If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-055-21792 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.46,"lon":-81.02,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Geauga | |
| Municipality: Middlefield Township | |
| Operator Name: DAVID R HILL INC | |
| Well Pad ID: | |
| Farm/Lease Name: MILLER MOSE UNIT | |
| License Status: Producing | |
| License Date: 2004-05-04 | |
| Spud Date: 2004-07-04 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2004-07-08 | |
| Well Total Depth: 4160.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.460000 | |
| Longitude: -81.020000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2004-05-04 | Proposed Formations:CLINTON, Issued Date:5/4/2004, Expired Date:5/4/2005 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Correction to Well | 2004-06-18 | CORRECTION TO FOOTAGE : SHOULD BE 720'SL & 2050'EL OF LOT 24. |
| Original Spud | 2004-07-04 | RBDMS Rec |
| Completed | 2004-07-08 | RBDMS Rec |
| Reached Total Depth | 2004-07-08 | RBDMS Rec |
| Completion Report Received | 2004-11-05 | RBDMS Rec |
| Construction Permit Expires | 2005-05-04 | RBDMS Rec |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2004-12-15 | 3947 | 4016 | 61 |
| 3947 | 4016 | 61 | |
| 3947 | 4016 | 61 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2000 Bbl | 40000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2004 | DAVID R HILL INC | 300.00 | 80.00 | 133 |
| 2005 | DAVID R HILL INC | 5539.00 | 628.00 | 365 |
| 2006 | DAVID R HILL INC | 4146.00 | 302.00 | 365 |
| 2007 | DAVID R HILL INC | 2436.00 | 290.00 | 365 |
| 2008 | DAVID R HILL INC | 2433.00 | 178.00 | 365 |
| 2009 | DAVID R HILL INC | 2226.00 | 204.00 | 365 |
| 2010 | DAVID R HILL INC | 1941.00 | 186.00 | 365 |
| 2011 | DAVID R HILL INC | 1538.00 | 100.00 | 365 |
| 2012 | DAVID R HILL INC | 1330.00 | 108.00 | 366 |
| 2013 | DAVID R HILL INC | 1249.00 | 120.00 | 365 |
| 2014 | DAVID R HILL INC | 339.00 | 35.00 | 365 |
| 2015 | DAVID R HILL INC | 101.00 | 83.00 | 365 |
| 2016 | DAVID R HILL INC | 1509.00 | 79.00 | 365 |
| 2017 | DAVID R HILL INC | 72.00 | 0.00 | 365 |
| 2018 | DAVID R HILL INC | 562.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2004 | DAVID R HILL INC | Brine | 144 | 133 |
| 2005 | DAVID R HILL INC | Brine | 252 | 365 |
| 2006 | DAVID R HILL INC | Brine | 116 | 365 |
| 2007 | DAVID R HILL INC | Brine | 148 | 365 |
| 2008 | DAVID R HILL INC | Brine | 100 | 365 |
| 2009 | DAVID R HILL INC | Brine | 141 | 365 |
| 2010 | DAVID R HILL INC | Brine | 70 | 365 |
| 2011 | DAVID R HILL INC | Brine | 88 | 365 |
| 2012 | DAVID R HILL INC | Brine | 43 | 366 |
| 2013 | DAVID R HILL INC | Brine | 53 | 365 |
| 2014 | DAVID R HILL INC | Brine | 40 | 365 |
| 2015 | DAVID R HILL INC | Brine | 72 | 365 |
| 2016 | DAVID R HILL INC | Brine | 0 | 365 |
| 2017 | DAVID R HILL INC | Brine | 0 | 365 |
| 2018 | DAVID R HILL INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1136368793 | 2015-4-6 0:00:0 | PW | No Violations | |
| -47005016 | 2008-12-3 0:00: | PW | No Violations | |
| -976768831 | 2009-3-24 0:00: | PL | No Violations | |
| 0047005016 | 2008-12-03 | Production Wells | Violations Noted | Well is a rabbit well. Tank battery dike is in good repair. Two 100BBL tank in battery. There is 3 feet between the two tanks. There 6 2 between the production tank and the mechanical separator. Called Don Craiger requested that the tank either be moved or the separator be spaced correctly. Verbal NOV given please fix in 30days. Called Gary the pumper for David Hill, both tanks are production tanks. Spacing needs corrected between the separator and the production tank. Space at this time is 6 feet, safety rules call for 10 feet. |
| 0976768831 | 2009-03-24 | Preliminary Restoration | No Violations | Spacing between the separator and the tanks has not been corrected. |
| 1136368793 | 2015-04-06 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well and the tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The 100 BBL brine tank is showing signs of leaking from the heater port at the base of the tank. The proper identification is located on the tank battery. The lease road is in stable condition. I left a message for Mr. Hill of David R. Hill Inc. about having the tank removed or repaired. |
| 1442182856 | 2018-02-06 | Production Wells | No Violations | During this inspection, the well was observed to be equipped with a plunger lift assembly and the annulus and flow line valves were open. The well was fenced. Production records for this well were current. The tank battery consisted of one 100 BBL production tank, one 100 BBL brine tank and a mechanical separator. Valves on the separator were open. The tank battery was diked with legible signage. The lease access was stable. No violations observed. |
| 1831735109 | 2009-12-07 | Production Wells | No Violations | Separator spacing has not been corrected. Ive spoken to Don Craiger from Hill David R Inc regarding the spacing of the separator and the tank, Don stated that they are using that tank for brine, not production. Ive had two additional newer wells in Geauga County with spacing issues, from different companies. Companies where both given warnings and allowed to produce by supervisor. Same courtesy will be given to this company, once. There was oil staining on the ground below the tank valve to the tank that is a Brine tank. Thief hatches where secured. Tank battery dike is in good repair. Identification sign is correct. |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0047005016 | US-OH-125092 | 2008-12-03 | Violation of tank spacing requirements |
For data sources see[9]