Well ID: 34-055-21907 | |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Chester Township | |
Operator Name: CUTTER EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: KIRBY/PERKO | |
License Status: Producing | |
License Date: 2006-08-31 | |
Spud Date: 2006-12-04 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2006-12-10 | |
Well Total Depth: 3848.00 ft | |
Configuration: Vertical | |
Latitude: 41.520000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-08-31 | Proposed Formations:CLINTON, Issued Date:8/31/2006, Expired Date:8/31/2007 6:00:00 AM, Drilling unit acres:74.334, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2006-12-10 | |
Construction Permit Expires | 2007-08-31 | |
Completion Report Received | 2008-04-02 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-08-12 | 3653 | 3691 | 24 |
3653 | 3691 | 24 | |
3653 | 3691 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 62573 Gal | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | 11668.00 | 136.00 | 365 |
2009 | CUTTER EXPLORATION INC | 10314.00 | 120.00 | 365 |
2010 | CUTTER EXPLORATION INC | 5890.00 | 92.00 | 365 |
2011 | CUTTER EXPLORATION INC | 2561.00 | 43.00 | 0 |
2012 | CUTTER EXPLORATION INC | 4137.00 | 45.00 | 366 |
2013 | CUTTER EXPLORATION INC | 3400.00 | 55.00 | 365 |
2014 | CUTTER EXPLORATION INC | 2653.00 | 0.00 | 365 |
2015 | CUTTER EXPLORATION INC | 4219.00 | 60.00 | 365 |
2016 | CUTTER EXPLORATION INC | 1460.00 | 0.00 | 365 |
2017 | CUTTER EXPLORATION INC | 53.00 | 1020.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | Brine | 119 | 365 |
2009 | CUTTER EXPLORATION INC | Brine | 56 | 365 |
2010 | CUTTER EXPLORATION INC | Brine | 115 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 95 | |
2012 | CUTTER EXPLORATION INC | Brine | 45 | 366 |
2013 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
2014 | CUTTER EXPLORATION INC | Brine | 82 | 365 |
2015 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
2016 | CUTTER EXPLORATION INC | Brine | 25 | 365 |
2017 | CUTTER EXPLORATION INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1166458791 | 2007-7-18 0:00: | PL | No Violations | |
-1185643066 | 2009-8-5 0:00:0 | PW | No Violations | |
-1317119657 | 2006-11-30 0:00 | DD | No Violations | |
-1670725015 | 2006-12-29 0:00 | PL | No Violations | |
-1832601037 | 2011-4-15 0:00: | PW | No Violations | |
-1848477074 | 2006-12-4 0:00: | DD | No Violations | |
-2098331588 | 2014-10-20 0:00 | UP | No Violations | |
-2124620022 | 2006-12-5 0:00: | DD | No Violations | |
-297503741 | 2008-12-29 0:00 | PW | No Violations | |
0060519879 | 2016-08-07 | UrbanProduction Wells | No Violations | I conducted an inspection on this well. The well was equipped with a plunger lift unit and the valves on the wellhead were open. The well was fenced and the man door was locked. The tank battery consisted of one, 100 BBL production tank, one, 50 BBL steel brine tank, a heater treater separator, and a mechanical separator. There was a 55 gallon charcoal filter plumbed into the 100 BBL production tank. There was lightning protection at the tank battery. The tank battery was diked and fenced and the man door on the fence was locked. The well was identified with a clear, legibly marked well identification sign located on the tank battery fence. The access was stable. No violations. |
0248102775 | 2011-04-13 | Production Wells | No Violations | Received call from Geauga EMA, oil spill at well. Well has been spraying oil into the air possibly all night. Meet John Warelin Chester TWP. Fire Chief on location. Rabbit catcher broke off well at approximately 7:00am, fire department was on scene at 7:45am, well was shut off. Demco valve was in place, FDP was able to use valve to shut well down. Inspector on site at 8:50am. Fire Department was putting in place booms and diapers. Rabbit catcher broke off of the lubricator nipple. Rabbit is threaded onto the 1.5 inch nipple, rabbit broke off at the threads. (Pictures taken) The well sprayed approximately 2Bbls of oil and brine. The area affected by the spray was at the furthest extent 300 feet east and west in a cone shape from the wellhead and 600 feet south of the wellhead. Grossly impacted soil area extent was 75 feet south spreading out in a cone shape 85 feet east and west. Oil was released into a tributary of the Chagrin river. Approximately 10 gallons of oil was on a pond that discharges into the tributary. Operator started the following actions; Stop additional oil from entering waterway. Remove free product from water area. Remove grossly impacted soil and vegetation. Mix peat sorb into lesser impacted soil. By 3:30pm operator had completed above tasks. Operator dammed off a portion of the pond and installed a siphon dam and booms to absorb product residue. Operator had used a vac truck to remove product from pond. Operator had scrapped up grossly contaminated soil and removed the majority of it. Operator began topping driveway with new limestone. Broke equipment was removed. |
0297503741 | 2008-12-29 | Production Wells | No Violations | Battery tanks, trees for landscaping and surface pipe stored on location. Operator is leasing space from Kirby/Perko, to store equipment. Well and tank battery is in good repair. |
0606299194 | 2011-04-14 | Production Wells | No Violations | On site to check the status of the oil spill clean up. Operator had removed grossly impacted soils. Driveway was having limeston added to it. Siphon dam north west corner of pond is in place. Oil from the south end of the main pond has been removed. Booms in place in the stream. Peat sorb has been mixed into lesser impacted areas. |
1043738819 | 2006-12-07 | Drill / Deepen / Reopen | No Violations | Drill depth 2044. Pit fluid level was good, pits are in good condition. Drainage controls in place. Operator has switched over to straight fluid. |
1166458791 | 2007-07-18 | Preliminary Restoration | No Violations | Well head has been installed, tank battery has been installed, both are fenced. Silt fence needs removed, and debris around the site needs removed. Vegetation is starting to become established. |
1185643066 | 2009-08-05 | Production Wells | No Violations | 50BBL tank in the battery needs cap replaced. Man door to the well and tank battery had locks on them and were locked. Site is in good repair. Contact Cutter Exploration regarding cap to tank. |
1305294554 | 2011-05-12 | Production Wells | No Violations | Vegetation is becoming established on area affected by the oil spill. Rabbit catcher has been replaced, catcher is red in color. Lock was on the man doors to the well and tank battery. 100bbl tank needs bull plug and lock, brine tank load line needs bull plug. Contacted pumper, informed him of needed equipment. |
1317119657 | 2006-11-30 | Drill / Deepen / Reopen | No Violations | Site has been leveled. Silt fence will need installed to the south east of the site to protect the pond. Haul road has been cut in. Permit sign was posted on site. |
1369744212 | 2013-05-28 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The tank battery and well are in good repair and surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 50 BBL brine tank, and a mechanical separator. The vent stack on the production tank is plumbed into a 55 gallon charcoal filter. The vent stack is then plumbed up and topped with a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition. |
1670725015 | 2006-12-29 | Preliminary Restoration | No Violations | Pits have been closed. Site is extremely soft, drainage controls are in and at capacity. Silt fence will need repaired, mud has flowed over the top of it 3 foot section. Additional silt fence need around pond adjacent to site. |
1832601037 | 2011-04-15 | Production Wells | No Violations | On site to check the status of the oil spill clean up. Operator had removed grossly impacted soils. Section of drive that was affected, had been topped with limestone. Siphon dam north west corner of pond is in place. Oil from the south end of the main pond has been removed. Booms in place in the stream. Peat sorb has been mixed into lesser impacted areas. Wellhead was repaired. Area that soil was removed appeared to have been seeded, grass seed was visible. |
1848477074 | 2006-12-04 | Drill / Deepen / Reopen | No Violations | Site has been leveled, and debris removed. Pits will be constructed when rig moves on site. |
2098331588 | 2014-10-20 | UrbanProduction Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
2124620022 | 2006-12-05 | Drill / Deepen / Reopen | No Violations | On site for surface cement, 2BBL return of cement held at surface. Special permit conditions with permit regarding pit construction. Operator failed to contact inspector 24 hours before pit construction. East pits had been constructed that day, they were not lined. Water was entering pit from the north. Operator packed the sides of the pit with clay, and sprayed the sides with a bentonite slurry. |
248102775 | 2011-4-13 0:00: | PW | No Violations | |
60519879 | 2016-8-7 0:00:0 | UP | No Violations | |
606299194 | 2011-4-14 0:00: | PW | No Violations |
For data sources see[9]