If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-21286 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7,"lon":-82.5,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Fairfield | |
Municipality: Berne Township | |
Operator Name: GEOPETRO LLC | |
Well Pad ID: | |
Farm/Lease Name: NORTH BERNE UNIT | |
License Status: Final Restoration | |
License Date: 2001-07-10 | |
Spud Date: 2002-04-21 | |
Spud Drilling Contractor: PINNACLE DRILLING | |
Final Drill Date: 2002-05-03 | |
Well Total Depth: 4350.00 ft | |
Configuration: Directional | |
Latitude: 39.700000 | |
Longitude: -82.500000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2001-07-10 | Proposed Formations:KNOX, Issued Date:7/10/2001, Expired Date:7/10/2002 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-04-21 | |
Completed | 2002-05-03 | |
Reached Total Depth | 2002-05-03 | |
Construction Permit Expires | 2002-07-10 | |
Completion Report Received | 2002-08-13 | |
Correction to Well | 2002-08-30 | CORRECTION TO SURFACE INFORMATION: 526'SL & 1374'WL OF SEC. 1 (N); X=1.999,975; Y= 621,428. CORRECTION TO TARGET INFORMATION: 521'SL & 1784'WL OF SEC. 1(N); X= 2,000,385; Y= 621,423. LANCASTER QUAD, AS DRILLED SURVEY. |
Plugged/Abandoned | 2003-04-03 | |
Record Last Modified | 2016-04-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2002-09-18 | 4187 | 4201 | 56 |
2002-09-18 | 4223 | 4228 | 10 |
4168 | 4171 | 12 | |
4187 | 4201 | 56 | |
4223 | 4228 | 10 | |
4258 | 4268 | 24 | |
4168 | 4171 | 12 | |
2002-09-18 | 4258 | 4268 | 24 |
2002-09-18 | 4168 | 4171 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 1500 Gal | 0 | BOTTOM PERFS SQUEEZED OFF |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | GEOPETRO LLC | 1206.00 | 1813.00 | 169 |
2003 | GEOPETRO LLC | 1816.00 | 2051.00 | 365 |
2004 | GEOPETRO LLC | 627.00 | 1520.00 | 365 |
2005 | GEOPETRO LLC | 718.00 | 1209.00 | 365 |
2006 | GEOPETRO LLC | 537.00 | 676.00 | 365 |
2007 | GEOPETRO LLC | 638.00 | 735.00 | 365 |
2008 | GEOPETRO LLC | 892.00 | 755.00 | 365 |
2009 | GEOPETRO LLC | 1090.00 | 331.00 | 365 |
2010 | DEVORE ANTHONY D | 879.00 | 507.00 | 365 |
2011 | GEOPETRO LLC | 554.00 | 169.00 | 0 |
2012 | GEOPETRO LLC | 783.00 | 314.00 | 366 |
2013 | GEOPETRO LLC | 707.00 | 342.00 | 365 |
2014 | GEOPETRO LLC | 361.00 | 317.00 | 365 |
2015 | GEOPETRO LLC | 36.00 | 0.00 | 30 |
2016 | GEOPETRO LLC | 0.00 | 0.00 | 0 |
2017 | GEOPETRO LLC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | GEOPETRO LLC | Brine | 200 | 169 |
2003 | GEOPETRO LLC | Brine | 780 | 365 |
2004 | GEOPETRO LLC | Brine | 875 | 365 |
2005 | GEOPETRO LLC | Brine | 1295 | 365 |
2006 | GEOPETRO LLC | Brine | 1260 | 365 |
2007 | GEOPETRO LLC | Brine | 940 | 365 |
2008 | GEOPETRO LLC | Brine | 915 | 365 |
2009 | GEOPETRO LLC | Brine | 1190 | 365 |
2010 | DEVORE ANTHONY D | Brine | 925 | 365 |
2011 | GEOPETRO LLC | Brine | 615 | |
2012 | GEOPETRO LLC | Brine | 1076 | 366 |
2013 | GEOPETRO LLC | Brine | 845 | 365 |
2014 | GEOPETRO LLC | Brine | 920 | 365 |
2015 | GEOPETRO LLC | Brine | 280 | 30 |
2016 | GEOPETRO LLC | Brine | 0 | 0 |
2017 | GEOPETRO LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1249798358 | 2004-9-10 0:00: | PL | No Violations | |
0040774102 | 2002-05-24 | Production Wells | No Violations | Inspection revealed drilling pits are full but are not in violation at this time. I called Paul Archer and left a message that he might have a foot or two of fluids pumped out of the pits in case it might rain enough to cause the pits to run over. No violations noted this date. WEATHER CONDIRIONS: Mostly sunny and 61 degrees. |
1010918795 | 2014-06-23 | Final Restoration | No Violations | There is no evidence of production equipment left behind. The site has met 1509.072B restoration requirements. |
1031321656 | 2002-09-06 | Preliminary Restoration | No Violations | Inspection for preliminary restoration revealed the location is ruff graded and volunteer vegetation has come up. OWNER needs to grade, seed, and mulch the location before the remedial date. Owner then needs to notify this inspector when the work is done. A follow-up restoration date will be set and conducted. WEATHER CONDITIONS: Sunny and 75 degrees. Lat/Lon Update done this date. |
1035376271 | 2002-10-23 | Preliminary Restoration | Violations Noted | Follow-up conducted at the request of Brent Thompson (Well tender.) so he has information needed to meet requirements. We look at the site and I made my recommendations on what needs to be done. Mr. Thompson will call me and advise me on what actions will be taken to stabilize the soil over the winter and spring seasons, and if the location is to be farm next spring. He will have a dozer on site ASAP to grade the area. |
1049805027 | 2003-04-08 | Preliminary Restoration | No Violations | Follow-up revealed location meets requirements. WEATHER CONDITIONS: 39 DEGREES. |
1210i35530 | 2001-07-19 | Drill / Deepen / Reopen | No Violations | New well. No location made yet. Will be directional drill well. |
1210i3553025 | 2001-7-19 0:00: | DD | No Violations | |
1249798358 | 2004-09-10 | Preliminary Restoration | Violations Noted | Meets requirements. |
1359865275 | 2015-08-07 | Production Wells | No Violations | Last report incorrectly states that the well has been plugged. That is false the well is producing. |
1855213720 | 2012-01-18 | Preliminary Restoration | No Violations | Site visit for PR. |
40774102 | 2002-5-24 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1035376271 | US-OH-100020 | 2002-10-23 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) | |
1249798358 | US-OH-106687 | 2002-10-23 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]