If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22143 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.36,"lon":-81.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Troy Township | |
Operator Name: EXCALIBUR EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: LARKS | |
License Status: Producing | |
License Date: 2014-06-30 | |
Spud Date: 2014-08-23 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2014-08-27 | |
Well Total Depth: 4260.00 ft | |
Configuration: Vertical | |
Latitude: 41.360000 | |
Longitude: -81.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-06-21 | Proposed Formations:ORISKANY/CLINTON, Issued Date:6/21/2012, Expired Date:6/21/2014 12:00:00 PM, Drilling unit acres:288.25, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-06-30 | Proposed Formations:ORISKANY/CLINTON, Issued Date:6/30/2014, Expired Date:6/29/2016 12:00:00 PM, Drilling unit acres:288.25, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-08-27 | |
Completion Report Received | 2015-08-20 | |
Construction Permit Expires | 2016-06-29 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | EXCALIBUR EXPLORATION INC | 0.00 | 0.00 | 0 |
2015 | EXCALIBUR EXPLORATION INC | 5300.00 | 1273.00 | 334 |
2016 | EXCALIBUR EXPLORATION INC | 2484.00 | 822.00 | 365 |
2017 | EXCALIBUR EXPLORATION INC | 2193.00 | 284.00 | 365 |
2018 | EXCALIBUR EXPLORATION INC | 950.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | EXCALIBUR EXPLORATION INC | Brine | 325 | 0 |
2015 | EXCALIBUR EXPLORATION INC | Brine | 1170 | 334 |
2016 | EXCALIBUR EXPLORATION INC | Brine | 1635 | 365 |
2017 | EXCALIBUR EXPLORATION INC | Brine | 1015 | 365 |
2018 | EXCALIBUR EXPLORATION INC | Brine | 662 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1443902100 | 2018-9-24 0:00: | PW | No Violations | |
-665179937 | 2014-9-17 0:00: | PL | No Violations | |
-770365110 | 2014-8-25 0:00: | DD | No Violations | |
0099351821 | 2014-08-23 | Casing String Witnessed | No Violations | I was on location for the cementing of the 8 5/8 surface casing. The hole was drilled to 400. The casing was set to 382. The landing joint was set to 362. Petroset was the cement company on location. Petroset broke circulation and ran 175 sacks of Class A cement that mudscaled at 15.6 ppg. The plug was released and displaced using 23 bbls of water. The plug landed and was pressured up on for five minutes. The amount of cement returns was 13 bbls. The location is in stable condition. The lease road is stoned back to where the tank battery will be located. The road from the end of the stone to the well site is approximately 200 and is in stable condition. The pits are stable and the liner is in good repair. The top soil is piled at the South side of the location. The cellar is constructed of a 46 plastic pipe. No violations found. |
0665179937 | 2014-09-17 | Preliminary Restoration | No Violations | My inspection found the well has a guage and pop off valve on the annulus. The guage reads zero psi. The pits are open and in stable condition. The pit liners are in good repair. There is four 500 BBL tanks on location for the company to hydraulic fracture the well on Friday. Hagans Well Service is setting up the service rig on location. The location is in stable condition. No violations found. |
0770365110 | 2014-08-25 | Drill / Deepen / Reopen | No Violations | My inspection found Poulson Drilling to have reached 2400. The company reported no issue while drilling the previous 2400. The site is in stable condition. The pit liners are in good repair. No violations found. |
1103209312 | 2014-08-26 | Drill / Deepen / Reopen | No Violations | My inspection today found Poulson Drilling to have reached 3492. The company has no issues to report while drilling the previous 3492. The location is in stable condition and the pits are in good repair. No violations found. |
1358766347 | 2015-05-04 | Preliminary Restoration | No Violations | My inspection found the well in production. There is still two piles of soil at the south end of the location. The tank battery is in good repair and the lease road is in stable condition. I spoke with Ron the excavator for Excalibur about spreading the soil and getting the soil seeded and strawed. He will complete the restoration within the next couple of weeks. Once vegetation is established preliminary restoration can be passed. |
1408976060 | 2014-08-23 | Drill / Deepen / Reopen | No Violations | I received a call from Roy Poulson from PDC Drilling that they had spudded the well at 8:30 AM on 8/23/2014. |
1438187523 | 2015-07-29 | Preliminary Restoration | No Violations | My inspection found the company has repaired a field drain tile that was damaged during excavation of the location. The clay pile and the top soil pile has been spread out on location. The company has to prep the soil, then seed and straw can be applied. Once vegetation is established preliminary restoration can be passed. |
1443719932 | 2015-10-01 | Preliminary Restoration | No Violations | My inspection found vegetation has been established on the location. The well is currently in production. The lease road is in stable condition. No violations found. Preliminary restoration can be passed. |
1443902100 | 2018-09-24 | Production Wells | No Violations | I conducted an inspection on this well. During this inspection, the well was equipped with a pumping unit and in production. The tank battery consisted of one 210 BBL tank, one 100 BBL tank and a mechanical separator. The tank battery was diked. Legible identification was located at the well and tank battery. The lease access was stable. |
1532350322 | 2014-11-18 | Production Wells | No Violations | My inspection found the well to be equpped with a pumpjack. The well is currently being produced. The tank battery has been completed and consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. There is top soil piled on the West side of the location. In the spring the topsoil needs spread and vegetation needs established. Once that is complete preliminary restoration can be passed. |
99351821 | 2014-8-23 0:00: | CS | No Violations |
For data sources see[7]