If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21895 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.37,"lon":-81.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Auburn Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: LADUE TRAILS | |
License Status: Producing | |
License Date: 2006-08-04 | |
Spud Date: 2006-08-17 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2006-08-23 | |
Well Total Depth: 4183.00 ft | |
Configuration: Vertical | |
Latitude: 41.370000 | |
Longitude: -81.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-08-04 | Proposed Formations:CLINTON/MEDINA, Issued Date:8/4/2006, Expired Date:8/4/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-08-17 | RBDMS Rec |
Completed | 2006-08-23 | RBDMS Rec |
Reached Total Depth | 2006-08-23 | RBDMS Rec |
Completion Report Received | 2006-12-05 | RBDMS Rec |
Construction Permit Expires | 2007-08-04 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-02-01 | 3997 | 4078 | 100 |
3997 | 4078 | 100 | |
3997 | 4078 | 100 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 82570 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | ALLIANCE PETROLEUM CORPORATION | 14741.00 | 530.00 | 365 |
2008 | ALLIANCE PETROLEUM CORPORATION | 32115.00 | 593.00 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | 30587.00 | 320.00 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | 23110.00 | 227.00 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | 9753.00 | 139.00 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | 14050.00 | 116.00 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | 9801.00 | 54.00 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | 12177.00 | 193.00 | 365 |
2015 | ALLIANCE PETROLEUM CORPORATION | 11985.00 | 140.00 | 365 |
2016 | ALLIANCE PETROLEUM CORPORATION | 11651.00 | 111.00 | 365 |
2017 | ALLIANCE PETROLEUM CORPORATION | 13286.00 | 48.00 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | 14222.00 | 141.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2008 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2009 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | Brine | 34 | 365 |
2014 | ALLIANCE PETROLEUM CORPORATION | Brine | 95 | 365 |
2015 | ALLIANCE PETROLEUM CORPORATION | Brine | 153 | 365 |
2016 | ALLIANCE PETROLEUM CORPORATION | Brine | 32 | 365 |
2017 | ALLIANCE PETROLEUM CORPORATION | Brine | 64 | 365 |
2018 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1171526204 | 2006-8-28 0:00: | PW | No Violations | |
-1927556114 | 2016-12-13 0:00 | UP | No Violations | |
-861935532 | 2015-5-6 0:00:0 | UP | No Violations | |
0105600133 | 2014-08-19 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well is surrounded by a wooden fence. The tank battery consists of two 100 BBL production tanks, a 25 BBL poly brine tank, and two mechanical separators. The tank battery is surrounded by a locked chain link fence. The production tanks are vented through charcoal filters and up into spark arrestors. The proper identification is located on the well and the tank battery. The lease road is in stable condition. The tank battery is being shared by permit number 2-1888. |
0147851354 | 2012-03-02 | UrbanProduction Wells | No Violations | This well is equipped with a plunger lift system. The well is fenced, landscaped, an identification sign is posted and the man door is locked. The back pressure regulator is leaking and I contacted the well tender and left a message regarding this issue. The tank battery is equipped with two 110 barrel production tanks, one 1000 gallon poly brine tank and two mechincal separators. The man door is locked. The operator has constructed a boardwalk inside of the tank battery, which has ground water seeps that cause an accumulation of water inside the dike. The location is in good repair and the lease road is stable. Landscaping is established and the operator has installed visual barriers around the tank battery. |
0743404303 | 2018-02-22 | UrbanProduction Wells | No Violations | During this inspection the well is equipped with a plunger lift assembly and the annulus and flow line valves were open. The well was fenced and locked. Production for this well was up-to-date. The tank battery consisted of two 100 BBL production tanks, one 35 BBL poly brine tank and two mechanical separators. The valves on the separators were open and both charts showed production. The tank battery is shared with well 2-1888. Spark arrestors and the correct lids and hatches were installed on the production tanks. A charcoal filter was plumbed into the vent stack on the production tank. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the well and tank battery and the lease access was stable. No violations observed. |
0861935532 | 2015-05-06 | UrbanProduction Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
105600133 | 2014-8-19 0:00: | UP | No Violations | |
1156778415 | 2006-08-24 | Production Wells | Violations Noted | Rat hole not cemented to the top. Trash and debris in rat hole. Clean out rat hole and top off with cement. |
1171526204 | 2006-08-28 | Production Wells | Violations Noted | Violation has been corrected. |
1176193126 | 2007-08-28 | Preliminary Restoration | No Violations | Site has been graded and seed. Vegetation is established. Landscaping has been added around the well head and tank battery. Well head and tank battery has been fenced, locks were on gates. |
147851354 | 2012-3-2 0:00:0 | UP | No Violations | |
1927556114 | 2016-12-13 | UrbanProduction Wells | No Violations | I conducted an inspection on this well. The well is equipped with a plunger lift assembly and the valves on the wellhead were open. There was a domestic line off of the 4.5 inch casing with a meter, two regulators and a drip bottle. The well was fenced and locked. The last reported production for this well was submitted in 2014. The tank battery consisted of two 100 BBL production tanks, one 35 BBL poly brine tank and two mechanical separators. The valves on the separators were open and both charts showed production. The tank battery is shared with well 2-1888. The tank valves were plugged and locked. Spark arrestors and the correct lids and hatches were installed on the production tanks. A charcoal filter was plumbed into the vent stack on the production tank. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the well and tank battery and the lease access was stable. |
329815704 | 2019-10-29 0:00 | UP | No Violations | 0.40 |
743404303 | 2018-2-22 0:00: | UP | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1156778415 | US-OH-104126 | 2006-08-28 | General Safety | |
1171526204 | US-OH-104537 | 2006-08-28 | General Safety |
For data sources see[9]