If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22135 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.33,"lon":-81.66,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: PINE | |
License Status: Producing | |
License Date: 2010-09-15 | |
Spud Date: 2010-09-20 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-09-28 | |
Well Total Depth: 3826.00 ft | |
Configuration: Directional | |
Latitude: 41.330000 | |
Longitude: -81.660000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-10-19 | Proposed Formations:OHIO SHALE--CLINTON, Issued Date:10/19/2009, Expired Date:10/19/2010 6:00:00 AM, Drilling unit acres:21.8322, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2010-09-15 | Proposed Formations:OHIO SHALE-CLINTON, Issued Date:9/15/2010, Expired Date:9/14/2012 12:00:00 PM, Drilling unit acres:27.2607, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-09-28 | |
Completion Report Received | 2011-02-14 | |
Correction to Well | 2011-02-25 | CHANGE IN TARGET INFORMATION FROM "AS DRILLED SURVEY". FOOTAGE--1241'NL & 1323'EL OF LOT 14. TARGET X= 2, 230, 526 AND TARGET Y= 609,022. |
Construction Permit Expires | 2011-09-15 | |
Correction to Well | 2011-09-30 | UNIT SIZE DECREASED TO 25.142 ACRES. |
Change of Owner | 2018-04-13 | Operator changed from 1249, CUTTER OIL CO to 2456, OHIO VALLEY ENERGY SYSTEM CORP |
Record Last Modified | 2018-04-13 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-05-17 | 3552 | 3558 | 13 |
2011-05-17 | 3562 | 3582 | 61 |
3552 | 3558 | 13 | |
3562 | 3582 | 61 | |
3552 | 3558 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-09-28 | N2 | 0 | 236000 Mscf | 0 | ||
2010-09-28 | H2O | 15 | 95000 Gal | 50000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER OIL COMPANY | 0.00 | 1139.00 | 71 |
2011 | CUTTER OIL COMPANY | 9425.00 | 7945.00 | 365 |
2012 | CUTTER OIL COMPANY | 18544.00 | 6589.00 | 366 |
2013 | CUTTER OIL COMPANY | 28997.00 | 5366.00 | 365 |
2014 | CUTTER OIL COMPANY | 13353.00 | 2465.00 | 365 |
2015 | CUTTER OIL COMPANY | 6348.00 | 1552.00 | 365 |
2016 | CUTTER OIL COMPANY | 4535.00 | 1179.00 | 365 |
2017 | CUTTER OIL COMPANY | 3761.00 | 958.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 2248.00 | 417.00 | 232 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | CUTTER OIL COMPANY | Brine | 1753 | 71 |
2011 | CUTTER OIL COMPANY | Brine | 138 | 365 |
2012 | CUTTER OIL COMPANY | Brine | 123 | 366 |
2013 | CUTTER OIL COMPANY | Brine | 158 | 365 |
2014 | CUTTER OIL COMPANY | Brine | 55 | 365 |
2015 | CUTTER OIL COMPANY | Brine | 127 | 365 |
2016 | CUTTER OIL COMPANY | Brine | 101 | 365 |
2017 | CUTTER OIL COMPANY | Brine | 69 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 55 | 232 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1436874731 | 2018-3-22 0:00: | UP | No Violations | |
-1603267621 | 2010-9-28 0:00: | UD | No Violations | |
-2012676635 | 2011-8-2 0:00:0 | UL | No Violations | 0.50 |
-716554368 | 2010-9-28 0:00: | UD | No Violations | |
-832019492 | 2010-9-21 0:00: | UD | No Violations | |
-985394737 | 2017-8-4 0:00:0 | UP | No Violations | 0.50 |
0392377637 | 2010-09-27 | Urban Drill / Deepen / Reopen | No Violations | drilling at 3200 on fluid. |
0716554368 | 2010-09-28 | Urban Drill / Deepen / Reopen | No Violations | Cementing 4.5 casing. |
0832019492 | 2010-09-21 | Urban Drill / Deepen / Reopen | No Violations | cementing surface casing not witnessed because Required Training (Ethic).
Bop test witnessed. |
0985394737 | 2017-08-04 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The well and associated battery are located behind the house at the referenced address, and accessed via a shared use drive. At the time of this inspection, fittings and connections at the wellhead and battery were secure and free from signs of leakage or problems. The load-lines were plugged, locked, and secure. Secondary containment was intact and secure. The individual enclosures were locked and secure. The access road was well drained with no signs of wash-outs or erosional deficits. ID signage was present. |
1288273703 | 2010-09-20 | Drill / Deepen / Reopen | No Violations | Conductor cementing. |
1436874731 | 2018-03-22 | UrbanProduction Wells | No Violations | I inspected this well location as part of routine inspection activity. The well and battery are co-located on a parcel occupied by the Ohio Valley Energy Well #2-2096 (Kleppel) . At the time of my inspection, I found the following: wellhead with pump jack system and associated battery in separate board-on-board enclosures. The enclosure gates were locked and secure. The fittings and connections at the wellhead and battery were secure and free from problems. The well was idle pending transfer, but with current production reporting. The interior of the battery, including secondary containment was free from free oil, staining, or other indications of spills, leaks, or problems. The electrical panels and load line valves were locked and secure. I walked and inspected the areas surrounding the well and battery and found no indications of impacts or problems relating to the on-going production activity. |
1482502141 | 2014-07-16 | UrbanProduction Wells | No Violations | I inspected this producing unit as part of routine inspection activity. The well was completed in 09/28/2010. The unti is producing and production reports are current. Elements of the well consist of a production wellhead with standard valve assembly and pump jack system. The wellhead is located in a closed and locked board-on-board enclosure. The 8.625-inch casing is accessible as required. There are no signs of leakage or problems at the wellhead. The aboveground storage tank battery is located south of the well, along the access road. The battery is comprised of a total of 2 steel 140-barrel production tanks, 50-barrel poly brine tank, and horizontal separator. Spacing from well to battery, and spacing of elements within the battery meet regulations. The battery is located in a separate board-on-board enclosure which is gated and locked. The load-outs are bull-plugged and locked. There is process safety equipment in use (carbon filter, low-pressure relief valve, and spark arrestor). The secondary containment at the battery appears well maintained. I did not observe any signs or evidence of leakage, spills, or problems. There is ID signage at the battery and wellhead which are legible and in good condition. |
1603267621 | 2010-09-28 | Urban Drill / Deepen / Reopen | No Violations | Total depth reacked crew rigging up to trip drilling pipe out to run 4.5 casing. To cement late afternoon. |
2012676635 | 2011-08-02 | UrbanPreliminary Restoration | No Violations | Urban Preliminary Restoration due. Preliminary restoration passed. |
392377637 | 2010-9-27 0:00: | UD | No Violations |
For data sources see[9]