Well ID: 34-035-22203 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.33,"lon":-81.67,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: GLATZER | |
License Status: Producing | |
License Date: 2012-09-26 | |
Spud Date: 2013-06-06 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2013-06-13 | |
Well Total Depth: 4062.00 ft | |
Configuration: Directional | |
Latitude: 41.330000 | |
Longitude: -81.670000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-26 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:9/26/2012, Expired Date:9/26/2014 12:00:00 PM, Drilling unit acres:21.54, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-06-13 | |
Correction to Well | 2013-07-26 | CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2013-09-26 | |
Completion Report Received | 2013-10-15 | |
Record Last Modified | 2018-02-21 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 681.00 | 385.00 | 74 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 5454.00 | 2774.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 3390.00 | 818.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 2133.00 | 643.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 1559.00 | 308.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 1103.00 | 192.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 145 | 74 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 1163 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 535 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 215 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 127 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1164902907 | 2013-6-13 0:00: | DD | No Violations | |
-1401964428 | 2013-6-6 0:00:0 | DD | No Violations | |
-2007260059 | 2013-6-7 0:00:0 | DD | No Violations | |
-2109796705 | 2013-6-5 0:00:0 | DD | No Violations | |
-289678049 | 2013-6-10 0:00: | DD | No Violations | |
0289678049 | 2013-06-10 | Drill / Deepen / Reopen | No Violations | Drilling is in progress, drilling on air and soaping. Plan as permitted calls for changing over to fluid drilling prior to the top of the Newburg. |
0772711362 | 2013-06-12 | Drill / Deepen / Reopen | No Violations | Drilling is continuing at 3,560. The level of fluid in the primary recalculating pit is very close to the top, with little freeboard. I called Tom Wood to discuss, and he indicates hell notify John Howell. No other issues or problems noted. |
1164902907 | 2013-06-13 | Drill / Deepen / Reopen | No Violations | Crews have run the 4.5-inch production casing and conditioned the hole before cementing. Universal will be performing cementing of the production casing. Circulation before cementing was good with no loss of fluid. Cementing proceeded with no lose of circulation. Plug latch down and held. No issues noted. |
1337162267 | 2014-09-22 | UrbanProduction Wells | No Violations | I inspected the location of this producing unit pursuant to a complaint be the landowner regarding some preliminary restoration issues. Specifically, the landowner is concerned about the former drilling pit area where grass seed has not germinated and also about some screening tress which have died. I also observed oil leaking from the stuffing box at the wellhead. I have relayed these observations to Ohio Valley Energy and they have indicated that crews will be tending to the problems this week. |
1369752895 | 2013-05-28 | UrbanProduction Wells | No Violations | Met with Ted Hill of Ohio Valley Energy at planned location for this unit. The existing Glatzer 1 unit is in the same area behind the residence. The planned lease road will follow the existing driveway to the back and then continue another 200 feet. Tree and bruch removal will begin today or tomorrow. The Wildcat rif which is currently drilling at the Elmwood 1 (2-2205) in Independence will modilize to this location within the next 2 weeks. We discussed the need for runoff controls on the down-slope side of the unit. |
1370259004 | 2013-05-30 | UrbanProduction Wells | No Violations | Site building crews are continuing to clear the area for drilling. We discussed a slight alteration of the location of the pits to accomdate and slightly different rig orientation. The pits will be moved slightly north and west. I discussed adding some additional berming next to the drainageway which traverses the western edge, and grading the site to drain to the south. |
1381412075 | 2013-10-10 | Preliminary Restoration | No Violations | Preliminary restoration has been completed. The wellhead pump jack is enclosed in a 8 board-on-board enclosure. The aboveground storage tank (AST) battery, which is shared with the Glatzer 1D unit, has been expanded to include a total of 2 100-barrel steel production tanks, 2 25-barrel poly brine tanks, 2 separators and a metering run. The battery is enclosed in an 8 board-on-board fence. The gates are locked. Spacing, unit ID signage, and secondary containment are good. Areas disturbed during drilling, including pits, have been filled, re-graded and seeded. The short access road to the wellhead has been graveled. Process safety equipment (spark arrestor, low-pressure relief valve, and carbon filter element) is present. No problems observed. |
1401964428 | 2013-06-06 | Drill / Deepen / Reopen | No Violations | Conductor has been landed in competent bedrock and is being cemented in place by Petroset. I talk to John Howell from Wildcat about making sure the cellar is made liquid-tight as required. |
1945547415 | 2014-02-26 | UrbanProduction Wells | No Violations | The unit is producing and no problems or violations noted. |
2007260059 | 2013-06-07 | Drill / Deepen / Reopen | No Violations | Surface casing is being cemented in place. The cellar has been lined and is holding fluid. Pits are in good condition and have ample freeboard. |
2109796705 | 2013-06-05 | Drill / Deepen / Reopen | No Violations | Wildcat rig is moving onto location today. The pits are under construction. Mud pumps and kill water frac tank is being situated. |
772711362 | 2013-6-12 0:00: | DD | No Violations |