X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-21462

Well Details

Well ID: 34-055-21462
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Burton Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: KENT STATE UNIVERSITY
License Status: Producing
License Date: 1987-05-26
Spud Date: 1987-07-13
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1987-07-17
Well Total Depth: 4189.00 ft
Configuration: Vertical
Latitude: 41.480000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1987-05-26 Issued Date 5/26/87 Expired Date 5/25/88 Acres 0000000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04189 Proposed Drill Depth 04189
Original Spud 1987-07-13
Completed 1987-07-17
Reached Total Depth 1987-07-17
Completion Report Received 1987-08-10
CO 1987-08-17 84 EVERFLOW EASTERN PTNS L P GeoDate 5/26/87
Construction Permit Expires 1988-05-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2005-06-08 3996 4104 0
2006-09-11 4024 4086 38
3996 4104 0
4024 4086 38
3996 4104 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC W/100M GAL H20 & 60M# SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 0
1988 EVERFLOW EASTERN PARTNERS LP 17618.00 453.00 365
1989 EVERFLOW EASTERN PARTNERS LP 9709.00 182.00 365
1991 EVERFLOW EASTERN PARTNERS LP 6117.00 100.00 365
1992 EVERFLOW EASTERN PARTNERS LP 4988.00 35.00 365
1993 EVERFLOW EASTERN PARTNERS LP 3560.00 86.00 365
1994 EVERFLOW EASTERN PARTNERS LP 4913.00 88.00 365
1995 EVERFLOW EASTERN PARTNERS LP 3502.00 75.00 365
1996 EVERFLOW EASTERN PARTNERS LP 3231.00 64.00 365
1997 EVERFLOW EASTERN PARTNERS LP 2782.00 5.00 365
1998 EVERFLOW EASTERN PARTNERS LP 3079.00 58.00 365
1999 EVERFLOW EASTERN PARTNERS LP 2958.00 57.00 365
2000 EVERFLOW EASTERN PARTNERS LP 1987.00 25.00 365
2001 EVERFLOW EASTERN PARTNERS LP 3002.00 22.00 365
2002 EVERFLOW EASTERN PARTNERS LP 2003.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 3442.00 17.00 365
2004 EVERFLOW EASTERN PARTNERS LP 1962.00 42.00 365
2005 EVERFLOW EASTERN PARTNERS LP 1408.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 1203.00 46.00 365
2007 EVERFLOW EASTERN PARTNERS LP 1598.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 1385.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 1372.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 760.00 48.00 365
2011 EVERFLOW EASTERN PARTNERS LP 1347.00 22.00 365
2012 EVERFLOW EASTERN PARTNERS LP 1497.00 70.00 336
2013 EVERFLOW EASTERN PARTNERS LP 2081.00 57.00 305
2014 EVERFLOW EASTERN PARTNERS LP 1607.00 55.00 365
2015 EVERFLOW EASTERN PARTNERS LP 1731.00 144.00 365
2016 EVERFLOW EASTERN PARTNERS LP 1697.00 123.00 365
2017 EVERFLOW EASTERN PARTNERS LP 2058.00 20.00 365
2018 EVERFLOW EASTERN PARTNERS LP 2325.00 64.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP Brine 0 0
1988 EVERFLOW EASTERN PARTNERS LP Brine 793 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 142 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 236 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 147 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 42 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 111 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 23 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 37 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 82 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 36 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 37 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 41 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 41 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 39 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 46 336
2013 EVERFLOW EASTERN PARTNERS LP Brine 179 305
2014 EVERFLOW EASTERN PARTNERS LP Brine 246 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 142 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 88 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 81 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1269896440 2015-7-21 0:00: PW No Violations
-1512306518 2014-4-24 0:00: PW No Violations
0000018847 Preliminary Restoration No Violations PASSED Y WITNESSED 11/7/89 INSPECTOR DATE 11/0719/89 DATA FROM OLD VAX INFO
1269896440 2015-07-21 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is open to a pop off valve that is plumbed into the flow line. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1461.
1512306518 2014-04-24 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is closed. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1461.
18847 PL No Violations

For data sources see[9]

References