If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.41,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Parkman Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: MILLER | |
License Status: Producing | |
License Date: 2008-04-16 | |
Spud Date: 2008-09-30 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-10-05 | |
Well Total Depth: 4326.00 ft | |
Configuration: Vertical | |
Latitude: 41.410000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-04-16 | Proposed Formations:CLINTON, Issued Date:4/16/2008, Expired Date:4/16/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Change of Owner | 2008-07-21 | Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC |
Reached Total Depth | 2008-10-05 | |
Completion Report Received | 2009-03-03 | |
Construction Permit Expires | 2009-04-16 | |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-05-21 | 4071 | 4166 | 38 |
4071 | 4166 | 38 | |
4071 | 4166 | 38 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1212 Bbl | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EXCO - NORTH COAST ENERGY INC | 6614.00 | 147.00 | 69 |
2009 | ENERVEST OPERATING LLC | 21507.00 | 0.00 | 92 |
2010 | ENERVEST OPERATING LLC | 16069.00 | 231.00 | 365 |
2011 | ENERVEST OPERATING LLC | 16647.00 | 164.00 | 0 |
2012 | ENERVEST OPERATING LLC | 16198.00 | 72.00 | 366 |
2013 | ENERVEST OPERATING LLC | 13149.00 | 131.00 | 365 |
2014 | ENERVEST OPERATING LLC | 12414.00 | 0.00 | 365 |
2015 | ENERVEST OPERATING LLC | 10809.00 | 143.00 | 365 |
2016 | ENERVEST OPERATING LLC | 9207.00 | 79.00 | 366 |
2017 | ENERVEST OPERATING LLC | 9941.00 | 105.00 | 362 |
2018 | ENERVEST OPERATING LLC | 6647.00 | 37.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EXCO - NORTH COAST ENERGY INC | Brine | 314 | 69 |
2009 | EXCO - NORTH COAST ENERGY INC | Brine | 292 | 365 |
2010 | ENERVEST OPERATING LLC | Brine | 91 | 365 |
2011 | ENERVEST OPERATING LLC | Brine | 85 | |
2012 | ENERVEST OPERATING LLC | Brine | 59 | 366 |
2013 | ENERVEST OPERATING LLC | Brine | 23 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 87 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 133 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 62 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 85 | 362 |
2018 | ENERVEST OPERATING LLC | Brine | 90 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1933350178 | 2008-7-2 0:00:0 | DD | No Violations | |
1104273515 | 2013-04-22 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open and plumbed into the production tank. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1180501976 | 2014-01-27 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open and plumbed into the production tank. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1445875672 | 2015-10-23 | Production Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
1507864909 | 2011-06-29 | Preliminary Restoration | No Violations | Well currently produced off of a swedge. Battery has a 210Bbl production tank and a mechanical separator. Well site has been returned to pasture. Lease road is stable and constructed out of rock. Lease road is also a driveway for a residence. Tank battery is in good repair. Dike is sufficient. Production tank is 50 feet from the berm of RT 168. Spacing is correct. Dike has a drain pipe in it, the drain has a riser pipe to prevent leaking. |
1635760940 | 2008-10-02 | Drill / Deepen / Reopen | No Violations | On site for surface cement. Lease road is stable. Road plow on site to clean road. Operator ran 431 of R-3 23lb new pipe. 6 barrel return of cement to surface, 4 barrels of cement was good quality first two were thin. Berea bottom was 377. Cement head was leaking, cement held at surface then fell when head began to leak. Operator attempted to stop leak, leak had slowed within 5 minutes after plug down. Plug was down at 10:20am. Operator can break off at 6:20pm. Tank battery is under construction. Measured distance of production tank to traveled portion of RT 168, tank is 50 from the berm of the road. |
1933350178 | 2008-07-02 | Drill / Deepen / Reopen | No Violations | drilling 3120 no violation |
For data sources see[9]