If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21890 | |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Chester Township | |
Operator Name: CUTTER EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: PILLA | |
License Status: Producing | |
License Date: 2007-07-12 | |
Spud Date: 2007-07-25 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2007-07-30 | |
Well Total Depth: 3960.00 ft | |
Configuration: Vertical | |
Latitude: 41.520000 | |
Longitude: -81.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-06-21 | Proposed Formations:CLINTON, Issued Date:6/21/2006, Expired Date:6/21/2007 6:00:00 AM, Drilling unit acres:20.83, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2007-07-12 | Proposed Formations:CLINTON, Issued Date:7/12/2007, Expired Date:7/11/2008 6:00:00 AM, Drilling unit acres:20.83, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2007-07-30 | RBDMS Rec |
Completion Report Received | 2008-04-02 | RBDMS Rec |
Construction Permit Expires | 2008-07-11 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-08-13 | 3767 | 3799 | 22 |
3767 | 3799 | 22 | |
3767 | 3799 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 73233 Gal | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | 1517.00 | 271.00 | 365 |
2009 | CUTTER EXPLORATION INC | 6982.00 | 523.00 | 365 |
2010 | CUTTER EXPLORATION INC | 8697.00 | 214.00 | 365 |
2011 | CUTTER EXPLORATION INC | 5396.00 | 227.00 | 0 |
2012 | CUTTER EXPLORATION INC | 2512.00 | 64.00 | 366 |
2013 | CUTTER EXPLORATION INC | 7134.00 | 141.00 | 365 |
2014 | CUTTER EXPLORATION INC | 1430.00 | 0.00 | 365 |
2015 | CUTTER EXPLORATION INC | 5650.00 | 80.00 | 365 |
2016 | CUTTER EXPLORATION INC | 6779.00 | 45.00 | 365 |
2017 | CUTTER EXPLORATION INC | 70.00 | 4439.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | Brine | 215 | 365 |
2009 | CUTTER EXPLORATION INC | Brine | 195 | 365 |
2010 | CUTTER EXPLORATION INC | Brine | 98 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 45 | |
2012 | CUTTER EXPLORATION INC | Brine | 60 | 366 |
2013 | CUTTER EXPLORATION INC | Brine | 45 | 365 |
2014 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
2015 | CUTTER EXPLORATION INC | Brine | 40 | 365 |
2016 | CUTTER EXPLORATION INC | Brine | 40 | 365 |
2017 | CUTTER EXPLORATION INC | Brine | 25 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1127437600 | 2013-6-6 0:00:0 | UP | No Violations | |
-1326322801 | 2015-1-13 0:00: | UP | No Violations | |
-28038620 | 2007-10-24 0:00 | PL | No Violations | |
-412499543 | 2017-4-4 0:00:0 | UP | No Violations | |
0028038620 | 2007-10-24 | Preliminary Restoration | No Violations | Site is stable, has been ruff graded. Drainage controls are in place. Site needs final grading and seeding. |
0267392114 | 2007-07-26 | Drill / Deepen / Reopen | No Violations | Surface has been set. Operator is working on equipment maintained. 8BBL return on cement. Surface hole was static Operator will break off this afternoon. Possible water well was encountered. There is a 8 PVC pipe behind the rig. Eric thought that it may be a water well. I spoke with Hughie Palmer at the Kokay, he thinks that is a clean out for the drain tile. I called Mike Cutter, he has had all water wells within 300 tested, also homes to the west. He was not aware of the pipe. There are water wells to the east of the site adjacent to RT 306, water wells have steel casings. Straw bails and silt fence need added to the north west corner of the site. I spoke to Hughie regarding the drainage controls. He will have additional controls added. |
0275865504 | 2009-08-21 | Production Wells | No Violations | Man doors are locked. Site is stable. Lease road is stable. Well is in good repair. |
0412499543 | 2017-04-04 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The well was fenced and locked. The last reported production for this well shows the records to be up to date. The tank battery consisted of one 100 BBL production tank, one 50 BBL steel brine tank and a mechanical separator. Valves on the separator were open and the chart showed production. Tank valves were equipped with flat plugs. The production tank vent stack was plumbed into a 55 gallon charcoal filter and topped with a spark arrestor. Correct lids and hatches were installed on the production tank. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the tank battery and the lease access was stable. No violations observed. |
0628520405 | 2007-07-24 | Drill / Deepen / Reopen | No Violations | Operator has cut site. Work pit has been dug, soil is clay no ground water. Silt fence has been installed at the west side of the site. Lease road is stable. Pits are south and the rig will site E/W. |
0920390642 | 2009-05-15 | Preliminary Restoration | No Violations | Man door needs repaired. Bag of diapers need removed. Reclamation is good. |
1127437600 | 2013-06-06 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve was open. The well and tank battery are in good repair and surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 50 BBL brine tank, and a mechanical separator. The production tanks vent stack is plumbed into a 55 BBL charcoal filter. Then it is plumbed up and capped with a spark arrestor. The production tank is plumbed into the brine tank. The brine tank needs to have a sealable lid or a disconnect the over flow line. The proper identification is on the tank battery. The lease road is stable. |
1186061712 | 2007-08-02 | Preliminary Restoration | No Violations | Pits have been pumped down, will be solidified next week. Safety fence is up. Lease road is stable, drainage controls are in place. Permit sign posted at the entrance of the site. |
1219930026 | 2008-08-27 | Preliminary Restoration | No Violations | Site has been graded and seeded vegetation is established. There has been an overflow in the tank battery, there were a number of diapers in the tank battery, the stone was stained. Diapers have been on site for some time, tank battery has been painted, the diapers were also painted. Called Lynn Strazi and asked what had happened and to have the diapers removed from site. Lynn, stated that when they kicked the well off the brine tank hatch was open and the tank over flowed. Site has been cleaned up, with the exception of the diapers being removed. Well head and tank battery are fenced and gates are locked. Lease road is stable. |
1326322801 | 2015-01-13 | UrbanProduction Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
267392114 | 2007-7-26 0:00: | DD | No Violations | |
275865504 | 2009-8-21 0:00: | PW | No Violations | |
628520405 | 2007-7-24 0:00: | DD | No Violations | |
920390642 | 2009-5-15 0:00: | PL | No Violations |
For data sources see[9]