If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21689 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.53,"lon":-81.29,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Munson Township | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: OSTROWSKI UNIT | |
License Status: Producing | |
License Date: 1991-04-30 | |
Spud Date: 1991-09-16 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1991-09-20 | |
Well Total Depth: 3752.00 ft | |
Configuration: Vertical | |
Latitude: 41.530000 | |
Longitude: -81.290000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1991-04-30 | 18 MUTUAL OIL & GAS CO GeoDate 4/30/91 |
Oil and Gas | 1991-04-30 | Issued Date 4/30/91 Expired Date 4/29/92 Acres 0029510 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03752 Proposed Drill Depth 03752 |
Original Spud | 1991-09-16 | |
Completed | 1991-09-20 | |
Reached Total Depth | 1991-09-20 | |
CO | 1991-09-26 | 2037 CEDAR VALLEY ENERGY INC GeoDate 4/30/91 |
Completion Report Received | 1991-10-15 | |
Construction Permit Expires | 1992-04-29 | |
Change of Owner | 2016-12-29 | Operator changed from 2037, CEDAR VALLEY ENERGY INC to 8738, J WELL SERVICE INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3558 | 3637 | 0 |
3558 | 3637 | 0 | |
2006-09-11 | 3593 | 3636 | 23 |
3593 | 3636 | 23 | |
3558 | 3637 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 60550 Gal | 40000 | FRAC W/60,550 GAL WATER AND 400 SX |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CEDAR VALLEY ENERGY INC | 0.00 | 0.00 | 0 |
1992 | CEDAR VALLEY ENERGY INC | 21422.00 | 1076.00 | 308 |
1993 | CEDAR VALLEY ENERGY INC | 31513.00 | 1058.00 | 365 |
1994 | CEDAR VALLEY ENERGY INC | 21053.00 | 559.00 | 365 |
1995 | CEDAR VALLEY ENERGY INC | 13884.00 | 414.00 | 365 |
1996 | CEDAR VALLEY ENERGY INC | 7553.00 | 351.00 | 365 |
1997 | CEDAR VALLEY ENERGY INC | 7543.00 | 210.00 | 365 |
1998 | CEDAR VALLEY ENERGY INC | 6941.00 | 204.00 | 365 |
1999 | CEDAR VALLEY ENERGY INC | 6149.00 | 139.00 | 365 |
2000 | CEDAR VALLEY ENERGY INC | 5064.00 | 191.00 | 365 |
2001 | CEDAR VALLEY ENERGY INC | 3993.00 | 121.00 | 365 |
2002 | CEDAR VALLEY ENERGY INC | 5298.00 | 119.00 | 365 |
2003 | CEDAR VALLEY ENERGY INC | 3624.00 | 58.00 | 365 |
2004 | CEDAR VALLEY ENERGY INC | 2552.00 | 60.00 | 365 |
2005 | CEDAR VALLEY ENERGY INC | 2101.00 | 140.00 | 365 |
2006 | CEDAR VALLEY ENERGY INC | 2414.00 | 0.00 | 365 |
2007 | CEDAR VALLEY ENERGY INC | 1742.00 | 70.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 1298.00 | 60.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 1141.00 | 80.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 1301.00 | 68.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 989.00 | 59.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 1337.00 | 69.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 1989.00 | 62.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 1983.00 | 103.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1186.00 | 54.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 1019.00 | 63.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 551.00 | 0.00 | 0 |
2018 | J WELL SERVICE INC | 751.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1154958138 | 2017-8-11 0:00: | UP | No Violations | |
-728676927 | 2017-5-8 0:00:0 | UP | No Violations | |
0728676927 | 2017-05-08 | UrbanProduction Wells | No Violations | During this inspection, the well was observed to be equipped with a plunger lift assembly and the valves on the wellhead were open. Production records for this well were current. The tank battery consisted of one 100 BBL production tank, one 50 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart dated 5/1/17 showed production. The valve on the brine tank was dripping fluid. The tank battery was diked and access to the well site was stable. The signage located at the tank battery needed to be updated to include the new owner information. I contacted Jim Adams from J Well Service, Inc. about the leaking tank valve and updating the signage. |
1071196497 | 2018-08-20 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was observed to be equipped with a plunger lift assembly and the gate valve on the tubing and flow line valve were open. Production records for this well were current. The tank battery consisted of one 100 BBL production tank, one 50 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart showed production. The diked tank battery had legible signage, and the lease access was stable. |
1154958138 | 2017-08-11 | UrbanProduction Wells | No Violations | During this inspection, the leaking tank valve on the 50 BBL poly brine tank has been repaired, and signage has been updated to reflect new owner information as requested, since the last inspection dated 5/8/2017. No violations observed. |
1370954798 | 2013-06-11 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery and the wellhead. The lease road is in stable condition. |
For data sources see[9]