If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-045-21504 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-82.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Fairfield | |
Municipality: Liberty Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: HOCKENBERRY UNIT | |
License Status: Producing | |
License Date: 2018-09-18 | |
Spud Date: 2018-10-29 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2018-11-07 | |
Well Total Depth: 3736.00 ft | |
Configuration: Vertical | |
Latitude: 39.900000 | |
Longitude: -82.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-09-18 | Proposed Formations:KNOX, Issued Date:9/18/2018, Expired Date:9/17/2020 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2018-11-07 | |
Completion Report Received | 2019-01-29 | |
Record Last Modified | 2019-02-08 | |
Construction Permit Expires | 2020-09-17 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-09-14 | ACID | 0 | 2567 Bbl | 0 | SEE RECORD IN IMAGES |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ARTEX OIL COMPANY | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ARTEX OIL COMPANY | Brine | 2100 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1224807946 | 2019-2-22 0:00: | PW | No Violations | 0.50 |
-1240199829 | 2018-10-30 0:00 | PB | No Violations | 2.10 |
-1447204343 | 2019-1-10 0:00: | PL | No Violations | 0.30 |
-1526995271 | 2018-12-4 0:00: | PL | No Violations | 0.30 |
-1817558578 | 2019-1-17 0:00: | PW | No Violations | 1.70 |
-1929068682 | 2018-10-31 0:00 | DD | No Violations | 2.30 |
-204509562 | 2019-11-8 0:00: | PW | No Violations | 0.50 |
0272248099 | 2018-11-21 | Drill / Deepen / Reopen | No Violations | My inspection revealed Kilbarger Construction has began to solidify the air pit and the fluid pit. There was no work being performed at the time of my inspection. |
0979655782 | 2018-10-29 | Drill / Deepen / Reopen | No Violations | My inspection today revealed Kilbarger rig number 5 has the air pit completed and the mud pit was being filled during my inspection. The 80 foot blow line still needs to be constructed. They anticipate starting to drill by 12:00 pm this day. There is a power broom on site to remove any mud from the public roads. |
1183733288 | 2018-11-07 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 5 has rigged down and is preparing to move to permit number 3404521506. Kilbarger Construction has begun to prepare the location for 3404521506. Kibarger Drilling plans on spudding on 11.11.18. |
1224807946 | 2019-02-22 | Production Wells | No Violations | My inspection revealed this well is in operation and is in compliance. The final grading is the only think left to be performed. Artex Oil is waiting on the soil to become dry enough to finish the grading. |
1240199829 | 2018-10-30 | Plug / Plug Back | No Violations | Kilbarger rig number 5 set 373 feet of 9.62 inch diameter conductor casing. Formation Cementing ran 275 sacks of class A cement with 850 pounds of accelerator and 150 pounds of lost circulation material. Cement was observed coming back to surface. |
1447204343 | 2019-01-10 | Preliminary Restoration | No Violations | My inspection revealed the pits have been filled and all drilling equipment and supplies have been removed. This well is in production selling natural gas. |
1526995271 | 2018-12-04 | Preliminary Restoration | No Violations | My inspection revealed the pits have been filled. There are two water tanks that remain on site preventing the passing of preliminary restoration. |
1540996810 | 2018-10-31 | Drill / Deepen / Reopen | No Violations | I received notification at 0130 hours this day that Formation Cementing would be on site to cement the surface casing. Kilbarger rig number 5 drilled to 648 feet. They ran 4 joints of 7 inch diameter casing and encountered a tight spot. They attempted to run the casing deeper without success. They tripped out the 7 inch diameter casing and tripped in the drill string with a bit to ream the hole. I requested to be informed when they finish running the 7 inch diameter casing so I can witness the surface casing cementing. |
1541429556 | 2018-11-05 | Drill / Deepen / Reopen | No Violations | My inspection revealed Kilbarger rig number 5 has reached 3570 feet. They are drilling on fluid at this time. The mud loggers are on site monitoring the samples as they are drilling into the formation today. I met with the landowner, Mr. Hockenberry whos house is next to the drilling rig. Mr. Hockenberry had no complaints with the drilling operation. |
1543945299 | 2018-12-04 | Completion Testing | No Violations | My inspection reveled the well has been completed and the preliminary restoration has not been completed. Heavy rain fall has prevented Artex Oil Company from completing the preliminary restoration. The well is evaluated to see if the owners of the well will put the well into production. |
1614118480 | 2019-03-07 | Production Wells | No Violations | My inspection revealed Artex Oil Company has placed a pumping unit on this well. The well had flowed crude oil from the reservoir rock pressure prior to them installing a pumping unit. Legible identification. |
1817558578 | 2019-01-17 | Production Wells | No Violations | I received a call from Mr. Greg Burgett regarding a complaint of a smell coming from this well. I met with Artex at the well and found out the well is now making oil and the oil is off gassing and is being released from the tanks. Artex has routed the oil through a heater treater to try and remove any gas from the well. I informed Artex if this did not take care of the smell, further actions would be need to correct the problem. I told Mr. Burgett I would be in contact with him regarding this matter. I asked Mr. Burgett if wanted to register his complaint in the divisions complaint database and he said not at this time. |
1929068682 | 2018-10-31 | Drill / Deepen / Reopen | No Violations | Kilbarger drilling set 593 feet of 7 inch diameter casing. Formation Cementing ran 110 sacks of class A cement to bring the cement back to surface. I witnessed the cement coming back to surface. They will drill out the cement shoe in approximately 8 hours. |
272248099 | 2018-11-21 0:00 | DD | No Violations | 0.20 |
979655782 | 2018-10-29 0:00 | DD | No Violations | 0.80 |
For data sources see[8]