If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24098 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40,"lon":-81.38,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Guernsey | |
| Municipality: Wills Township | |
| Operator Name: DAVID R HILL INC | |
| Well Pad ID: | |
| Farm/Lease Name: NEFF/COWART | |
| License Status: Producing | |
| License Date: 2010-01-21 | |
| Spud Date: 2010-02-02 | |
| Spud Drilling Contractor: BOWMAN DRILLING | |
| Final Drill Date: 2010-02-12 | |
| Well Total Depth: 4010.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.000000 | |
| Longitude: -81.380000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-09-29 | Proposed Formations:CLINTON/MEDINA, Issued Date:9/29/2008, Expired Date:9/29/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| APP | 2010-01-21 | Proposed Formations:SQUAW THRU OHIO SHALE, Issued Date:1/21/2010, Expired Date:1/21/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ENPW |
| Reached Total Depth | 2010-02-12 | |
| Completion Report Received | 2010-11-22 | |
| Construction Permit Expires | 2011-01-21 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 630000 Gal | 120000 |
For data sources see[3]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | DAVID R HILL INC | 6061.00 | 0.00 | 176 |
| 2011 | DAVID R HILL INC | 10700.00 | 75.00 | 365 |
| 2012 | DAVID R HILL INC | 7582.00 | 88.00 | 366 |
| 2013 | DAVID R HILL INC | 5706.00 | 82.00 | 365 |
| 2014 | DAVID R HILL INC | 4686.00 | 0.00 | 365 |
| 2015 | DAVID R HILL INC | 3814.00 | 63.00 | 365 |
| 2016 | DAVID R HILL INC | 3108.00 | 0.00 | 365 |
| 2017 | DAVID R HILL INC | 3782.00 | 0.00 | 365 |
| 2018 | DAVID R HILL INC | 4328.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | DAVID R HILL INC | Brine | 430 | 176 |
| 2011 | DAVID R HILL INC | Brine | 1063 | 365 |
| 2012 | DAVID R HILL INC | Brine | 228 | 366 |
| 2013 | DAVID R HILL INC | Brine | 114 | 365 |
| 2014 | DAVID R HILL INC | Brine | 82 | 365 |
| 2015 | DAVID R HILL INC | Brine | 75 | 365 |
| 2016 | DAVID R HILL INC | Brine | 0 | 365 |
| 2017 | DAVID R HILL INC | Brine | 0 | 365 |
| 2018 | DAVID R HILL INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1112105775 | 2013-6-24 0:00: | PL | No Violations | 1.00 |
| -1479794908 | 2020-4-24 0:00: | PW | No Violations | 1.00 |
| -1634672562 | 2010-2-1 0:00:0 | DD | No Violations | |
| -1738226356 | 2020-2-14 0:00: | PW | No Violations | 0.50 |
| -441931746 | 2010-2-4 0:00:0 | DD | No Violations | |
| -966863659 | 2018-5-3 0:00:0 | PW | No Violations | 0.50 |
| 0169997489 | 2019-04-30 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with 8.625-inch diameter surface casing with a casing head, 4.5-inch diameter production casing with a tubing head, 2.375-inch diameter tubing, rods, and a pumping unit. Production valves were in the open position. A gauge present on the tubing read 120 pounds per square inch. The production equipment consisted of one 210-barrel tank, one 30-barrel poly tank, one drip, one vertical separator, and one sales meter. The sales meter had a 2-inch diameter sales line, .375-inch orifice plate, and chart recorder with current chart. All equipment was within an earthen dike. The identification was located on the 210-barrel tank and the production records were current. |
| 0301978325 | 2015-07-17 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 210bbl tank, a 30bbl polymer brine tank, a vertical separator, a drip, a 2 inch sales meter with a .375 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and pumping unit powered by electricity with valves in the open position. Identification was present and production records were current. |
| 0441931746 | 2010-02-04 | Drill / Deepen / Reopen | No Violations | On site to witness testing of Blowout Preventer, rig crew pressured up on annulas of drill string after closing blowout preventer to400 psi and I monitored pressure for 15 min with no decline in pressure Test Passed. |
| 0873507816 | 2016-07-25 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 210 barrel tank, a 30 barrel polymer brine tank, a vertical separator, a drip, a 2 inch sales meter with a .375 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a Churchill pumping unit powered by electricity with valves in the open position. Identification was present and production records were current. |
| 0966863659 | 2018-05-03 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with 8.625 inch diameter surface casing with a casing head, 4.5 inch diameter production casing with a tubing head, 2.375 inch diameter tubing, rods, and a pumping unit. Production valves were in the open position. A gauge present on the tubing read 150 pounds per square inch. The production equipment consisted of one 210 barrel tank, one 30 barrel poly tank, one drip, one vertical separator, and one sales meter. The sales meter had a 2 inch diameter sales line, .375 inch orifice plate, and chart recorder with current chart. All equipment was within an earthen dike. The identification was located on the 210 barrel tank and the production records were current. |
| 1112105775 | 2013-06-24 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
| 1258743667 | 2009-11-20 | Not Drilled | No Violations | Permit expired 9/29/09 Well not drilled as of this date. |
| 1265232710 | 2010-02-03 | Drill / Deepen / Reopen | No Violations | |
| 1266617439 | 2010-02-19 | Drill / Deepen / Reopen | No Violations | Total depth of well 4010 -3937 of 4.5 ran and packer set at 2290 slotted casing below packer and casing was cemented in place with 110 sacks of Class A cement. |
| 1343751945 | 2012-07-31 | Production Wells | No Violations | On the day of my inspection I found the well to capable of production, there is a pump unit at the well site, the chart shows current production, there is a separator/ drip/ chart/ brine tank/ (1) two hundred ten barrel production tank setting inside a containment dike with the I.D. posted. |
| 1573987625 | 2017-03-08 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 210 barrel tank, a 30 barrel polymer brine tank, a vertical separator, a drip, a 2 inch salesmeter with a .375 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing, rods and a Churchill pumping unit powered by electricity with valves in the open position. Identification was present and production records were current. |
| 1634672562 | 2010-02-01 | Drill / Deepen / Reopen | No Violations | Stopped by drill site to check on status of rig and check on drilling pit construction,operetor stated they would spud well tomorrow and likely set 7 on Wednesday. |
| 169997489 | 2019-4-30 0:00: | PW | No Violations | 0.30 |
| 1849369003 | 2019-10-17 0:00 | PW | No Violations | 0.50 |
| 301978325 | 2015-7-17 0:00: | PW | No Violations | 1.00 |
| 873507816 | 2016-7-25 0:00: | PW | No Violations | 0.50 |
For data sources see[8]