34-055-21846

Well Details

Well ID: 34-055-21846
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Chester Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: VLAH UNIT
License Status: Producing
License Date: 2005-08-03
Spud Date: 2005-10-31
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2005-11-07
Well Total Depth: 3688.00 ft
Configuration: Vertical
Latitude: 41.510000
Longitude: -81.380000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-08-03 Proposed Formations:CLINTON, Issued Date:8/3/2005, Expired Date:8/3/2006 6:00:00 AM, Drilling unit acres:21.441, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2005-10-31 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

Completed 2005-11-07 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

Reached Total Depth 2005-11-07 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

Completion Report Received 2006-05-10 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

Construction Permit Expires 2006-08-03 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

Record Last Modified 2017-02-15 INSPECTOR LOWDER CALLED 10/31/05, AND SAID THEY STARTED DRILLING THIS WELL AND HE THOUGHT THE PERMIT DID NOT HAVE ENOUGH SURFACE CASING (150'). I SAID IT SHOULD BE 250'. HE WILL MODIFY THE CASING OUT AT THE SITE. JG

ALLIANCE MET WITH NORBURT TODAY TO CHANGE THE LOCATION OF THEIR TANKS TO A BETTER LOCATION. THEY WILL SEND A NEW MAP WITH THE TANK LOCATION ON IT. NORBURT APPROVED THE CHANGE. MM 1/23/06 RECEIVED ON 1-25-06 & PUT IN SCAN BASKET...SO

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-07-28 3528 3592 65
3528 3592 65
3528 3592 65

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 69000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 ALLIANCE PETROLEUM CORPORATION 459.00 0.00 228
2007 ALLIANCE PETROLEUM CORPORATION 13825.00 106.00 365
2008 ALLIANCE PETROLEUM CORPORATION 17134.00 76.00 365
2009 ALLIANCE PETROLEUM CORPORATION 40392.00 262.00 365
2010 ALLIANCE PETROLEUM CORPORATION 29620.00 119.00 365
2011 ALLIANCE PETROLEUM CORPORATION 29703.00 125.00 365
2012 ALLIANCE PETROLEUM CORPORATION 26146.00 121.00 366
2013 ALLIANCE PETROLEUM CORPORATION 17290.00 47.00 365
2014 ALLIANCE PETROLEUM CORPORATION 26781.00 144.00 365
2015 ALLIANCE PETROLEUM CORPORATION 20280.00 58.00 365
2016 ALLIANCE PETROLEUM CORPORATION 17595.00 78.00 365
2017 ALLIANCE PETROLEUM CORPORATION 15840.00 58.00 365
2018 ALLIANCE PETROLEUM CORPORATION 14511.00 35.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 ALLIANCE PETROLEUM CORPORATION Brine 0 228
2007 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2008 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2009 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2010 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2011 ALLIANCE PETROLEUM CORPORATION Brine 0 365
2012 ALLIANCE PETROLEUM CORPORATION Brine 0 366
2013 ALLIANCE PETROLEUM CORPORATION Brine 67 365
2014 ALLIANCE PETROLEUM CORPORATION Brine 202 365
2015 ALLIANCE PETROLEUM CORPORATION Brine 147 365
2016 ALLIANCE PETROLEUM CORPORATION Brine 73 365
2017 ALLIANCE PETROLEUM CORPORATION Brine 117 365
2018 ALLIANCE PETROLEUM CORPORATION Brine 47 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1105058870 2005-11-1 0:00: DD No Violations
0555533631 2017-02-06 UrbanProduction Wells No Violations At the time of this inspection, the well was observed to be equipped with a plunger lift assembly and the valves on the wellhead were open. There was a domestic line plumbed off of the 4.5 inch casing with a meter, drip bottle and two regulators. The well was fenced and locked. The last reported production for this well was submitted in 2014. The tank battery consisted of one 100 BBL production tank, one 100 BBL brine tank and a mechanical separator. Valves on the separator were open and the chart dated 1/31/17 showed production. The tank valves were equipped with flat plugs and locks. Tanks were equipped with proper lids and hatches and the vent stack was plumbed into a 55 gallon charcoal filter, then plumbed up and topped with a spark arrestor. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the tank battery and the lease access was stable. No violations were observed.
0573378075 2006-08-14 Preliminary Restoration No Violations Location is seeded with mulch.
1105058870 2005-11-01 Drill / Deepen / Reopen No Violations Surface
1222106673 2008-09-22 Preliminary Restoration No Violations Well and tank battery are fenced. 6 foot fenced with barbed wire. Two 100 BBl tanks and a mechanical separator in battery. Well is a rabbit well. Well and battery spacing is good. Lease road is constructed out of durable material. ID signs are up. Operator has planted trees around well head and tank battery. Well has over 1000psi on it, operator is producing well 15minutes every hour. On site for a noise complaint, well does make noise when in production. The noise is from the gas passing through the lines. No Leaks at the tank battery, noted. Two minor leaks at the well head, threads at one of the gauges is leaking, another leak that is making a high pitched noise, could not find it, called Gary the pumper for Alliance requested that leaks be repaired. Well head was locked. Called Bruce and Gary in the morning before inspection for status of the well. Status of the well during inspection and information from Gary and Bruce are the same. Well has a high rock pressure, has been shut in for 4 months, noise is from the pressure of the gas.
1408586768 2006-07-20 Preliminary Restoration No Violations Location needs final grade and seed.
1442291570 2013-05-29 UrbanProduction Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The tank battery and well are in good repair and surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The vent stack on the production tank is plumbed into a 55 gallon charcoal filter. The vent stack is then plumbed up and topped with a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition.
555533631 2017-2-6 0:00:0 UP No Violations 20.00
573378075 2006-8-14 0:00: PL No Violations

For data sources see[9]