X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27261

Well Details

Well ID: 34-031-27261
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Pike Township
Operator Name: DERRICK PETROLEUM INC
Well Pad ID:
Farm/Lease Name: FA MOORE
License Status: Producing
License Date: 2018-05-24
Spud Date: 2018-05-31
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-07-02
Well Total Depth: 3088.00 ft
Configuration: Vertical
Latitude: 40.170000
Longitude: -82.160000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-05-24 Proposed Formations:CLINTON, Issued Date:5/24/2018, Expired Date:5/23/2020 12:00:00 PM, Drilling unit acres:91, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-07-02
Completion Report Received 2018-10-03
Record Last Modified 2018-10-05
Construction Permit Expires 2020-05-23

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-16 ACID 15 70204 Gal 0 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 DERRICK PETROLEUM INC 0.00 350.00 151

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 DERRICK PETROLEUM INC Brine 372 151

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1128758585 2018-10-29 0:00 PL No Violations 0.40
-56349650 2018-7-11 0:00: DD No Violations 0.50
-959354071 2018-7-18 0:00: CT No Violations 0.30
0056349650 2018-07-11 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig was moved out to the next well. The only equipment left at the site was an air compressor and generator. The annular space had been topped off with sack cement. Travis Dugan showed up while I was at the site and he said that he used over half a pallet of cement this morning to top it off. The pit was still open, but the fluid level was low. Travis said that they were going to be closing the pit right away. He also said that they were scheduled to frac the well on Monday morning.
0495992123 2018-08-02 Preliminary Restoration No Violations On the day of my inspection I found that the well has been equipped with a natural gas powered pumping unit. The unit was in operation at the time of my inspection. The drilling pit had been closed and the drill site was rough graded. There were no drilling materials or debris left behind at the well site. There were still frac tanks at the bottom of the access road. No seed or straw had been spread on the site yet. There were no signs of erosion.
0564918910 2018-06-04 Drill / Deepen / Reopen No Violations On the day of my inspection I found that H&D Drilling was drilling the 10 inch diameter surface hole at a depth of 200 feet. Max Donaker reported that they got 31 feet of 10.75 inch diameter conductor casing landed in bedrock. There were no sags or holes in the pit liner and the drilling permit was posted in the rig. There were two centralizers and one casing shoe in the rig for the surface casing. Max said they should be ready to cement the casing by the end of the week.
0959354071 2018-07-18 Completion Testing No Violations On the day of my inspection I found that Phil Moran was finishing up with completing the well. He had the tubing, rods and wellhead installed, and he was starting to rig down and move out.
1015950548 2018-07-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found that no one was working at the site. The drilling rig and most of the associated equipment was still on the site. The well was shut in with a valve. The fluid level was low in the drilling pit and I found no visible hole sin the liner. There were five 300 barrel steel frac tanks staged at the bottom of the hill below the drill site.
1128758585 2018-10-29 Preliminary Restoration No Violations On the day of my inspection I found that the well site half final graded and half rough graded. There was not any grass growing on any of the site. There was good grass coverage around the perimeter of the site. The site was very muddy and there were some pools of standing water, but I found no erosion or run-off. The access road was good condition and easily passable even when wet. The natural gas powered pumping unit was in operation at the time of my inspection. There were no fluid or gas leaks from the wellhead. The well is being produced into a common tank battery on the west side of TR 396. There was no identification posted at the pumping unit or tanks.
1167700111 2018-06-15 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Dwayne Dugan had Jet Wireline Services run a bond log on the surface casing. The log showed the top of the cement to be at 28 feet. There was a new pit liner in the drilling pit. H&D Drilling was rigging up to start drilling on air rotary.
1527620707 2018-05-29 Drill / Deepen / Reopen No Violations Dwayne Dugan called me at 08:00 on 5/29/18 to report that they were moving a rig in today to start this well. The drilling permit was issued on 5/24/18. On the day of my inspection I found that H&D Drilling was moving in and rigging up.
1528297291 2018-06-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that H&D Drilling was drilling at a depth of 300 feet. Max Donaker said that he was still in the Big Injun sand and he had a hole full of water. The other rig hand was picking up the 7 inch diameter casing. There were no sags in the pit liner. The permit was posted on the drilling rig.
1528829822 2018-06-12 Casing String Witnessed No Violations On the day of my inspection I found that H&D Drilling had drilled a 10 inch diameter hole to a depth of 460 feet. They had the 7 inch diameter surface casing ran to a depth of 456 feet. The casing was equipped with a guide shoe and two centralizers. Formation Cementing pumped a gel and cotton seed hull slug and shut in for 30 minutes. There was no circulation when they were pumping. They pumped another gel and cotton seed hull slug and shut in for another 30 minutes. They pumped a third slug, for a total of 1200 pounds of gel and 400 pounds of cotton seed hulls. They shut in for one hour while they waited on more fresh water. Formation pumped 185 sacks of class A cement and displaced it with 19 barrels of water. They landed the wiper plug in the guide shoe and shut down. There was no circulation at any time throughout the job. I told Dwayne Dugan that he must run a bond log on the surface casing cement job. Dwayne agreed and scheduled it for Friday. I also noticed a large rip in the side wall of the pit liner while I was walking around the site. The rip was above the fluid level, but the liner would need to be replaced. I brought the issue up with Dwayne and Travis Dugan and they agreed that they would have to re-line the pit before any more drilling.
1529341125 2018-06-18 Drill / Deepen / Reopen No Violations On the day of my inspection I found that no one from H&D Drilling was present at the drill site. The rig had been equipped for air/rotary drilling and the residue on the pit liner, under the elbow line indicated that they had started drilling out of the surface casing. The new pit liner was in good shape; I found no holes or sags. There were no leaks or spills around the drilling rig. I found an H2S detector mounted in the rig.
1529591733 2018-06-21 Drill / Deepen / Reopen No Violations On the day of m y inspection I found that H&D Drilling was drilling on air, at a depth of 2500 feet. There were no sags or holes in the pit liner, and I found no leaks or spills around the drill site. H&D had an H2S monitor mounted on the rig. Mark Donaker said that they were running two 12 hour shifts and they should be ready to run the casing by Saturday or Monday.
1530022831 2018-06-26 Drill / Deepen / Reopen No Violations On the day of my inspection I found that H&D Drilling was drilling on air at a depth of 2870 feet. The pit liner was starting to fall in on one side. They had it tied up, but the foam on the top of the pit was too thick to actually see where the top of the fluid level was in relation to the top of the sagging pit liner. H&D was pumping water out of the pit into two 300 barrel frac tanks staged at the bottom of the hill. The rate of the centrifugal pump was not enough to keep up with what they were blowing into the pit. I called Travis Dugan to request that he get a water truck out here to pull a load out of the pit. He immediately called back and said that he had a truck on its way within the hour. Dwayne Dugan showed up at the drill site and he also said that they had water trucks on the way. Dwayne gave me the casing pressure test paperwork for the production string. They estimated that they would be ready to cement casing on Thursday. I returned to the drill site two hours later to follow up on the pit. Jeff Breamers water truck was pulling out of the site when I arrived. I found that the fluid level had been drawn down in the pit, and the liner had been pulled back up and secured. Dwayne was still at the site when I arrived. He said that he had water trucks lined up to start hauling out of the 300 barrel frac tanks and they would keep an eye on the pit. They should be drilled to the top of the Clinton sand by the end of the day.
1531142418 2018-06-28 Casing String Witnessed No Violations On the day of my inspection I found that H&D Drilling had drilled the 6.5 inch diameter production hole to a depth of 3022 feet. They had used, tested 4.5 inch diameter casing ran to a depth of 3020 feet. The casing was equipped with 4 centralizers and a guide shoe. Formation Cementing established circulation and pumped 120 sacks of class A cement. Formation landed the wiper plug and pressured up to 500 pounds and held for 5 minutes. Good circulation was maintained throughout the job.
1565964075 2019-8-16 0:00: PL No Violations 0.50
1645220494 2018-05-31 Drill / Deepen / Reopen No Violations On the day of my inspection I found that H&D Drilling was moved in, rigged up and starting to spud the well. The pit was lined and there were two joints of new 10.75 inch diameter conductor casing on site. The permit was posted on the rig. I called Dwayne Dugan to bring it his attention that the drilling permit says a minimum of 60 feet of conductor, cemented to surface. H&D Drilling will be driving the conductor to bedrock and then filling any annular space with sack cement. Dwayne refused to call the permitting section, so I asked to please specify that on future permit applications. I spoke with Mark Donaker to ensure that they were aware that they will need to use the sack cement around the conductor.
1878903638 2018-06-08 Drill / Deepen / Reopen No Violations On the day of my inspection I found that H&D Drilling was drilling at a depth of 320 feet. Max Donaker said they had a crooked hole and they spent the all yesterday straightening it out. They had a string of used, tested 7 inch casing on the racks. Max gave me the testing paperwork from Buckeye. He predicted that they would probably be cementing the casing early next week. There were no sags in the pit liner and there were no leaks or spills around the drill site.
495992123 2018-8-2 0:00:0 PL No Violations 0.30
564918910 2018-6-4 0:00:0 DD No Violations 0.50

For data sources see[8]

References