If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22089 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.48,"lon":-81.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Burton Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: GEAUGA CO FAIRGROUNDS | |
License Status: Producing | |
License Date: 2009-04-16 | |
Spud Date: 2009-04-27 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2009-05-03 | |
Well Total Depth: 4202.00 ft | |
Configuration: Vertical | |
Latitude: 41.480000 | |
Longitude: -81.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-04-16 | Proposed Formations:CLINTON, Issued Date:4/16/2009, Expired Date:4/16/2010 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-05-03 | |
Completion Report Received | 2010-02-04 | |
Construction Permit Expires | 2010-04-16 | |
Change of Owner | 2019-04-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-04-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-04-20 | 3997 | 4080 | 35 |
3997 | 4080 | 35 | |
3997 | 4080 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 78000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | CUTTER EXPLORATION INC | 1604.00 | 264.00 | 365 |
2010 | CUTTER EXPLORATION INC | 6202.00 | 340.00 | 365 |
2011 | CUTTER EXPLORATION INC | 4616.00 | 194.00 | 0 |
2012 | JAMES R SMAIL INC | 3359.00 | 171.00 | 366 |
2013 | JAMES R SMAIL INC | 2445.00 | 128.00 | 365 |
2014 | JAMES R SMAIL INC | 1348.00 | 69.00 | 365 |
2015 | JAMES R SMAIL INC | 893.00 | 132.00 | 365 |
2016 | JAMES R SMAIL INC | 1049.00 | 67.00 | 365 |
2017 | JAMES R SMAIL INC | 867.00 | 0.00 | 365 |
2018 | JAMES R SMAIL INC | 870.00 | 130.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | CUTTER EXPLORATION INC | Brine | 1592 | 365 |
2010 | CUTTER EXPLORATION INC | Brine | 170 | 365 |
2011 | CUTTER EXPLORATION INC | Brine | 106 | |
2012 | JAMES R SMAIL INC | Brine | 60 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
2015 | JAMES R SMAIL INC | Brine | 0 | 365 |
2016 | JAMES R SMAIL INC | Brine | 0 | 365 |
2017 | JAMES R SMAIL INC | Brine | 0 | 365 |
2018 | JAMES R SMAIL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1091379424 | 2009-4-29 0:00: | DD | No Violations | |
-636598205 | 2009-5-20 0:00: | AM | No Violations | |
0167592236 | 2009-04-27 | Drill / Deepen / Reopen | No Violations | On site for CND cement, job went well. Checked pits. Back pit will need to be back filled ground water has entered the pit. Per the operator pit was dry when it was first dug. Water seeped in over night. Operator instructed to back fill pit with clay to prevent ground water contaminations. Pits need to be treated with clay before lining. |
0636598205 | 2009-05-20 | Administrative Inspection | No Violations | E-mail from Warren Shoenfelt reporting 5 day annulus test result was zero psi. |
0788137170 | 2009-09-15 | Preliminary Restoration | No Violations | Well is a rabbit well. Fenced with chain link and barbed wire. Tank battery has a 100BBL tank and 1500Gal poly tank in it. Mechanical separator. Dike is in good repair. Fence is in good repair. Locks on all man doors. Charcoal filter and spark arrestor are in place. Vegetation is established. Lease road is stable. |
0804667875 | 2014-04-24 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well and the tank battery are in good repair and are surrounded by locked chain link fences. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The production tank is vented up through a 5 gallon charcoal filter. The proper identification is located on the tank battery and the well. The lease road is in stable condition. |
0839709623 | 2009-04-28 | Drill / Deepen / Reopen | No Violations | On site for surface job. Job went well. |
0856195177 | 2015-07-21 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well and the tank battery are in good repair and are surrounded by locked chain link fences. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The production tank is vented up through a 5 gallon charcoal filter. The proper identification is located on the tank battery and the well. The lease road is in stable condition. |
1091379424 | 2009-04-29 | Drill / Deepen / Reopen | No Violations | Pits are in good repair. Operator needs to dam off flow ditch from annulus to the pits. Flow ditch is open soil. Per driller slight smell of gas at 1528. |
1241799777 | 2009-05-08 | Production Wells | No Violations | Warren from JR Smail on site, tank battery equipment being delivered on site. Operator has added two loads of cement fines to the pits. Pits are starting to firm up. Operator will be adding a third load. |
1554471502 | 2009-04-28 | Drill / Deepen / Reopen | No Violations | Pits are under repair. Operator is backfilling pits to prevent ground water from being exposed to the pits. |
167592236 | 2009-4-27 0:00: | DD | No Violations | |
788137170 | 2009-9-15 0:00: | PL | No Violations | |
804667875 | 2014-4-24 0:00: | PW | No Violations | |
839709623 | 2009-4-28 0:00: | DD | No Violations | |
856195177 | 2015-7-21 0:00: | PW | No Violations |
For data sources see[9]