If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-045-21499 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.92,"lon":-82.71,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Fairfield | |
| Municipality: Violet Township | |
| Operator Name: PIPES PURSIE E | |
| Well Pad ID: | |
| Farm/Lease Name: VIOLET MEADOWS | |
| License Status: Final Restoration | |
| License Date: 2014-07-18 | |
| Spud Date: 2014-09-16 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2014-09-25 | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 39.920000 | |
| Longitude: -82.710000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-07-18 | Proposed Formations:TREMPEALEAU, Issued Date:7/18/2014, Expired Date:7/17/2016 12:00:00 PM, Drilling unit acres:22.1, Proposed Well Type:OG, Proposed Well Class:POOL |
| Plugged/Abandoned | 2014-09-25 | |
| Reached Total Depth | 2014-09-25 | |
| Construction Permit Expires | 2015-07-18 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | PIPES PURSIE E | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | PIPES PURSIE E | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1831977040 | 2014-9-18 0:00: | DD | No Violations | 6.00 |
| -1876516913 | 2014-9-16 0:00: | DD | No Violations | 2.00 |
| -507054495 | 2014-9-25 0:00: | DD | No Violations | 2.00 |
| -687462382 | 2016-4-20 0:00: | FR | No Violations | 1.00 |
| -890027376 | 2014-9-23 0:00: | DD | No Violations | 33.00 |
| 0507054495 | 2014-09-25 | Drill / Deepen / Reopen | No Violations | PEP Drilling has reached total depth, the well is a dry hole. The well will be plugged using drill pipe. |
| 0687462382 | 2016-04-20 | Final Restoration | No Violations | Final restoration inspection. The site has all production equipment removed. The site has good vegetative cover. |
| 0890027376 | 2014-09-23 | Drill / Deepen / Reopen | No Violations | PEP Drilling has switched to drilling on fluid as they are 100 from the formation. They have added starch to the drilling mud to help them maintain circulation. No violations noted. |
| 1086364953 | 2016-05-05 | Final Restoration | No Violations | The purpose of this inspection is a status check on a final restoration. This well was a plugged with the drilling rig due to a dry hole. During my inspection I witnessed the site was restored. Location has met 1509.072 B requirements. |
| 1407171870 | 2014-08-04 | Drill / Deepen / Reopen | No Violations | Site work is being done. Access road has been widened and the silt fence has been installed. |
| 1411689449 | 2014-09-25 | Plug / Plug Back | No Violations | PEP Driliing called me at 0330 hours to inform me this well would be plugged. Universal Well Service on site at 1800 hours. All plugs circulated, |
| 1692984981 | 2014-09-17 | Drill / Deepen / Reopen | No Violations | PEP Drilling has reached 133 by 0800 hours. They anticipate running surface casing sometime today. |
| 1831977040 | 2014-09-18 | Drill / Deepen / Reopen | No Violations | Universal Well Service on site at 1300 hours.431of 11.75 surface casing ran using 255 sacks of class A cement. Good cement returns. |
| 1849886276 | 2014-09-22 | Drill / Deepen / Reopen | No Violations | PEP Drilling has reached 3884 by 1430 hours. They should reach total depth by 09/23/14 AM. They are switching from air to fluid next kelly to protect against a natural gas blow out. No violations noted. |
| 1876516913 | 2014-09-16 | Drill / Deepen / Reopen | No Violations | PEP Drilling has rigged up and will spud sometimes today. I met with PEP drilling supervisor Allen, we discussed the casing program and location of the pits. |
For data sources see[7]