{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.51,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Chester Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: MIESZ-HOOD UNIT | |
License Status: Producing | |
License Date: 2008-06-11 | |
Spud Date: 2008-08-28 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-09-06 | |
Well Total Depth: 3682.00 ft | |
Configuration: Vertical | |
Latitude: 41.510000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-06-11 | Proposed Formations:CLINTON, Issued Date:6/11/2008, Expired Date:6/11/2009 6:00:00 AM, Drilling unit acres:29.59, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-09-06 | |
Completion Report Received | 2008-10-22 | |
Change of Owner | 2009-01-15 | Operator changed from 169, SMAIL JAMES R INC to 3442, CUTTER EXPLORATION INC |
Change of Owner | 2009-06-08 | Operator changed from 3442, CUTTER EXPLORATION INC to 169, SMAIL JAMES R INC |
Construction Permit Expires | 2009-06-11 | |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-01 | 3487 | 3523 | 26 |
3487 | 3523 | 26 | |
3487 | 3523 | 26 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 65615 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | CUTTER EXPLORATION INC | 25055.00 | 182.00 | 365 |
2010 | CUTTER EXPLORATION INC | 27663.00 | 189.00 | 365 |
2011 | CUTTER EXPLORATION INC | 14192.00 | 102.00 | 0 |
2012 | JAMES R SMAIL INC | 14463.00 | 102.00 | 366 |
2013 | JAMES R SMAIL INC | 10189.00 | 67.00 | 365 |
2014 | JAMES R SMAIL INC | 12315.00 | 124.00 | 365 |
2015 | JAMES R SMAIL INC | 13067.00 | 123.00 | 365 |
2016 | JAMES R SMAIL INC | 13153.00 | 54.00 | 365 |
2017 | JAMES R SMAIL INC | 10481.00 | 55.00 | 365 |
2018 | JAMES R SMAIL INC | 12436.00 | 96.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | CUTTER EXPLORATION INC | Brine | 217 | 365 |
2010 | CUTTER EXPLORATION INC | Brine | 134 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 25 | |
2012 | JAMES R SMAIL INC | Brine | 50 | 366 |
2013 | JAMES R SMAIL INC | Brine | 30 | 365 |
2014 | JAMES R SMAIL INC | Brine | 40 | 365 |
2015 | JAMES R SMAIL INC | Brine | 104 | 365 |
2016 | JAMES R SMAIL INC | Brine | 79 | 365 |
2017 | JAMES R SMAIL INC | Brine | 0 | 365 |
2018 | JAMES R SMAIL INC | Brine | 52 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-160320799 | 2008-8-29 0:00: | DD | No Violations | |
-1868558603 | 2016-5-12 0:00: | UP | No Violations | |
-35855902 | 2009-7-29 0:00: | PW | No Violations | |
0035855902 | 2009-07-29 | Production Wells | Violations Noted | Preliminary restoration is completed and looks outstanding, can be passed once lock is installed on man door to the well head. Lock on man door to the well head needs installed. |
0160320799 | 2008-08-29 | Drill / Deepen / Reopen | No Violations | On site for surface cement. Lease road is stable and in good repair. Permit is posted in the dog house. Good circulation on the hole, operator had surface pipe ran before I arrived. Surface job went well, 10 BBL return. Cement return just as operator began to displace cement. Pits are in good repair. Operator will break off tonight, nipple up and shut down for the weekend. Safety fence is up on the backside of the pits. |
0212496031 | 2017-01-24 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The last reported production for this well was submitted in 2015. The well was fenced with a locked man door. The tank battery consisted of one 100 BBL production tank, one 50 BBL poly brine tank and a mechanical separator. The valves on the separator were open and the chart showed production. The vent stack on the production tank was plumbed into a 55 gallon charcoal filter, then plumbed up and topped with a spark arrestor. The tank valves were equipped with flat plugs. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery and the lease access was stable. No violations were observed. |
0216656044 | 2010-04-22 | Production Wells | Violations Noted | On site 7:45am, contractors arriving on site. Crude oil and brine was released in the tank battery. The 3 inch flow line at the bottom of 100 BBL tank had been pulled away from the tank causing the leak. Brine hauler was on site 04/21/2010. Leak was discovered by Mark Terpact well tender in the afternoon of 04/21/2010 . Crude oil escaped the tank battery. The crude oil enter a drainage ditch and flowed west for 102 feet. Straw bails and peat moss have been applied in the ditch, to prevent further spread of oil. Vegetation in the ditch is still green, no brine scalding noted at this time. Air readings for the area Zero LEL Zero H2S, taken with PhD*lite. Scott Miller from Scott Miller Contracting, on site for clean up. Scott and I agreed, tank battery will be stripped of equipment, contaminated rock and subsoils will be removed, soils will be removed from the ditch and removed from site. All removed material will be taken to an appropriate disposal facility. Clean clay will be brought onto site and placed in the bottom of the battery, clay will be compacted. Scott is going to trench around the battery and use clay below and above grade to build the dike. While excavating the rock out of the tank battery, it was noted that the north end of the battery was built on top of size 3 and 4 rock with 57 rock on top. The dike was placed on top of the rock. The rock allowed the crude oil to escape the dike. Rock was removed from the battery. Contaminated material excavated during clean up was placed into a roll off dumpsters, that was lined with a plastic liner. |
0234159758 | 2009-03-27 | Drill / Deepen / Reopen | No Violations | Site has been ruff graded. Well head and tank battery has been fenced. |
0239894564 | 2009-10-19 | Preliminary Restoration | No Violations | Lease road is stable. Vegetation is established. Tank battery and wellhead are fenced. Lease road gate is up. Identification signs are up. Dike around tank battery is in good repair. Locks are on all man doors and secured. |
0382866590 | 2008-09-22 | Drill / Deepen / Reopen | No Violations | Drill has been completed. Pits are filled and closed. Lease road is stable and constructed out of durable material. Pressure on the annulus is zero. Bull plug on the well head. Pop off and gauge on the annulus. Safety fence and ID sign is up. |
0646397038 | 2010-04-23 | Production Wells | No Violations | Operator is continuing to remove contaminated soil from the tank battery. Soil and rock will be taken to a Waste Management landfill in Ashtabula, Ohio. Booms will be placed in the drainage ditch to prevent any residual oil from leaving the site. |
0736842044 | 2010-05-14 | Production Wells | No Violations | On site with Warren Shoenfelt from Smail James R INC, Bob Moss Ergon Oil Purchasing, INC. Mark Tirpek contract pumper for Smail. On site for discussion of the cause of the oil spill. The bottom of the 100BBL tank has a three inch line that comes out of it. There was 3 inch nipple at the bottom of the tank that connects into a ball valve, then there was another section of pipe approximately 12 inches long that connects into a 90 degree elbow. From the 90 degree elbow the flow line ran to the north end of the tank battery. The valve was pulled apart at the threads. The meeting was to discuss if the brine hauler pulled away from the battery with the load line still connect to the truck. When leak was located by Mark, per Mark the lease road gate was locked and the man door was locked. The hauler ticket was located under a rock not the usually location of on the tank ladder. Haul tickets and gauges were compared, there was a discrepancy of 3 BBLs of fluid that would suggest the final reading was an estimate. Ergon agreed to pay for oil spill clean up. |
0908619280 | 2008-08-25 | Drill / Deepen / Reopen | No Violations | On site with Jay Cheslock, meet with Warren from J R Smail. Operator has installed the lease road, lease road is constructed out of durable material. Operator was digging the blow pit at the time of inspection. North end of the blow pit, the bottom of the pit had water leaking into it. First 4 feet of the pit was topsoil and clay, the last three feet is a mix of shale and sandstone that is thinly laminated. Were the sandstone and shale met, ground water was entering the pit. Operator is going to back fill 1.5 feet of the pit with clay, to prevent ground water form entering the pit. Pit will need to be betonite coated, padded with straw before lined. Cuttings from the blow pit may need to be removed from site, once drilling is completed. |
1271949623 | 2010-04-21 | Administrative Inspection | No Violations | Call from Warren Schonfelt from James Smail R. INC, message left time of call 6:39pm. Warren reported an oil and gas release at the well. Release between 3 to 5 BBLs of brine and oil, some of the oil and brine escaped the dike. Spill is contained at this time. Will contact me if there is any issues. |
1709763997 | 2013-02-07 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The well head is surrounded by a locked wooden fence. The ballon valves on the well head all had locks on them and each valve had a gauge on it. The casing pressure had 700 psi on it and the tubing had 1200 psi on it. The tank battery was surrounded by a locked wooden fence and a proper dike. The tank battery consists of a 100 barrel steel production tank, a 50 barrel poly brine tank, a dominion gas sales line, and a mechanical separator. The separator had a 16 day production chart in the meter box. All of the valves had locks on them. The drip lines of the sales line were all plumbed back into the 100 barrel tank. The production tank was vented to a 55 gallon drum charcoal filter, due to the area being zoned urban. The proper identification sign was on both the well head and the tank battery. The lease road had a locked gate on it and was in good condition. |
1868558603 | 2016-05-12 | UrbanProduction Wells | No Violations | My inspection found no changes since my last inspection. The fence man doors and lease road gate are all secured with a lock. |
1904519431 | 2014-10-20 | UrbanProduction Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
212496031 | 2017-1-24 0:00: | UP | No Violations | |
216656044 | 2010-4-22 0:00: | PW | No Violations | |
234159758 | 2009-3-27 0:00: | DD | No Violations | |
239894564 | 2009-10-19 0:00 | PL | No Violations | |
382866590 | 2008-9-22 0:00: | DD | No Violations | |
646397038 | 2010-4-23 0:00: | PW | No Violations | |
736842044 | 2010-5-14 0:00: | PW | No Violations | |
908619280 | 2008-8-25 0:00: | DD | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0035855902 | US-OH-123771 | 2009-08-04 | General Safety | |
0216656044 | US-OH-122143 | 2010-04-22 | Well operation causing pollution and contamination | |
0216656044 | US-OH-122144 | 2010-04-22 | Dike or pit not able to prevent escape of brine or other wastes |
For data sources see[9]