If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-21182 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82,"lon":-82.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Fairfield | |
Municipality: Walnut Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: KANDEL L & S COMM #2 | |
License Status: Final Restoration | |
License Date: 2013-10-04 | |
Spud Date: 1996-07-08 | |
Spud Drilling Contractor: WARREN DRLG | |
Final Drill Date: 1996-07-13 | |
Well Total Depth: 4252.00 ft | |
Configuration: Vertical | |
Latitude: 39.820000 | |
Longitude: -82.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-02-12 | 182 BELDEN & BLAKE CO GeoDate 2/12/96 |
Oil and Gas | 1996-02-12 | Issued Date 2/12/96 Expired Date 2/11/97 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON/CPRG Proposed Depth 04252 Proposed Drill Depth 04252 |
Original Spud | 1996-07-08 | |
Completed | 1996-07-13 | |
Reached Total Depth | 1996-07-13 | |
Completion Report Received | 1996-08-13 | |
Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC |
APP | 2013-10-04 | Proposed Formations:ROSE RUN, Issued Date:10/4/2013, Expired Date:10/4/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-04-17 | |
Construction Permit Expires | 2015-10-04 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4066 | 0 | |
4066 | 0 | ||
2006-09-11 | 4068 | 4088 | 80 |
4068 | 4088 | 80 | |
4066 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 1000 Gal | 0 | ACIDIZED W/1000 GAL |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1997 | BELDEN & BLAKE CORPORATION | 136662.00 | 291.00 | 275 |
1998 | BELDEN & BLAKE CORPORATION | 153685.00 | 33.00 | 348 |
1999 | BELDEN & BLAKE CORPORATION | 88562.00 | 0.00 | 352 |
2000 | BELDEN & BLAKE CORPORATION | 32452.00 | 0.00 | 343 |
2001 | BELDEN & BLAKE CORPORATION | 14339.00 | 0.00 | 358 |
2002 | BELDEN & BLAKE CORPORATION | 7579.00 | 0.00 | 362 |
2003 | BELDEN & BLAKE CORPORATION | 4000.00 | 0.00 | 358 |
2004 | BELDEN & BLAKE CORPORATION | 7011.00 | 52.00 | 354 |
2005 | BELDEN & BLAKE CORPORATION | 4352.00 | 0.00 | 364 |
2006 | BELDEN & BLAKE CORPORATION | 3308.00 | 0.00 | 364 |
2007 | ENERVEST OPERATING LLC | 2235.00 | 0.00 | 365 |
2008 | ENERVEST OPERATING LLC | 2533.00 | 0.00 | 365 |
2009 | ENERVEST OPERATING LLC | 2382.00 | 0.00 | 365 |
2010 | ENERVEST OPERATING LLC | 1038.00 | 0.00 | 365 |
2011 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 0 |
2012 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 0 |
2013 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 365 |
2014 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 0 |
2015 | ENERVEST OPERATING LLC | 0.00 | 0.00 | 294 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1997 | BELDEN & BLAKE CORPORATION | Brine | 40 | 275 |
1998 | BELDEN & BLAKE CORPORATION | Brine | 0 | 348 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 0 | 352 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 0 | 343 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 0 | 358 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 31 | 362 |
2003 | BELDEN & BLAKE CORPORATION | Brine | 0 | 358 |
2004 | BELDEN & BLAKE CORPORATION | Brine | 1 | 354 |
2005 | BELDEN & BLAKE CORPORATION | Brine | 0 | 364 |
2006 | BELDEN & BLAKE CORPORATION | Brine | 0 | 364 |
2007 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2008 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2009 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2010 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2011 | ENERVEST OPERATING LLC | Brine | 0 | |
2012 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2013 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2015 | ENERVEST OPERATING LLC | Brine | 0 | 294 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-935093027 | 2013-3-28 0:00: | PW | No Violations | 0.50 |
0569115371 | 2014-04-15 | Plug / Plug Back | No Violations | Chipco is plugging for company and they pulled tubing and ran 1.5tubing in to depth of 4074. They set plug at 4074-3674. They ran 30 sacks of class A cement. |
0835346777 | 2008-08-04 | Production Wells | No Violations | This well and well 1181 are both in production and using the same tank battery that is contained in an earthen dike. There are also two separators being used and they are also contained within an earthen dike. There is proper display of identification. No violations noted this date. |
0935093027 | 2013-03-28 | Production Wells | No Violations | Production well inspection, this well consists of a well head and 2-210 barrel tanks. This is a common tank battery, 3404521181 also produces into this tank battery. No violations were noted. |
1397740321 | 2014-04-17 | Plug / Plug Back | No Violations | Accompanied Inspector Kip Thompson to witness the last gel spacer and cementing of the Big Lime plug. Chipco ran 25 bbl of bentonite gel ahead and 9.3 bbl gel behind 60 sacks of class A cement for the Big Lime plug. The plug and the gel spacer were then displaced using 11 bbl of heavy brine. The bottom of surface plug and top plug (60 sacks each) will be set this afternoon. |
1397743251 | 2014-04-16 | Plug / Plug Back | No Violations | Chipco on site, 4.5 production casing was ripped at 3029. One joint pulled to set rip plug. Clinton plug was set using gel spacers. The remainder of the plugs will be set on 04/17/14. |
1462457772 | 2016-05-05 | Final Restoration | No Violations | The purpose of this inspection is a status check on a final restoration. During my inspection I witnessed that the well location has been restored. The production equipment is still on location and is in use by well #21181. Two 210 bbl. tanks, one 50 bbl., tank, and one horizontal separator were once shared between #21182 and #21181. Location has met 1509.072 B requirements and final restoration has passed. |
1824666072 | 2014-04-17 | Plug / Plug Back | No Violations | Chipco on site, lime plug set using gel spacers. Bottom of surface and surface plugs set. Plugs circulated. |
569115371 | 2014-4-15 0:00: | PB | No Violations | 4.50 |
835346777 | 2008-8-4 0:00:0 | PW | No Violations |
For data sources see[9]