If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22070 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.46,"lon":-81.5,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: BASS ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: SIGNATURE SQUARE UNIT | |
License Status: Producing | |
License Date: 2008-09-23 | |
Spud Date: 2008-12-17 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-12-29 | |
Well Total Depth: 3842.00 ft | |
Configuration: Vertical | |
Latitude: 41.460000 | |
Longitude: -81.500000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-09-23 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:9/23/2008, Expired Date:9/23/2009 6:00:00 AM, Drilling unit acres:22.85, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-12-29 | |
Completion Report Received | 2009-06-15 | |
Construction Permit Expires | 2009-09-23 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-08-18 | 3630 | 3656 | 53 |
3630 | 3656 | 53 | |
3630 | 3656 | 53 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 60331 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | BASS ENERGY CO INC | 6732.00 | 247.00 | 231 |
2010 | BASS ENERGY CO INC | 9505.00 | 380.00 | 365 |
2011 | BASS ENERGY CO INC | 6136.00 | 140.00 | 0 |
2012 | BASS ENERGY CO INC | 4184.00 | 117.00 | 366 |
2013 | BASS ENERGY CO INC | 3283.00 | 56.00 | 365 |
2014 | BASS ENERGY CO INC | 2776.00 | 70.00 | 365 |
2015 | BASS ENERGY CO INC | 3358.00 | 96.00 | 365 |
2016 | BASS ENERGY CO INC | 2132.00 | 36.00 | 365 |
2017 | BASS ENERGY CO INC | 1760.00 | 55.00 | 365 |
2018 | BASS ENERGY CO INC | 1573.00 | 101.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | BASS ENERGY CO INC | Brine | 345 | 231 |
2010 | BASS ENERGY CO INC | Brine | 677 | 365 |
2011 | BASS ENERGY CO INC | Brine | 243 | |
2012 | BASS ENERGY CO INC | Brine | 135 | 366 |
2013 | BASS ENERGY CO INC | Brine | 143 | 365 |
2014 | BASS ENERGY CO INC | Brine | 35 | 365 |
2015 | BASS ENERGY CO INC | Brine | 61 | 365 |
2016 | BASS ENERGY CO INC | Brine | 100 | 365 |
2017 | BASS ENERGY CO INC | Brine | 118 | 365 |
2018 | BASS ENERGY CO INC | Brine | 105 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1168953287 | 2010-8-3 0:00:0 | PW | No Violations | |
-1211445347 | 2018-1-8 0:00:0 | UP | No Violations | 0.50 |
-154732139 | 2010-8-31 0:00: | PW | No Violations | |
-1872657366 | 2008-12-15 0:00 | DD | No Violations | |
-2091334937 | 2009-1-5 0:00:0 | DD | No Violations | |
0012597556 | 2017-08-31 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The wellhead plunger-lift unit and associated tank battery are located in the shared-use, asphalt-paved parking and drive area of a multi-tenant office building. At the time of this inspection, I observed the following: the well and tank battery board-on-board enclosures were locked and secure. Fittings and connections were secure and free from signs of leakage or problems. The secondary containment was intact. I walked the areas surrounding the well and battery and found the natural hardscape and greenery to be free from signs of impact. |
0103082493 | 2013-02-19 | Preliminary Restoration | No Violations | The wellhead consists of a mechanical plunger lift unit in a 8-foot fenced enclosure. A pressure gauge at the production tubing indicates 200 pounds per square inch (PSI). The 8 5/8-inch casing does not indicate any pressure at the gauge. The associated tank battery consists of 1 100-barrel (BBL) tank, 1 50 BBL tank, and a mechanical separator, also in a separate, locked enclosure.. The spacing is in accordance with the rule. The tank battery dike is adequate. Safety gear in place as required by 1501:9-9-05. |
0154732139 | 2010-08-31 | Production Wells | No Violations | |
0287200608 | 2009-01-23 | Drill / Deepen / Reopen | No Violations | company working on grading site |
1027305064 | 2008-12-16 | Drill / Deepen / Reopen | No Violations | surface casing |
103082493 | 2013-2-19 0:00: | PL | No Violations | |
1168953287 | 2010-08-03 | Production Wells | No Violations | No violation |
1211445347 | 2018-01-08 | UrbanProduction Wells | No Violations | I inspected this well location as part of routine inspection activity. The well and battery are located behind a multi-tenant professional building, with mixed-used commercial use beyond. At the time of this inspection I noted the following: a well with plunger-lift system and associated tank battery is separate board-on-board enclosures which were locked and secure. The load-line valves were plugged, locked and secure. The secondary containment was intact. The production reports were current. The well was producing with an active chart record. I walked and inspected the areas surrounding the well and battery and found no indications of problems. |
12597556 | 2017-8-31 0:00: | UP | No Violations | 0.50 |
1276187633 | 2010-03-30 | Preliminary Restoration | No Violations | |
1403199160 | 2014-06-19 | UrbanProduction Wells | No Violations | I inspected this producing unit as part of routine inspection activity. Production reports are current. I did not observe any signs or evidence of leakage, spill , or problems at either the production wellhead or tank battery system. The secondary containment at the battery is in good condition. The process safety equipment is present. Load lines are bull-plugged and locked. Landscaping around the unit elements is in good condtion. Gates are intact and locked. Signage is present, accurate, and readable. No problems or violtaions noted at this time. |
1751030486 | 2008-12-18 | Drill / Deepen / Reopen | No Violations | surface cementing |
1791198213 | 2013-10-01 | UrbanProduction Wells | No Violations | The producing unit consists of a wellhead with mechanical plunger lift and above-ground storage tank (AST) battery with 1 100-barrel production tank, and 1 50-barrel brine tank, separator and metering run. The secondary containment and spacing are good. No problems noted. |
1872657366 | 2008-12-15 | Drill / Deepen / Reopen | No Violations | rig moving on |
2091334937 | 2009-01-05 | Drill / Deepen / Reopen | No Violations | service rig on site swabbing well NO VIOLATION |
287200608 | 2009-1-23 0:00: | DD | No Violations |
For data sources see[9]