If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22039 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.46,"lon":-81.46,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: AM-TEK OIL INC | |
Well Pad ID: | |
Farm/Lease Name: CLEVELAND RACQUET CLUB UNIT | |
License Status: Producing | |
License Date: 2008-05-14 | |
Spud Date: 2008-10-09 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-10-15 | |
Well Total Depth: 3808.00 ft | |
Configuration: Vertical | |
Latitude: 41.460000 | |
Longitude: -81.460000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-05-14 | Proposed Formations:ORISKANY/CLINTON, Issued Date:5/14/2008, Expired Date:5/14/2009 6:00:00 AM, Drilling unit acres:23.06, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-10-15 | |
Completion Report Received | 2008-11-07 | |
Correction to Well | 2009-01-23 | UNIT SIZE DECREASED TO 21.46 ACRES. |
Construction Permit Expires | 2009-05-14 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-16 | 3570 | 3633 | 68 |
3570 | 3633 | 68 | |
3570 | 3633 | 68 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 80000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DUCK CREEK ENERGY INC | 3922.00 | 726.00 | 303 |
2010 | DUCK CREEK ENERGY INC | 3264.00 | 538.00 | 365 |
2011 | DUCK CREEK ENERGY INC | 1904.00 | 390.00 | 365 |
2012 | DUCK CREEK ENERGY INC | 1346.00 | 367.00 | 366 |
2013 | DUCK CREEK ENERGY INC | 987.00 | 267.00 | 365 |
2014 | DUCK CREEK ENERGY INC | 363.00 | 282.00 | 365 |
2015 | DUCK CREEK ENERGY INC | 700.00 | 176.00 | 365 |
2016 | DUCK CREEK ENERGY INC | 404.00 | 261.00 | 365 |
2017 | DUCK CREEK ENERGY INC | 681.00 | 170.00 | 365 |
2018 | DUCK CREEK ENERGY INC | 486.00 | 282.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | DUCK CREEK ENERGY INC | Brine | 1421 | 303 |
2010 | DUCK CREEK ENERGY INC | Brine | 671 | 365 |
2011 | DUCK CREEK ENERGY INC | Brine | 492 | 365 |
2012 | DUCK CREEK ENERGY INC | Brine | 295 | 366 |
2013 | DUCK CREEK ENERGY INC | Brine | 280 | 365 |
2014 | DUCK CREEK ENERGY INC | Brine | 80 | 365 |
2015 | DUCK CREEK ENERGY INC | Brine | 70 | 365 |
2016 | DUCK CREEK ENERGY INC | Brine | 48 | 365 |
2017 | DUCK CREEK ENERGY INC | Brine | 65 | 365 |
2018 | DUCK CREEK ENERGY INC | Brine | 95 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-124789318 | 2008-10-14 0:00 | DD | No Violations | |
-1410980505 | 2008-10-11 0:00 | DD | No Violations | |
-1815637370 | 2010-6-3 0:00:0 | PW | No Violations | |
0124789318 | 2008-10-14 | Drill / Deepen / Reopen | No Violations | field check |
0197725000 | 2010-02-02 | Production Wells | No Violations | no violation. |
0210407614 | 2008-10-10 | Drill / Deepen / Reopen | No Violations | cementing cond |
0347241077 | 2010-05-19 | Production Wells | No Violations | Site meeting with OEPA , Company Dave Mansberry and myself to discuss further remedial action. A small amount of oil (2-3 tablespoons) in a puddle at drain tile leading to the storm water inlet.The inlet is east of the tank battery. Company is to dig up tile from storm water inlet to tank battery and remove all contaminated soil and haul away to landfill.
Krit Kohloman EPA said the cleanup work in stream is done. |
0501634965 | 2014-10-15 | UrbanProduction Wells | No Violations | I inspected this producing unit as part of routine inspection activity. The wellhead and tank battery areas are in good condition and free from signs of leakage or problems. The secondary containment is intact and free from fluids. Enclosure gates are locked. The short access road from Chagrin Blvd. is stable and drainage is good. |
1018380484 | 2010-05-04 | Production Wells | No Violations | Company on site cleaning up small stream southeast of well.Company working on the tank battery removing the contaminated soil.OEPA is overseeing the stream cleanup. |
1275496623 | 2010-05-03 | Production Wells | Violations Noted | Responded to complaint of oil in creek (approximately 5-6 bbls ). Arrived on site and Fire Chief Hartman City of Pepper Pike and Kirt Kollar OEPA and Dave Mansberry Company were on site. Dave Mansberry and Kirt Kollar were discussing cleanup procedures for the stream. (Booms, Absorbent pads, and water truck to vacuum up the oil). I advised company to remove contaminated soil around storage tanks and reconstruct dike. |
1275571385 | 2010-05-05 | Production Wells | No Violations | Phone call from Dave Mansberry advising me cleanup progressing in stream under OEPA guidance is going well.The contaminated soil at tank battery was hauled away. |
1382445446 | 2013-10-22 | UrbanPreliminary Restoration | No Violations | The producing unit consists of a pump jack unit and above-ground storage tank (AST) battery. The battery is comprised of 1 100-barrel steel production tank and 1 50-barrel brine tank, and separator unit. The wellhead and battery are both enclosed in separate board-on-board fences. The load-outs are bull-plugged. The ID and secondary containment are good. The unit is fitted with carbon canister, low-pressure relief valve, and spark arrestor. Gates are locked. Lease road is in good condition and areas impacted by drilling have been restored. No problems noted and passes preliminary restoration. |
1410980505 | 2008-10-11 | Drill / Deepen / Reopen | No Violations | surface |
1525793364 | 2018-05-08 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following: the well was in production with active chart record. The wellhead and battery enclosures were secure and locked. Fittings and connections were secure. Load-lines were locked. The storage tanks were in good condition with no evidence of leakage or problems. The enclosure gates were locked. I walked the areas surrounding the well and battery and found no signs of impact to the existing greenscape. Production reports were current. |
1815637370 | 2010-06-03 | Production Wells | No Violations | Inspected site Violations corrected.
Case closed. |
197725000 | 2010-2-2 0:00:0 | PW | No Violations | |
2058570661 | 2017-04-24 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following: the areas around the wellhead and battery were free from any signs of problems. The access to the wellhead and battery, which are shared with the recreation facility, were in good condition. The wellhead and battery enclosures were secure and locked. Fittings and connections were secure. Load-lines were locked. The storage tanks were in good condition with no evidence of leakage or problems. The enclosure gates were locked. |
210407614 | 2008-10-10 0:00 | DD | No Violations | |
2106717579 | 2009-10-28 | Preliminary Restoration | No Violations | No violation. |
347241077 | 2010-5-19 0:00: | PW | No Violations | |
501634965 | 2014-10-15 0:00 | UP | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1275496623 | US-OH-107639 | 2010-06-02 | Well operation causing pollution and contamination | |
1275496623 | US-OH-107640 | 2010-06-03 | Well insufficiently equipped to prevent escape of oil and gas | |
1275496623 | US-OH-107641 | 2010-06-03 | Dike or pit not able to prevent escape of brine or other wastes |
For data sources see[9]