34-055-22145

Well Details

Well ID: 34-055-22145
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Troy Township
Operator Name: EXCALIBUR EXPLORATION INC
Well Pad ID:
Farm/Lease Name: NYZEN
License Status: Producing
License Date: 2012-08-16
Spud Date: 2012-09-27
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2012-10-02
Well Total Depth: 4270.00 ft
Configuration: Vertical
Latitude: 41.350000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-16 Proposed Formations:ORISKANY, CLINTON, Issued Date:8/16/2012, Expired Date:8/16/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-10-02
Completion Report Received 2012-11-05
Construction Permit Expires 2014-08-16
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-12-07 4101 4186 55
4101 4186 55
4101 4186 55

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-10-12 H2O 15 2129 Bbl 50000 Superior Well Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 EXCALIBUR EXPLORATION INC 0.00 0.00 0
2013 EXCALIBUR EXPLORATION INC 5614.00 1115.00 245
2014 EXCALIBUR EXPLORATION INC 7395.00 1227.00 365
2015 EXCALIBUR EXPLORATION INC 5529.00 871.00 365
2016 EXCALIBUR EXPLORATION INC 5487.00 730.00 365
2017 EXCALIBUR EXPLORATION INC 5349.00 528.00 365
2018 EXCALIBUR EXPLORATION INC 5496.00 565.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 EXCALIBUR EXPLORATION INC Brine 0 0
2013 EXCALIBUR EXPLORATION INC Brine 1112 245
2014 EXCALIBUR EXPLORATION INC Brine 696 365
2015 EXCALIBUR EXPLORATION INC Brine 483 365
2016 EXCALIBUR EXPLORATION INC Brine 363 365
2017 EXCALIBUR EXPLORATION INC Brine 471 365
2018 EXCALIBUR EXPLORATION INC Brine 333 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1510875033 2012-10-22 0:00 PL No Violations
-944563058 2018-9-24 0:00: PW No Violations
0944563058 2018-09-24 Production Wells No Violations I conducted an inspection on this well. During this inspection, the well was equipped with a pumping unit and in production. The tank battery consisted of one 210 BBL tank, one 100 BBL tank and a mechanical separator. Valves on the separator were open. The tank battery was diked. Legible identification was located at the well and tank battery. The lease access was stable.
1182241210 2014-08-14 Production Wells No Violations My inspection found no changes since my last inspection. No violations found.
1238089198 2013-05-20 Production Wells No Violations My inspection found the well to be equipped with a pump jack. The annulus was plumbed up into a pop off valve and a guage that read 5 psi. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification sign is located on the tank battery and the pump jack. The lease road is in stable condition. The site has been recently graded and seeded. The grass seed has not sprouted yet.
1374753731 2013-07-25 Preliminary Restoration No Violations My inspection found the location has been graded, seeded, and vegetation has been established. Preliminary Restoration is passed.
1510875033 2012-10-22 Preliminary Restoration No Violations The well site has yet to be graded. The pits are still in place and filled with cuttings and drilling fluid. Elements of the tank battery (e.g., production tank, brine tank, and mechanical separator) have been staged near the lease road entrance. Subcontractors are on site working on the tank battery site. Another crew is also here with a service rig running production tubing.

For data sources see[9]