If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5,"lon":-81.32,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Russell Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: YABROFF UNIT | |
License Status: Producing | |
License Date: 2007-12-04 | |
Spud Date: 2008-01-02 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-01-08 | |
Well Total Depth: 3836.00 ft | |
Configuration: Vertical | |
Latitude: 41.500000 | |
Longitude: -81.320000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-12-04 | Proposed Formations:CLINTON, Issued Date:12/4/2007, Expired Date:12/3/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-01-08 | |
Completion Report Received | 2008-03-10 | |
Change of Owner | 2008-06-04 | Operator changed from 169, SMAIL JAMES R INC to 3442, CUTTER EXPLORATION INC |
Construction Permit Expires | 2008-12-03 | |
Change of Owner | 2009-06-08 | Operator changed from 3442, CUTTER EXPLORATION INC to 169, SMAIL JAMES R INC |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-07-29 | 3673 | 3712 | 22 |
3673 | 3712 | 22 | |
3673 | 3712 | 22 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 59000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | 4046.00 | 517.00 | 365 |
2009 | CUTTER EXPLORATION INC | 13437.00 | 558.00 | 365 |
2010 | CUTTER EXPLORATION INC | 8367.00 | 336.00 | 365 |
2011 | CUTTER EXPLORATION INC | 6003.00 | 201.00 | 0 |
2012 | JAMES R SMAIL INC | 4911.00 | 163.00 | 366 |
2013 | JAMES R SMAIL INC | 1752.00 | 109.00 | 365 |
2014 | JAMES R SMAIL INC | 9116.00 | 213.00 | 365 |
2015 | JAMES R SMAIL INC | 5518.00 | 104.00 | 365 |
2016 | JAMES R SMAIL INC | 4807.00 | 114.00 | 365 |
2017 | JAMES R SMAIL INC | 4390.00 | 123.00 | 365 |
2018 | JAMES R SMAIL INC | 4182.00 | 131.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER EXPLORATION INC | Brine | 208 | 365 |
2009 | CUTTER EXPLORATION INC | Brine | 266 | 365 |
2010 | CUTTER EXPLORATION INC | Brine | 153 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 20 | |
2012 | JAMES R SMAIL INC | Brine | 123 | 366 |
2013 | JAMES R SMAIL INC | Brine | 83 | 365 |
2014 | JAMES R SMAIL INC | Brine | 80 | 365 |
2015 | JAMES R SMAIL INC | Brine | 133 | 365 |
2016 | JAMES R SMAIL INC | Brine | 0 | 365 |
2017 | JAMES R SMAIL INC | Brine | 63 | 365 |
2018 | JAMES R SMAIL INC | Brine | 125 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0955950794 | 2008-01-28 | Drill / Deepen / Reopen | No Violations | Rig is off site. Pits have been solidified and closed. 4.5 pipe has a bull plug in it. Annulus is open and bubbling. Safety fence is up. Drainage controls are in place. |
1199907370 | 2007-01-09 | Drill / Deepen / Reopen | No Violations | Rig moving off site. Broom on site cleaning road. Spoke to equipment operator, RT 306 needs cleaned where they are moving equipment offsite as well. Equipment operator stated he was going up to RT 306 to clean road, as soon as last load is out of permit 22005. Lease road is soft, rock apron is holding up, mud is coming from drill site. |
1221505186 | 2008-09-15 | Preliminary Restoration | No Violations | Two tree have fallen along the lease road blocking it, no damage to the well or tank battery. Two stockpiles of soil on site one of clay and one of topsoil, Spoke to Warren regarding soil, they do not have enough room on site to use it. They are going to drill a Yabroff #2, they will use soil for reclamation on that site. I requested that Warren seed stockpile to prevent erosion. Tank battery is holding water, diapers are in the battery floating. Requested that Warren have tank battery cleaned up. Tank battery and well head have 6 foot fences with barbed wire. Permit ID sign is up at the entrance. Lease road is stable and constructed out of durable material. |
1264211389 | 2007-01-17 | Drill / Deepen / Reopen | No Violations | Palmer Excavating and Warren Schoerfelt on site. Rig is offsite. Operator was ruff grading with the excavator during inspection. Pits will be closed and solidified Friday 01/18/2007. Lease road is stable. Safety fence is up around pits. Lease road is stable. Site is snow covered. |
1270831612 | 2013-05-29 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open to a pop off valve. The tank battery and well are in good repair and surrounded by a chain link fence. The tank battery consists of two 100 BBL production tanks, a 50 BBL poly brine tank, and a mechanical separator. The vent stack on the production tank is plumbed into a 5 gallon charcoal filter. The vent stack is then plumbed up and topped with a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition. |
1274207751 | 2010-05-14 | Production Wells | No Violations | On site with Warren from Smail James R INC. Spacing is incorrect in the tank battery. There is not sufficient space between the separator and the 100bbl tank. There is two 100BBL tank and one 1500Gal. Poly tank in the battery. There is 3 feet between the tanks, there is less than 10 feet between the 100BBL production tank and the separator. Operator is to drain the production tank and change it over to brine only, temporarily. Separator will be moved to the required 10 feet. Identification sign is posted. Man doors were locked. Drain plugs were in the dike drain. Well head was in good repair. |
1495197830 | 2017-05-09 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equippedc with a plunger lift assembly and the valves on the wellhead were open. The well was fenced with a locked man door. Production records for this well were up to date. The tank battery consisted of two 100 BBL production tanks, one 50 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart dated 5/9/17 showed production. The production tank vent stack was plumbed into a 5 gallon charcoal filter and topped with a spark arrestor. Tank valves were equipped with flat plugs. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the well and tank battery. The lease access was stable. No violations observed. |
955950794 | 2008-1-28 0:00: | DD | No Violations |
For data sources see[9]