Well Details

Well ID: 34-055-22123
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Chester Township
Operator Name: CUTTER EXPLORATION INC
Well Pad ID:
Farm/Lease Name: MANDALFINO
License Status: Producing
License Date: 2010-05-19
Spud Date: 2010-11-15
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2010-11-20
Well Total Depth: 3836.00 ft
Configuration: Vertical
Latitude: 41.540000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-19 Proposed Formations:CLINTON, Issued Date:5/19/2010, Expired Date:5/19/2011 6:00:00 AM, Drilling unit acres:41.03, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-11-20
Completion Report Received 2010-12-27
Construction Permit Expires 2011-05-19
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-04-22 3668 3695 28
3668 3695 28
3668 3695 28

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 65000 Gal 45000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 CUTTER EXPLORATION INC 6867.00 236.00 0
2012 CUTTER EXPLORATION INC 5515.00 190.00 366
2013 CUTTER EXPLORATION INC 5733.00 54.00 365
2014 CUTTER EXPLORATION INC 4000.00 85.00 365
2015 CUTTER EXPLORATION INC 3146.00 55.00 365
2016 CUTTER EXPLORATION INC 1438.00 0.00 365
2017 CUTTER EXPLORATION INC 97.00 2450.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 CUTTER EXPLORATION INC Brine 423
2012 CUTTER EXPLORATION INC Brine 192 366
2013 CUTTER EXPLORATION INC Brine 55 365
2014 CUTTER EXPLORATION INC Brine 30 365
2015 CUTTER EXPLORATION INC Brine 25 365
2016 CUTTER EXPLORATION INC Brine 0 365
2017 CUTTER EXPLORATION INC Brine 120 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1310694023 2013-6-12 0:00: UP No Violations
-1320720236 2012-3-30 0:00: UP No Violations
-174946513 2013-10-22 0:00 UP No Violations
-177228693 2010-11-16 0:00 UD No Violations
-998582064 2010-11-15 0:00 UD No Violations
0174946513 2013-10-22 UrbanProduction Wells No Violations I was on location today with Tom Hill. My inspection found no changes since my last inspection.
0177228693 2010-11-16 Urban Drill / Deepen / Reopen No Violations On site for Surface Cement. HL#2 11 inch TD at 290. Surface casing is R-3 New 20lb pipe, set open ended. Pipe set at 265/ 275 with landing joint. Berea was 150 to 200 driller took good samples of cuttings. Operator broke circulation ran half a bag of cotton seed hauls ahead of cement. Operator mixed cement, mixed half a bag of hauls in with cement at the start of the job. Operator ran 110 sacks of class A 3% CaCl cement. Cement returned to surface at the start of displacement, 7Bbls of good cement returned to surface. Cement held at surface. Permit was posted in the dog house. Safety fence was up. Fire extinguishers were in place. Hand rails were in place. Pits were in good repair. Operator had added additional silt fence per my requested. Plug down 1:10pm.
0730901374 2010-11-15 Urban Drill / Deepen / Reopen No Violations Rig is rigged up North/South. Pits are to the west. Topsoil is to the west and south of the rig. Location is stone. Silt fence has been installed, requested additional silt fence be installed around the topsoil stockpile. Pits are dry and the soil is hard brown clay, no ground water noted. Operator has made PVC pipe hangers to raise the electirc lines to a safe height on location. Operator was repairing the electric line for the water well for the home north of the rig, the line was cut during the clearing of the location. Fresh water will be taken from local stream.
0998582064 2010-11-15 Urban Drill / Deepen / Reopen No Violations On site for CND cementing. HL #1 14.75 inch TD at 152. CND set at 141 bed rock was at 120. 120 feet of Glacial drift at the location. CND was set open ended, R-3 new 32lb pipe. Cementing water pH was 7. Fresh water came from a local river. Operator broke circulation mixed cement until it returned to surface then displaced. 15 Bbl of good cement returned to surface. Cement held at surface. Job took 245 sacks of Class A 3% CaCl. Lease road was stable. Site was stable. Drainage controls were in place. Permit was posted in the dog house. Hand rails were up. Safety fence was up.
1288988078 2010-11-05 Urban Drill / Deepen / Reopen No Violations E-mail from Warren, rig moving in one week. Building site 11/9/2010. Pits 11/13/2010.
1290019410 2010-11-16 Urban Drill / Deepen / Reopen No Violations On site for BOP test. Pits are in good repair. Safety fence is up. Air body and BOP is in place and chained down. Operator ran drill collars into hole and circulated to clean hole. Operator charged BOP and closed it at 400psi. Operator charged hole to 180psi. 15 minute BOP test loss of 10psi. Released BOP. Operator had blow line and air buster hooked up. Bull plugs were on the choke line hook ups on the BOP. Operator had broken off the cement head at 9:45pm. Cement plug was down at 1:10pm earlier that day. Lease road was stable. Site was wet, area had received heavy rain during the day.
1290177856 2010-11-19 Urban Drill / Deepen / Reopen No Violations Driller this day was Eric Poulson. Drill depth was 2954, operator will be starching up at 3331. Pit liner at the ditch had slipped down, slip was above water level, requested that the liner be pulled up. Drainage controls were in place. Driller was drilling on fluid. Air body had a slight leak where it threads into the BOP. Eric informed me they need to re-thread air body. There was vibration at the air body do to the lose threads. Lease road was stable. Permit was in the dog house. Safety fence was up.
1291835162 2010-11-21 Urban Drill / Deepen / Reopen No Violations On site for surface cement. Pits were in good repair. Operator was running long string. Pipe was new R-3 11.6llb light service pipe. Operator set pipe at 3825. Hole was TD at 3836. Operator ran seven centralizers. Operator conditioned hole, ran 220 sacks of class A cement. Cement water pH was 7. Weight taken three times during cementing. Weights were 15.2, 14.8 and 15.0. Weights are within 5% of 15.6. Hole was drilled on fluid. Operator drilled from 3331 to TD on starch. Well was not logged due to issues with the Mandalfino # 1. Approval for open hole log was given by the DMRM. Job went well, good circulation during job.
1292255946 2010-11-29 Urban Drill / Deepen / Reopen No Violations On site for pit solidification. Operator had mixed two loads of cement fines into pits. Majority of the pits were firming up. North corner of the work pit was watery. Blow pit looked good. Operator was letting pits set and then was going to mix again and cover. It was agreed that pits need to be covered with subsoil and topsoil this day. Area was expecting an inch and a half of rain the next day. Lease road was stable. Location was stable.
1292344040 2010-12-14 Urban Drill / Deepen / Reopen No Violations On site for fracturing job. Annulus was open before, during and after the job. No flow noted from the annulus. Lease road was stable. Affected area of the well site was stable and snow covered. Operator broke perforations down, ran acid, 750gal HCL 15%. Pump pressure stayed below 2000psi during break down. Operator ran fracturing fluid, then ran sand and fluid. Total of 400 sacks of sand. Job went well, pressures and rates stayed constant, no spikes noted. Operator didnt ball off or wait on the acid, weather temperature 16 degrees, didnt want to risk any wait time do to equipment freezing. Operator ran a total of 65,000 gallons of fracturing fluid. Operator will swab Wednesday and flow back this week. Warren Schoenfelt from the company on site. Universal was the contractor this day. Hugh Palmer Excavation was on location.
1294946476 2011-01-13 UrbanProduction Wells No Violations Annulus was open. All valves were locked. Well site had two feet of snow on it. Tank battery has not been installed at this time. Permit sign was posted at the entrance of the site.
1307374722 2011-06-02 Production Wells No Violations Inspection due to water well complaint in the area. Well is in production. Annulus is open, zero psi on annulus. Man door was locked. Operator is actively reclaiming site. Weather conditions are now suitable for reclamation.
1310694023 2013-06-12 UrbanProduction Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve was open to a pop off valve. The well and tank battery are in good condition and are surrounded by a fence. The tank battery consists of two 200 BBL production tanks, two 100 BBL brine tanks, a 50 BBL poly brine tank, and two mechanical separators. The vents on the production tanks are plumbed into two 55 gallon charcoal filters and then up to spark arrestors. Neither the well or the tank battery has the identification sign on it. The lease road is in stable condition. The lease road and tank battery are being shared by permit number 2-2088.
1320720236 2012-03-30 UrbanProduction Wells No Violations My inspection found this well in good repair. The vegetation around the area affected by drilling is established and landscaping has been installed.
1430726049 2011-09-09 Preliminary Restoration No Violations Site has been graded, seeded and vegetation is established. Operator has not landscaped area at this time. The north end of the site is eroded and needs repaired. The operator was contacted on this issue. Weather conditions have been preventing completion of work.
1481918695 2016-11-28 UrbanProduction Wells No Violations I conducted an inspection on this well. The well is equipped with a plunger lift assembly and the valves on the wellhead were open. The last submitted production records for this well was in 2015. The well was fenced and locked. The tank battery consisted of four 100 BBL tanks, one 50 BBL poly brine tank, and two mechanical separators. The valves on the separators were open and the charts showed production. There were proper lids and hatches on the production tanks. Spark arrestors were installed on the productions tanks and a charcoal filter was plumbed into the vent stack. The tank battery was diked and fenced with a locked man door. The tank battery is shared with well 2-2088. Signage needs to be updated at the tank battery to reflect information on both wells and signage needs added to each well location. The lease access was stable. I contacted Mark Turpak of Cutter Exploration about updating and installing signage at the well and tank battery locations.
1496162398 2017-05-30 UrbanProduction Wells No Violations I conducted a reinspection on this well regarding installation of signage at the well site. The signage has been installed at the site and no violations were observed.
730901374 2010-11-15 0:00 UD No Violations

For data sources see[9]