X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-22130

Well Details

Well ID: 34-055-22130
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Burton Township
Operator Name: EQUITY OIL & GAS FUNDS INC
Well Pad ID:
Farm/Lease Name: M. DASCH
License Status: Producing
License Date: 2011-07-06
Spud Date: 2011-07-07
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2011-07-15
Well Total Depth: 4190.00 ft
Configuration: Vertical
Latitude: 41.440000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-05-11 Proposed Formations:CLINTON, Issued Date:5/11/2011, Expired Date:5/10/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2011-07-06 Proposed Formations:CLINTON, Issued Date:7/6/2011, Expired Date:7/5/2013 12:00:00 PM, Drilling unit acres:51, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-07-15
Completion Report Received 2012-03-12
Construction Permit Expires 2013-07-05
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-03-19 3953 4018 135
3953 4018 135
3953 4018 135

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-07-29 H2O 15 80156 Gal 40000 Producers Service Corporation Annulus was open. No circulation noted during treatment. Top of the cement was 3322'.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 EQUITY OIL & GAS FUNDS INC 1032.00 203.00 365
2014 EQUITY OIL & GAS FUNDS INC 1090.00 105.00 365
2015 EQUITY OIL & GAS FUNDS INC 1838.00 155.00 365
2016 EQUITY OIL & GAS FUNDS INC 2448.00 67.00 365
2017 EQUITY OIL & GAS FUNDS INC 2197.00 47.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 EQUITY OIL & GAS FUNDS INC Brine 164 365
2014 EQUITY OIL & GAS FUNDS INC Brine 139 365
2015 EQUITY OIL & GAS FUNDS INC Brine 156 365
2016 EQUITY OIL & GAS FUNDS INC Brine 51 365
2017 EQUITY OIL & GAS FUNDS INC Brine 31 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1395357081 2011-7-20 0:00: DD No Violations
-829087630 2011-12-12 0:00 PL No Violations
-923393172 2015-3-10 0:00: PW No Violations
0026868928 2011-07-14 Drill / Deepen / Reopen No Violations Operator is drilling on air and soap. Pits are in good repair and there is sufficient free board. H2S detector on site. Fire Extinguisher on the rig. BOP is in place. Air body is in place. Discharge line length is correct. Drill depth 3750.
0383929362 2013-12-17 Production Wells No Violations My inspection found the well to be equipped with a pump jack unit. The annulus valve is plumbed up and open. The well and tank battery are in good repair. The tank battery is surrounded by a chain link fence. The tank battery consists of a 210 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
0829087630 2011-12-12 Preliminary Restoration No Violations This well is equipped with a pumping unit. The well site has been seeded and vegetation is starting to become established. The annulus is plumbed into the tank battery. The tank battery is fenced with barbed wire and is equipped with one 210 barrel production tank, a poly brine tank and a mechincal separator. The lease road is stable and proper identification is posted. Well spacing is correct.
0923393172 2015-03-10 Production Wells No Violations My inspection found the well to be equipped with a pumpjack unit. The annulus valve is plumbed up and open. The well and tank battery are in good repair. The tank battery is surrounded by a chain link fence. The tank battery consists of a 210 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
0938882384 2011-07-09 Drill / Deepen / Reopen No Violations On site for CND cement job. Operator contacted during the night in regards to drilling conditions. Drill time for the Rat hole was 12 hours, 20 to 30 minutes a foot 2:30pm to 2:00am, was on site at 2:30pm until 4:00pm Operator had made 12 feet in that time first 12 feet . I instructed operator to contact me when they were at 26. Operator contacted me at 26 approval was given to set CND at current depth. It was agreed to keep drilling until cementers were on location. At the time of cementing operator was at 27. CND set at 27. Operator cut holes at the bottom of the CND to allow for circulation. Petroset Cement company on site. Operator broke circulation, mixed cement until it returned to surface then displaced. 60 sacks of class A cement used. Good cement returned to surface. Cement held at surface.
1012359048 2014-10-24 Production Wells No Violations My inspection found no change since my last inspection. No violations found.
1310150444 2011-07-09 Drill / Deepen / Reopen No Violations On site for pit construction. Permit has Special Permit Conditions, shallow till. Pits are approximately 10 feet in depth. Operator excavating to the top of the Sharon Conglomerate. Top of the sand stone is lose sand. Soil on the side of the pit is a clay, sand and gravel mix. Operator packed the bottom of the work pit with clay when eroded sand stone was encountered. No water noted during excavation. Pit liners are reinforced. Clay will be mixed into the blow pit before lining. Fresh water source is the stream on RT 168. West side of the site slopes to an intermittent stream, that flows north adjacent to the site. West side of the site is 3 feet of feel material the edge is loss fill. Contacted operator advised that drain controls need installed. Spoke to excavator operator, Company Wad Pol,) advised operator drain controls need installed along the west side of the site to prevent off site sedimentation.
1310380779 2011-07-11 Drill / Deepen / Reopen No Violations Operator contacted me during the weekend, lost circulation at the bottom of the Sharon Sandstone 102. Operator mixing mud and has lost circulation material enroot. On site for surface cement. Operator conditioned hole and had ran pipe. Petroset cement company on location. 100% extra cement to be ran, do to circulation problems during drilling. Drilling mud was 2 feet below surface, operator broke circulation, ran 200lbs of gel and one bag of cotton seed hauls ahead of the cement. Cement water pH was 7. Operator ran cement then switch over to displace. Cement returned to surface as soon as displacement started. 18 Bbl of good cement returned to surface. Once plug was down and operator shut down cement in the annulus fell back. I had the rig hands shovel remaining cement in the ditch into the annulus space. Requested that the operator tag cement and report depth of fall back. Corrective actions will need to be taken to fill annulus with cement. Total loss of fluid unknown at least 6 truck loads.
1310739995 2011-07-15 Drill / Deepen / Reopen No Violations On site for long string cement. Pits were in good repair. Site was in good repair. During surface cement, cement fell back after it returned to surface. Tagged cement, cement fell back 32 feet. Operator will need to grout. Requested that the driller protect the annulus during conditioning of hole for long string cement. Operator was unable to, annulus space filled with fluid. Did not have operator grout from the top after the long string. Operator will need to mix and grout at a slow rate to repair the surface cement. Operator conditioned hole for 45 minutes before cementing. Operator had conditioned the hole before tripping out the drill string also. Good circulation during conditioning. From the log; Sharon Sandstone top 15 bottom 120, Berea top 270 bottom 334 Lockport top 3486. Long string pipe was 11.6 lb R-3 used pipe. Operator broke circulation, mixed cement and ran cement down the long string. During cementing, a gas kick was taken at surface. Kick was circulated out during displacement. Hole was static after displacement. No breaks of circulation during cementing. Operator plugged rat hole with 20 sacks of Class A cement. Cement held at surface.
1311335418 2011-07-21 Drill / Deepen / Reopen No Violations Operator is grouting annulus from the surface. 9 Sacks of grout have been used, operator has left site to pick up additional supplies.
1323782572 2011-12-12 Preliminary Restoration No Violations The the drilling pits have been filled, the area affected from drilling has been reclaimed, erosion has been controlled and vegetation is established. The silt fence can be removed. This well is equipped with a pumping unit. The tank battery is equipped with one 210 barrel production tank, one poly brine tank and a mechincal separator. Proper identification needs to be posted. The lease road is stable.
1330620365 2012-03-01 Production Wells No Violations My inspection of site was due to water well complaint in the area. This well is equipped with a pumping unit. This well was recently serviced and the area around the well has been disturbed. The silt fence is up from drilling and drainage is controlled on site. The annulus is open and plumbed above grade. The well was in operation at the time of my inspection. The tank battery is equipped with one 210 barrel production tank, one 1500 gallon poly brine tank and a mechincal separator. The dike is in good repair. The lease road gate was open. The identification sign needs filled out. There are two holes, of unknown depth, along the last quarter section of the lease road. Water is flowing into these holes, which could possible be broken field tiles. I contacted the well owner in regards to the identification sign and possible tile repairs.
1395357081 2011-07-20 Drill / Deepen / Reopen No Violations Checked wellhead, no pressure gauges on the annulus. Annulus was open. Contacted the operator reminded the operator that the annulus pressure must be monitored before fracturing.
26868928 2011-7-14 0:00: DD No Violations
383929362 2013-12-17 0:00 PW No Violations
938882384 2011-7-9 0:00:0 DD No Violations

For data sources see[9]

References