If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-20473 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Burton Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: D KAUFMAN ETAL | |
License Status: Final Restoration | |
License Date: 2014-01-02 | |
Spud Date: 1983-06-04 | |
Spud Drilling Contractor: SHERMAN DRLG | |
Final Drill Date: 1983-06-08 | |
Well Total Depth: 4095.00 ft | |
Configuration: Vertical | |
Latitude: 41.500000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-03-23 | 213 LOMAK OPERATING CO GeoDate 3/23/83 |
Oil and Gas | 1983-03-23 | Issued Date 3/23/83 Expired Date 9/19/83 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1983-04-22 | 213 LOMAK OPERATING CO GeoDate 4/22/83 |
Oil and Gas | 1983-04-22 | Issued Date 3/23/83 Expired Date 9/19/83 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04095 Proposed Drill Depth 04095 |
Original Spud | 1983-06-04 | R.L. 4-23-83 |
Completed | 1983-06-08 | R.L. 4-23-83 |
Reached Total Depth | 1983-06-08 | R.L. 4-23-83 |
Completion Report Received | 1983-06-23 | R.L. 4-23-83 |
Change of Owner | 2000-06-27 | Operator changed from 213, RANGE OPERATING COMPANY to 6674, GREAT LAKES ENERGY PTNSHP LLC |
Change of Owner | 2010-04-08 | Operator changed from 6674, RANGE RESOURCES-APPALACHIA LLC to 7578, ENERVEST OPERATING LLC |
APP | 2014-01-02 | Proposed Formations:CLINTON, Issued Date:1/2/2014, Expired Date:1/2/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-07-22 | R.L. 4-23-83 |
Construction Permit Expires | 2016-01-02 | R.L. 4-23-83 |
Record Last Modified | 2017-02-15 | R.L. 4-23-83 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3912 | 4005 | 2 |
3912 | 4005 | 2 | |
3912 | 4005 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 60000 Gal | 50000 | FRAC;60MG H2O,50M# SD |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0252321401 | 2014-07-22 | Plug / Plug Back | No Violations | I was on location on 7/22/2014 to witness the plugging of this oil and gas well. Nicks Well Plugging is the contractor doing the plug job for Enervest. Nicks rigged up, and set the Clinton plug through the 4.5 casing with 30 sacks of cement and 50 pounds of cottonseed hulls. The plug was displaced and the well pressured up to 1200 psi and was shut-in for one hour. Nicks proceeded to rip the casing at 2730. Nicks then pulled 4 joints of 4.5 casing to 2550. Nicks rigged up, broke circulation, and pumped 86 sacks of Class A cement to cover the top of the Big Lime. Nicks pulled 49 joints of 4.5 casing to 518. Nicks rigged up, broke circulation, and pumped 60 sacks of Class A cement to cover the bottom of the surface casing. Nicks pulled 8 joints of 4.5 casing to 200. Nicks rigged up, broke circulation and ran 62 sacks of Class A Cement to the top of the hole. Cement was circulated to the surface. The remaining 5 joints of 4.5 casing was removed from the well and the hole was topped off with cement. A total of 66 joints of 4.5, 10.5lb casing was recovered during the job. GPS coordinates are +/- 8. |
0298970960 | 2013-11-12 | Production Wells | Violations Noted | My inspection found the well to be equipped with a concoil wellhead. The valves on the wellhead are shut. The flow line from the well leading into the separator has been disconnected. The valves on the separator are closed. The two house meters coming off of the separator are shut in. The tank battery consists of a 210 BBL production tank and a mechanical separator. Production records show the last year of reported production was 2008. The tank battery has the proper identification on it. The lease road is in stable condition. I will contact Mr. McDaniel, a supervisor for Enervest about the well. The well shall be placed back into production in 90 days. If the well is not producible a plugging permit shall be obtained within 90 days and the well shall be plugged within 180 days of this compliance action. |
1271128917 | 2014-10-06 | Final Restoration | No Violations | My inspection found the 210 BBL production tank remains on location. Once the tank is removed the tank battery can be graded, seeded, and strawed. Once vegetation is established and the flow line waiver is submitted I will pass final restoration. I contacted Kyle Ahbel from Enervest about finishing the restoration. |
1291829009 | 2010-12-03 | Production Wells | No Violations | bValves at the well going to the separator are closed. Valves at the separator are closed. Well is not in production. No production reported last year. Identification sign needs posted. Site was snow covered. Dike appeared to be in good repair. No leaks noted. One 210Bbl on location and a mechanical separator. Well is a concoil well. |
1450879272 | 2015-12-22 | Final Restoration | No Violations | My inspection found the tank battery and the lease road have been removed. The location has been graded and vegetation is established. The farmer is currently using the field for hay. Final restoration can be passed. |
252321401 | 2014-7-22 0:00: | PB | No Violations | |
298970960 | 2013-11-12 0:00 | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0298970960 | US-OH-123107 | 2014-09-04 | Well shall be plugged |
For data sources see[9]