If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27254 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.25,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Jackson Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS UNIT | |
License Status: Producing | |
License Date: 2015-02-20 | |
Spud Date: 2015-03-09 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2015-03-14 | |
Well Total Depth: 3994.00 ft | |
Configuration: Vertical | |
Latitude: 40.250000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-02-20 | Proposed Formations:BEREA THRU CLINTON, Issued Date:2/20/2015, Expired Date:2/19/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-03-14 | |
Completion Report Received | 2016-04-26 | |
Construction Permit Expires | 2017-02-19 | |
Change of Owner | 2018-03-07 | Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2018-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-04-26 | 3834 | 3854 | 61 |
3834 | 3854 | 61 | |
3834 | 3854 | 61 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-04-02 | H2O | 15 | 45328 Gal | 70000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | NGO DEVELOPMENT CORP. | 239.00 | 0.00 | 188 |
2016 | NGO DEVELOPMENT CORP. | 1850.00 | 379.00 | 365 |
2017 | NGO DEVELOPMENT CORP. | 1891.00 | 313.00 | 365 |
2018 | NGO DEVELOPMENT CORP. | 768.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | NGO DEVELOPMENT CORP. | Brine | 1902 | 188 |
2016 | NGO DEVELOPMENT CORP. | Brine | 156 | 365 |
2017 | NGO DEVELOPMENT CORP. | Brine | 41 | 365 |
2018 | NGO DEVELOPMENT CORP. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2025949545 | 2015-3-9 0:00:0 | DD | No Violations | |
-2037165555 | 2015-3-12 0:00: | DD | No Violations | |
-502459263 | 2015-4-29 0:00: | PL | No Violations | |
-620194043 | 2015-7-22 0:00: | PL | No Violations | |
-669570644 | 2015-8-27 0:00: | PL | No Violations | |
-799899646 | 2015-3-9 0:00:0 | CS | No Violations | |
0502459263 | 2015-04-29 | Preliminary Restoration | No Violations | On the day of my inspection I found that NGO had a crew on location working on the preliminary restoration. The well was equipped with tubing and rods. There were five 300 barrel frac tanks on location. I found no leaks or spills. |
0620194043 | 2015-07-22 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well was equipped with a pumping unit that was in operation. The tank battery consisted of three 100 barrel tank, two separators and an earthen dike. The site still needs to be seeded for erosion control. I found no leaks or spills. |
0669570644 | 2015-08-27 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well site and disturbed areas along the lease road had been hydro-seeded. The grass was just starting to come up. |
0799899646 | 2015-03-09 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 5 had drilled a 17.5 conductor hole on fluid to a depth of 69. They ran 62 of new 11.75 casing. Petroset established circulation and cemented the casing to surface with 100 sacks of class A cement. Good circulation was maintained throughout the job with 6 barrels of cement returns. |
0872565851 | 2015-03-11 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 5 had drilled an 11 surface hole on air to a depth of 675. They ran 632 of new 8.625 casing equipped with three centralizers. Petroset established circulation and cemented the casing to surface with 210 sacks of class A cement. Good circulation was maintained throughout the job with 9 barrels of cement returns. |
1186210272 | 2015-03-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling was moving in and rigging up. The pits were not constructed. |
1433773165 | 2015-06-08 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site had been cleared of all drilling equipment and debris. The frac tanks were gone, and the site had been graded. The site still needs grass for erosion control. The wellhead was equipped for a pumping unit. There was a crew on location installing the tank battery. The well was shut in and I found no leaks or spills. |
1563089317 | 2015-03-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 5 was drilling an 11 surface hole on air. They were at a depth of 220. The permit was posted, there were no sags in the pit liner and there were no leaks or spills. |
1810094203 | 2015-10-22 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well site, tank battery site and disturbed area along the access road were all growing with well established short grass. I found no signs of erosion. This site passes preliminary restoration. |
1923435270 | 2015-03-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the pits had been closed. The well was shut in and I found no leaks or spills. |
2025949545 | 2015-03-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 5 was rigged up and ready to spud the well. The pit was dug and lined. The permit was posted in the doghouse. |
2037165555 | 2015-03-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling rig 5 was drilling on air with a 7.875 bit. They were at a depth of 2148. There were no sags in the pit liner and I found no leaks or spills around the drill site. |
2142357645 | 2015-03-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the drilling rig had moved off of the location. The well was shut in. The pit liner was starting to fall in on the mud pit. I contacted Scott Kees. He claimed that they had a crew en route to close the pit. |
872565851 | 2015-3-11 0:00: | CS | No Violations |
For data sources see[9]