2272.00 288.00 365
2018 JAMES R BERNHARDT INC 1834.00 240.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 JAMES R BERNHARDT INC Brine 350 365
2015 JAMES R BERNHARDT INC Brine 0 365
2016 JAMES R BERNHARDT INC Brine 0 365
2017 JAMES R BERNHARDT INC Brine 365
2018 JAMES R BERNHARDT INC Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1628441278 2013-9-19 0:00: DD No Violations
-1886000017 2013-9-21 0:00: CS No Violations
-311846683 2014-6-6 0:00:0 PL No Violations
-613222345 2013-9-24 0:00: DD No Violations
-72049 2015-5-15 0:00: PL No Violations
0000072049 2015-05-15 Preliminary Restoration No Violations On the day of my inspection I found that the site was 100% covered in well established short grasses. I found no signs of erosion. I found no drilling materials or debris. This site passes preliminary restoration.
0179518083 2014-01-16 Production Wells No Violations On the day of my inspection I found that the well head was equipped with a pumping unit. The tank battery consisted of four 100 barrel stock tanks, one 30 barrel poly brine tank, two separators and an earthen dike. Proper identification was posted and I found no leaks or spills. This well shares a tank battery with permits 7116 and 7142.
0311846683 2014-06-06 Preliminary Restoration No Violations On the day of my inspection I found that the well site was only 40% to 50% covered in grass. This site does not pass preliminary restoration at this time.
0339807361 2013-09-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Hall Well Service was on location to tag the plug. John Bernhardt reported that the latch-down plug did no seat properly during the cement job. The was found to be at the correct depth. All of the drilling equipment had been moved off of the site. The pits were still open; the fluid level was down approximately 3 to 5 feet and there were no sags or tears in the pit liners.
0545671556 2013-09-21 Casing String Witnessed No Violations On the day of my inspection I found that Petroset pumped 35 sacks of class A cement down the annulus of the 8.625 and 11.75 casing filling it to surface. The cellar was also filled with cement above the top of the 11.75 casing. After monitoring the situation for 30 minutes the annulus was still full. The cement was not observed retreating down the annulus. PDC Drilling was cleared to connect the blow out preventer, conduct the pressure test and resume drilling.
0613222345 2013-09-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that PDC Drilling had reached a total depth of 3649. They were in the process on tripping out of the hole and preparing to run 4.5 casing. The permit was on display in the dog house, there were no sags or tears in the pit liners and there were no leaks or spills.
0653762790 2013-09-20 Casing String Witnessed No Violations On the day of my inspection I found that PDC Drilling reported loosing circulation at 197. They switched to fluid drilling and drilled an 11 surface hole to 464. Then they ran new 20# 8.625 casing equipped with six centralizers. They mixed three pallets of mud and 13 bags of cotton seed hulls in an unsuccessful attempt to re-establish circulation. Petroset pumped 10 barrels of fresh water, 300 lbs gel, 300 lbs cotton seed hulls, 75 lbs Cell-o-flake, and 75 lbs of paper lost circulation material followed by 250 sacks of class A cement. Circulation was never established. John Bernhardt was advised to let the cement set up for 8 hours and attempt to fill the annulus from the surface.
0861316677 2013-09-25 Drill / Deepen / Reopen No Violations On the day of my inspection PDC Drilling was rigging down and moving off of the location. There were no sags or tears in the pit liners and there were no leaks or spills.
0970128136 2014-01-16 Preliminary Restoration No Violations On the day of my inspection I found that the drill pits had been closed. The site was graded out and ready for seeding. All drilling equipment and debris has been removed from the site. The site still needs erosion control. This site does not pass preliminary restoration at this time.
1628441278 2013-09-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Poulson Drilling was rigged up and spudding the well. The permit was on location. The drilling pits were lined and there were no leaks or spills. Poulson was drilling a 15 conductor hole on fluid.
179518083 2014-1-16 0:00: PW No Violations
1886000017 2013-09-21 Casing String Witnessed No Violations On the day of my inspection Petroset pumped 180 sack s of class A cement down the annulus of the 8.625 and 11.75 casing. The cement never came up to surface. At this point John Bernhardt was instructed to have run a bond log on the hole. Appalachian Well Surveys revealed that the cement top was at approximately 208. The survey showed good cement bond below 208. John Bernhardt was advised to let the cement set for 8 hours and make another attempt at filling from the surface.
339807361 2013-9-27 0:00: DD No Violations
545671556 2013-9-21 0:00: CS No Violations
653762790 2013-9-20 0:00: CS No Violations
861316677 2013-9-25 0:00: DD No Violations
970128136 2014-1-16 0:00: PL No Violations

For data sources see[7]

References