If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-20150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-81.04,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Parkman Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: ZAYLOR E & S | |
License Status: Final Restoration | |
License Date: 2013-10-11 | |
Spud Date: 1975-11-17 | |
Spud Drilling Contractor: | |
Final Drill Date: 1977-09-08 | |
Well Total Depth: 4240.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -81.040000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1975-11-17 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
Completed | 1977-09-08 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
Reached Total Depth | 1977-09-08 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
CO | 1982-07-22 | 9 EDC GeoDate 7/22/82 |
Change of Owner | 2008-07-21 | Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
APP | 2013-10-11 | Proposed Formations:CLINTON, Issued Date:10/11/2013, Expired Date:10/11/2015 12:00:00 PM, Drilling unit acres:146, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-09-10 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
Construction Permit Expires | 2015-10-11 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
Record Last Modified | 2017-02-10 | REV. LOC. 2-5-75, RE-IS. 7-16-75 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4110 | 4196 | 21 |
4110 | 4196 | 21 | |
4110 | 4196 | 21 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 1250 Bbl | 47200 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1068559653 | 2013-9-9 0:00:0 | PW | No Violations | |
-1195911313 | 2014-9-10 0:00: | PB | No Violations | |
-1765262019 | 2014-8-14 0:00: | PW | No Violations | |
-1916980025 | 2013-4-4 0:00:0 | PW | No Violations | |
0399559545 | 2014-10-08 | Final Restoration | No Violations | My inspection found the location has been graded and vegetation is established. Final restoration can be passed when a flow line waiver is submitted. |
1068559653 | 2013-09-09 | Production Wells | Violations Noted | My inspection found the well to be equipped with a plunger lift unit. The tank battery consists of a 100 BBL production tank and a mechanical separator. The dike does not meet requirements and there was no identification sign on location. The production records show no production since 2009. The lease road is in stable condition. The well must be produced within 30 days or plugged within 90 days of this notice. |
1195911313 | 2014-09-10 | Plug / Plug Back | No Violations | I was on location for the plugging of this oil and gas well. Kleese Development & Assoc. was the plugging contractor on location for Enervest. Petroset was the cement contractor on location. KDA removed the 1.5 tubing from the well. Petroset rigged up and bull headed the bottom plug with 15 sacks of Class A cement. The plug was displaced and pressured up to 400 psi and shut in for 1 hour. Appalacian Well Survey shot the 2 7/8 casing off at 2700. KDA pulled 1 joint of 2 7/8 casing to 2670. Petroset rigged up and set 75 sacks of Class A cement to cover the big lime. When KDA pulled 12 joints of 2 7/8 casing the well began to unload itself. I had Petroset circulate on the well with heavy brine to remove any pockets of gas left in the formations. The company circulated and stopped to observe the well multiple times until it was decided the well no longer had any gas pressure on it. KDA had Petroset rig up and set another plug at 2300 to 2100, with 57 sacks of Class A cement. KDA pulled 62 joints of the 2 7/8 casing to 464. Petroset rigged up and pumped 60 sacks of Class A cement to cover the bottom of the surface casing. KDA pulled 9 joints of 2 7/8 casing to 200. Petroset rigged up and pumped 60 sacks of Class A cement to the surface. The remaining 5 joints of 2 7/8 casing was removed from the well. The hole was then topped off with cement. A total of 77 joints of 2 7/8 casing was removed from the well. GPS Coordinates are +/-8. |
1391195230 | 2014-01-27 | Production Wells | Violations Noted | This inspection is a follow up to compliance notice inspection # 1068559653. My inspection found the well to be equipped with a plunger lift unit. The tank battery consists of a 100 BBL production tank and a mechanical separator. The dike does not meet requirements and there was no identification sign on location. The production records show no production since 2009. The lease road is in stable condition. I will contact the company about the identification sign and the dike must be rebuilt if the well gets put back into production. The company has been issued a plugging permit for the well. I have contacted the company and the well is scheduled to be plugged. |
1765262019 | 2014-08-14 | Production Wells | No Violations | My inspection found no changes since my last inspection. The company has the well scheduled to be plugged this year. |
1916980025 | 2013-04-04 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The tank battery consists of a 100 BBL production tank and a mechanical separator. The tank battery is in need of a dike and there was not a identification sign. The production records show no production since 2009. I contacted a supervisor from Enervest, Mr McDaniels, who stated he was going to find out more about the well and contact me later in the week. The lease road is in stable condition. |
1927175372 | 2015-10-06 | Final Restoration | No Violations | My inspection found the location has been graded and vegetation is established on the location. The landowner waiver has been submitted for the flow line. Final restoration can be passed. |
399559545 | 2014-10-8 0:00: | FR | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1068559653 | US-OH-101416 | 2014-11-06 | Well shall be plugged | |
1391195230 | US-OH-111562 | 2016-07-26 | NONE | Well shall be plugged |
For data sources see[9]