If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21686 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.53,"lon":-81.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Chester Township | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: COOPER UNIT | |
License Status: Producing | |
License Date: 1991-06-10 | |
Spud Date: 1991-06-14 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1991-06-22 | |
Well Total Depth: 3883.00 ft | |
Configuration: Vertical | |
Latitude: 41.530000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1991-04-16 | 2026 SUMMIT PETROLEUM INC GeoDate 4/16/91 |
Oil and Gas | 1991-04-16 | Issued Date 4/16/91 Expired Date 4/15/92 Acres 0020248 Tool Type RTF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1991-06-10 | 2026 SUMMIT PETROLEUM INC GeoDate 6/10/91 |
Oil and Gas | 1991-06-10 | Issued Date 4/16/91 Expired Date 4/15/92 Acres 0021610 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03883 Proposed Drill Depth 03883 |
Original Spud | 1991-06-14 | RL 6-15-91 |
Completed | 1991-06-22 | RL 6-15-91 |
Reached Total Depth | 1991-06-22 | RL 6-15-91 |
Completion Report Received | 1991-07-18 | RL 6-15-91 |
Construction Permit Expires | 1992-04-15 | RL 6-15-91 |
Record Last Modified | 2017-02-15 | RL 6-15-91 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3677 | 3760 | 0 |
3677 | 3760 | 0 | |
2006-09-11 | 3703 | 3731 | 25 |
3703 | 3731 | 25 | |
3677 | 3760 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 81000 Gal | 40000 | FRAC W/81M GAL H20 AND 400 SX SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | SPENCER RESOURCES INC | 593.00 | 0.00 | 77 |
1992 | SUMMIT PETROLEUM INC | 12644.00 | 130.00 | 365 |
1993 | SUMMIT PETROLEUM INC | 31060.00 | 354.00 | 365 |
1994 | SUMMIT PETROLEUM INC | 19705.00 | 198.00 | 365 |
1995 | SUMMIT PETROLEUM INC | 10798.00 | 154.00 | 365 |
1996 | SUMMIT PETROLEUM INC | 9667.00 | 49.00 | 365 |
1997 | SUMMIT PETROLEUM INC | 7213.00 | 117.00 | 365 |
1998 | SUMMIT PETROLEUM INC | 5452.00 | 58.00 | 365 |
1999 | SUMMIT PETROLEUM INC | 6406.00 | 0.00 | 360 |
2000 | SUMMIT PETROLEUM INC | 5935.00 | 105.00 | 365 |
2001 | SUMMIT PETROLEUM INC | 6209.00 | 0.00 | 365 |
2002 | SUMMIT PETROLEUM INC | 4249.00 | 42.00 | 365 |
2003 | SUMMIT PETROLEUM INC | 5425.00 | 47.00 | 365 |
2004 | SUMMIT PETROLEUM INC | 1566.00 | 47.00 | 365 |
2005 | SUMMIT PETROLEUM INC | 2606.00 | 47.00 | 365 |
2006 | SUMMIT PETROLEUM INC | 3402.00 | 42.00 | 365 |
2007 | SUMMIT PETROLEUM INC | 2743.00 | 29.00 | 365 |
2008 | SUMMIT PETROLEUM INC | 5335.00 | 29.00 | 365 |
2009 | SUMMIT PETROLEUM INC | 3685.00 | 35.00 | 365 |
2010 | SUMMIT PETROLEUM INC | 3246.00 | 29.00 | 365 |
2011 | SUMMIT PETROLEUM INC | 3611.00 | 0.00 | 365 |
2012 | SUMMIT PETROLEUM INC | 3152.00 | 0.00 | 366 |
2013 | SUMMIT PETROLEUM INC | 2516.00 | 46.00 | 365 |
2014 | SUMMIT PETROLEUM INC | 2911.00 | 31.00 | 365 |
2015 | SUMMIT PETROLEUM INC | 1680.00 | 0.00 | 365 |
2016 | SUMMIT PETROLEUM INC | 1860.00 | 0.00 | 365 |
2017 | SUMMIT PETROLEUM INC | 1728.00 | 0.00 | 365 |
2018 | SUMMIT PETROLEUM INC | 1442.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | SPENCER RESOURCES INC | Brine | 0 | 77 |
1992 | SUMMIT PETROLEUM INC | Brine | 80 | 365 |
1993 | SUMMIT PETROLEUM INC | Brine | 365 | 365 |
1994 | SUMMIT PETROLEUM INC | Brine | 134 | 365 |
1995 | SUMMIT PETROLEUM INC | Brine | 131 | 365 |
1996 | SUMMIT PETROLEUM INC | Brine | 50 | 365 |
1997 | SUMMIT PETROLEUM INC | Brine | 105 | 365 |
1998 | SUMMIT PETROLEUM INC | Brine | 55 | 365 |
1999 | SUMMIT PETROLEUM INC | Brine | 30 | 360 |
2000 | SUMMIT PETROLEUM INC | Brine | 72 | 365 |
2001 | SUMMIT PETROLEUM INC | Brine | 813 | 365 |
2002 | SUMMIT PETROLEUM INC | Brine | 10 | 365 |
2003 | SUMMIT PETROLEUM INC | Brine | 128 | 365 |
2004 | SUMMIT PETROLEUM INC | Brine | 37 | 365 |
2005 | SUMMIT PETROLEUM INC | Brine | 69 | 365 |
2006 | SUMMIT PETROLEUM INC | Brine | 20 | 365 |
2007 | SUMMIT PETROLEUM INC | Brine | 34 | 365 |
2008 | SUMMIT PETROLEUM INC | Brine | 48 | 365 |
2009 | SUMMIT PETROLEUM INC | Brine | 32 | 365 |
2010 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2011 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2012 | SUMMIT PETROLEUM INC | Brine | 54 | 366 |
2013 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 29 | 365 |
2015 | SUMMIT PETROLEUM INC | Brine | 59 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-337110542 | 2018-7-3 0:00:0 | UP | No Violations | |
-814692657 | 2013-6-11 0:00: | UP | No Violations | |
0337110542 | 2018-07-03 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the gate valve on the tubing was open. The production records for this well were current. The tank battery consisted of one 100 BBL production tank and a mechanical separator. The mechanical separator valves were open and the chart showed production. The tank battery was diked and the proper, legible signage. The lease access was stable. No violations observed. |
0814692657 | 2013-06-11 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1256306382 | 2009-10-21 | Production Wells | No Violations | Tank battery dike has a trench cut into it approximately 2 feet wide, to allow for drainage. Took pictures of site and sent e-mail with pictures to Summit requesting dike to be repaired. Called Bill Kinney left message requesting dike to be repaired. Lease road was stable. |
1565492998 | 2010-03-17 | Production Wells | No Violations | Dike has been repaired. Drain pipe has been installed in the dike. At the time of inspection cap was off of the drain pipe. Replaced cap at the time of inspection. Tubing at the well head is approximately 50% pipe is rusting, compression ring on the well head is approximately 50% rusted through. |
2018550290 | 2010-04-09 | Production Wells | No Violations | Caps are in place on the drain pipe in the tank battery dike. |
2072947862 | 2016-11-28 | UrbanProduction Wells | No Violations | I conducted an inspection on this well. The well is equipped with a plunger lift assembly and the valves on the wellhead were open. The last reported production for this well was submitted in 2014. The tank battery consisted of one 100 BBL production well and a mechanical separator. The mechanical separator valves were open and the chart showed production. The tank battery was diked and the proper, legible signage was located at the tank battery. The tank valves were plugged. The lease access was stable. |
For data sources see[9]