34-055-22050

Well Details

Well ID: 34-055-22050
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Burton Township
Operator Name: DAVID R HILL INC
Well Pad ID:
Farm/Lease Name: VECCHIO UNIT
License Status: Producing
License Date: 2008-06-17
Spud Date: 2008-08-19
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2008-08-25
Well Total Depth: 4113.00 ft
Configuration: Vertical
Latitude: 41.490000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-06-17 Proposed Formations:CLINTON/MEDINA, Issued Date:6/17/2008, Expired Date:6/17/2009 6:00:00 AM, Drilling unit acres:50.7499, Proposed Well Type:OG, Proposed Well Class:
Reached Total Depth 2008-08-25
Completion Report Received 2008-11-17
Construction Permit Expires 2009-06-17
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-09 3936 4028 132
3936 4028 132
3936 4028 132

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 75000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 DAVID R HILL INC 419.00 0.00 147
2010 DAVID R HILL INC 917.00 0.00 365
2011 DAVID R HILL INC 360.00 61.00 365
2012 DAVID R HILL INC 256.00 0.00 366
2013 DAVID R HILL INC 264.00 0.00 365
2014 DAVID R HILL INC 136.00 0.00 365
2015 DAVID R HILL INC 83.00 0.00 365
2016 DAVID R HILL INC 0.00 0.00 365
2017 DAVID R HILL INC 67.00 0.00 365
2018 DAVID R HILL INC 54.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 DAVID R HILL INC Brine 0 147
2010 DAVID R HILL INC Brine 0 365
2011 DAVID R HILL INC Brine 1 365
2012 DAVID R HILL INC Brine 0 366
2013 DAVID R HILL INC Brine 0 365
2014 DAVID R HILL INC Brine 0 365
2015 DAVID R HILL INC Brine 0 365
2016 DAVID R HILL INC Brine 0 365
2017 DAVID R HILL INC Brine 0 365
2018 DAVID R HILL INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1608370252 2008-8-20 0:00: DD No Violations
-1972390633 2008-8-21 0:00: DD No Violations
-259710625 2008-8-20 0:00: DD No Violations
0259710625 2008-08-20 Drill / Deepen / Reopen No Violations I performed a rig inspection. I GPSd the well. The pit liners and the location were in good shape. There were no violations at this time.
0581641929 2014-04-24 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
0919100718 2008-08-21 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
0988080657 2011-11-21 Preliminary Restoration No Violations This well is equipped with a plunger lift system. The annulus is shut in and is plumbed into the flow line with a 1/4 copper line. Domestic production comes off of the 4.5 casing. The tank battery is equipped with one 110 barrel tank, one 1500 gallon poly brine tank and a mechincal separator. The dike is in good repair, equipment spacing is correct and proper identification is posted. The lease road is stable.
1220017475 2008-08-29 Drill / Deepen / Reopen No Violations Pits have been solidified. Work pit is firm and in good order. Blow pit is firming up, south west corner is soft, the remainder of the pit is firm. Spoke Don Craiger they put a 2nd load in the blow pit, should firm up by the after noon. Site is soft, are has had a couple inches of rain the past few days. Lease road is stable to the pasture, and constructed out of durable material. Drill site is soft from the rain.
1608370252 2008-08-20 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 11 3/4 conductor pipe. There were no violations at this time.
1972390633 2008-08-21 Drill / Deepen / Reopen No Violations I performed a rig inspection. The pit liners and the location were in good shape. There were no violations at this time.
581641929 2014-4-24 0:00: PW No Violations
919100718 2008-8-21 0:00: DD No Violations
988080657 2011-11-21 0:00 PL No Violations

For data sources see[9]

References