If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24082 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-81.61,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Jackson Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: GARDINSKY J | |
License Status: Producing | |
License Date: 2008-06-04 | |
Spud Date: 2008-07-14 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2008-07-19 | |
Well Total Depth: 5171.00 ft | |
Configuration: Vertical | |
Latitude: 39.980000 | |
Longitude: -81.610000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-06-04 | Proposed Formations:CLINTON/MEDINA, Issued Date:6/4/2008, Expired Date:6/4/2009 6:00:00 AM, Drilling unit acres:43.2, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-07-19 | |
Completion Report Received | 2008-11-05 | |
Construction Permit Expires | 2009-06-04 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-11 | 4970 | 5038 | 85 |
4970 | 5038 | 85 | |
4970 | 5038 | 85 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 80780 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DAVID R HILL INC | 738.00 | 69.00 | 51 |
2009 | DAVID R HILL INC | 5207.00 | 361.00 | 365 |
2010 | DAVID R HILL INC | 3089.00 | 109.00 | 365 |
2011 | DAVID R HILL INC | 2356.00 | 100.00 | 365 |
2012 | DAVID R HILL INC | 2134.00 | 77.00 | 366 |
2013 | DAVID R HILL INC | 1707.00 | 91.00 | 365 |
2014 | DAVID R HILL INC | 992.00 | 77.00 | 365 |
2015 | DAVID R HILL INC | 1316.00 | 41.00 | 365 |
2016 | DAVID R HILL INC | 663.00 | 0.00 | 365 |
2017 | DAVID R HILL INC | 627.00 | 0.00 | 365 |
2018 | DAVID R HILL INC | 273.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DAVID R HILL INC | Brine | 145 | 51 |
2009 | DAVID R HILL INC | Brine | 405 | 365 |
2010 | DAVID R HILL INC | Brine | 165 | 365 |
2011 | DAVID R HILL INC | Brine | 77 | 365 |
2012 | DAVID R HILL INC | Brine | 98 | 366 |
2013 | DAVID R HILL INC | Brine | 122 | 365 |
2014 | DAVID R HILL INC | Brine | 115 | 365 |
2015 | DAVID R HILL INC | Brine | 55 | 365 |
2016 | DAVID R HILL INC | Brine | 0 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1460042133 | 2009-9-23 0:00: | PL | No Violations | |
0984412920 | 2008-07-15 | Drill / Deepen / Reopen | No Violations | KILBARGER DRILLING. DRILLING SURFACE HOLE AT 1000 |
1216126410 | 2008-07-14 | Drill / Deepen / Reopen | No Violations | KILBARGER DRILL AND SET CONDUCTOR |
1355524275 | 2009-01-08 | Production Wells | No Violations | WELL IS IN LINE. PRELIMENARY RESTORATION NEEDED ON THIS WELL. WILL WAIT UNTIL WEATHER BREAKS TO LOOK AT RESTORATION ON THIS ONE. |
1356060175 | 2008-07-28 | Drill / Deepen / Reopen | No Violations | FINISH MT AND CLOSE PIT. ROUGH IN LOCATION. |
1387818824 | 2013-12-23 | Production Wells | No Violations | On the day of my inspection, I reviewed The Division of Oil and Gas production records and found for the years of 2011 and 2012 to be current, the well is equipped with a pumping unit and tubing and rods, the valve is open at the well, there a separator / chart recorder / (1) fifty barrel poly brine tank and (1) one hundred barrel production tank setting inside a containment dike, the I.D. is posted on the tank. |
1460042133 | 2009-09-23 | Preliminary Restoration | No Violations | Restoration work at site is satisfactory,well is equipped with pumping unit and tubing and rods and 1-100 bbl tank and 1-50 bbl tank&seperator located within dike area. |
1522425437 | 2018-03-30 | Production Wells | No Violations | On the day of my inspection, I witnessed production equipment included 100 barrel tank, a 35 barrel plastic tank, vertical separator, and a chart recorder equipped with a 2 inch by .250 inch orifice plate all within earthen dike. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, rods, and a pumping unit ran with a natural gas engine. All valves were opened on the tubing and the only valve on casing was opened. The proper identification was in place and production report was up to date. |
984412920 | 2008-7-15 0:00: | DD | No Violations |
For data sources see[9]