Well Details

Well ID: 34-055-22005
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Russell Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: YABROFF UNIT
License Status: Producing
License Date: 2007-12-04
Spud Date: 2008-01-02
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2008-01-08
Well Total Depth: 3836.00 ft
Configuration: Vertical
Latitude: 41.500000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-12-04 Proposed Formations:CLINTON, Issued Date:12/4/2007, Expired Date:12/3/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-01-08
Completion Report Received 2008-03-10
Change of Owner 2008-06-04 Operator changed from 169, SMAIL JAMES R INC to 3442, CUTTER EXPLORATION INC
Construction Permit Expires 2008-12-03
Change of Owner 2009-06-08 Operator changed from 3442, CUTTER EXPLORATION INC to 169, SMAIL JAMES R INC
Change of Owner 2019-04-29 Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2019-04-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-07-29 3673 3712 22
3673 3712 22
3673 3712 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 59000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 CUTTER EXPLORATION INC 4046.00 517.00 365
2009 CUTTER EXPLORATION INC 13437.00 558.00 365
2010 CUTTER EXPLORATION INC 8367.00 336.00 365
2011 CUTTER EXPLORATION INC 6003.00 201.00 0
2012 JAMES R SMAIL INC 4911.00 163.00 366
2013 JAMES R SMAIL INC 1752.00 109.00 365
2014 JAMES R SMAIL INC 9116.00 213.00 365
2015 JAMES R SMAIL INC 5518.00 104.00 365
2016 JAMES R SMAIL INC 4807.00 114.00 365
2017 JAMES R SMAIL INC 4390.00 123.00 365
2018 JAMES R SMAIL INC 4182.00 131.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 CUTTER EXPLORATION INC Brine 208 365
2009 CUTTER EXPLORATION INC Brine 266 365
2010 CUTTER EXPLORATION INC Brine 153 365
2011 CUTTER EXPLORATION INC Brine 20
2012 JAMES R SMAIL INC Brine 123 366
2013 JAMES R SMAIL INC Brine 83 365
2014 JAMES R SMAIL INC Brine 80 365
2015 JAMES R SMAIL INC Brine 133 365
2016 JAMES R SMAIL INC Brine 0 365
2017 JAMES R SMAIL INC Brine 63 365
2018 JAMES R SMAIL INC Brine 125 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0955950794 2008-01-28 Drill / Deepen / Reopen No Violations Rig is off site. Pits have been solidified and closed. 4.5 pipe has a bull plug in it. Annulus is open and bubbling. Safety fence is up. Drainage controls are in place.
1199907370 2007-01-09 Drill / Deepen / Reopen No Violations Rig moving off site. Broom on site cleaning road. Spoke to equipment operator, RT 306 needs cleaned where they are moving equipment offsite as well. Equipment operator stated he was going up to RT 306 to clean road, as soon as last load is out of permit 22005. Lease road is soft, rock apron is holding up, mud is coming from drill site.
1221505186 2008-09-15 Preliminary Restoration No Violations Two tree have fallen along the lease road blocking it, no damage to the well or tank battery. Two stockpiles of soil on site one of clay and one of topsoil, Spoke to Warren regarding soil, they do not have enough room on site to use it. They are going to drill a Yabroff #2, they will use soil for reclamation on that site. I requested that Warren seed stockpile to prevent erosion. Tank battery is holding water, diapers are in the battery floating. Requested that Warren have tank battery cleaned up. Tank battery and well head have 6 foot fences with barbed wire. Permit ID sign is up at the entrance. Lease road is stable and constructed out of durable material.
1264211389 2007-01-17 Drill / Deepen / Reopen No Violations Palmer Excavating and Warren Schoerfelt on site. Rig is offsite. Operator was ruff grading with the excavator during inspection. Pits will be closed and solidified Friday 01/18/2007. Lease road is stable. Safety fence is up around pits. Lease road is stable. Site is snow covered.
1270831612 2013-05-29 UrbanProduction Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open to a pop off valve. The tank battery and well are in good repair and surrounded by a chain link fence. The tank battery consists of two 100 BBL production tanks, a 50 BBL poly brine tank, and a mechanical separator. The vent stack on the production tank is plumbed into a 5 gallon charcoal filter. The vent stack is then plumbed up and topped with a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition.
1274207751 2010-05-14 Production Wells No Violations On site with Warren from Smail James R INC. Spacing is incorrect in the tank battery. There is not sufficient space between the separator and the 100bbl tank. There is two 100BBL tank and one 1500Gal. Poly tank in the battery. There is 3 feet between the tanks, there is less than 10 feet between the 100BBL production tank and the separator. Operator is to drain the production tank and change it over to brine only, temporarily. Separator will be moved to the required 10 feet. Identification sign is posted. Man doors were locked. Drain plugs were in the dike drain. Well head was in good repair.
1495197830 2017-05-09 UrbanProduction Wells No Violations At the time of this inspection, the well was equippedc with a plunger lift assembly and the valves on the wellhead were open. The well was fenced with a locked man door. Production records for this well were up to date. The tank battery consisted of two 100 BBL production tanks, one 50 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart dated 5/9/17 showed production. The production tank vent stack was plumbed into a 5 gallon charcoal filter and topped with a spark arrestor. Tank valves were equipped with flat plugs. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the well and tank battery. The lease access was stable. No violations observed.
955950794 2008-1-28 0:00: DD No Violations

For data sources see[9]