If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24211 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: UTICA RESOURCE OPERATING LLC | |
Well Pad ID: US-OH-000596 | |
Farm/Lease Name: ONEGA COMMISSIONERS | |
License Status: Plugged Back | |
License Date: 2012-05-17 | |
Spud Date: 2012-05-31 | |
Spud Drilling Contractor: EXPRESS ENERGY SERVICES | |
Final Drill Date: 2012-07-13 | |
Well Total Depth: 11340.00 ft | |
Configuration: Vertical | |
Latitude: 39.990000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Completion Report Received | 2012-03-07 | |
APP | 2012-05-17 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/17/2012, Expired Date:5/17/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2012-07-13 | |
Plugged Back | 2012-07-14 | |
End of Confidential Data | 2013-07-13 | |
Construction Permit Expires | 2014-05-17 | |
Change of Owner | 2018-05-04 | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC |
Record Last Modified | 2018-05-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-01-10 | 8309 | 8641 | 40 |
2013-01-10 | 11000 | 11250 | 35 |
2013-01-10 | 9503 | 9780 | 41 |
2013-01-14 | 9781 | 10029 | 40 |
2013-01-10 | 10029 | 10313 | 40 |
2013-01-10 | 8641 | 8949 | 39 |
11000 | 11250 | 35 | |
10645 | 11000 | 39 | |
10313 | 10645 | 40 | |
10029 | 10313 | 40 | |
9503 | 9780 | 41 | |
9204 | 9503 | 41 | |
8949 | 9204 | 40 | |
8641 | 8949 | 39 | |
8309 | 8641 | 40 | |
8029 | 8309 | 40 | |
7750 | 8029 | 38 | |
7474 | 7750 | 39 | |
9781 | 10029 | 40 | |
7474 | 7750 | 39 | |
2013-01-10 | 8949 | 9204 | 40 |
2013-01-10 | 7474 | 7750 | 39 |
2013-01-10 | 7750 | 8029 | 38 |
2013-01-10 | 8029 | 8309 | 40 |
2013-01-10 | 9204 | 9503 | 41 |
2013-01-10 | 10313 | 10645 | 40 |
2013-01-10 | 10645 | 11000 | 39 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/14/2012 | 09/14/2012 | 6237 | 93402 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Iron Stabilizer L58 | Schlumberger | Iron Control | Sodium Erythorbate | 6381-77-7 | 100 | 0.074945 | 0 |
15% HCL Acid | Schlumberger | Solvent | Hydrochloric Acid | 7647-01-1 | 30 | 4.49669 | 0 | |
Friction Reducer J609 | Schlumberger | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | 0.453845 | 0 | |
Surfactant F112 | Schlumberger | Surfactant | Polyethylene Glycol Monohexyl Ether | 31726-34-8 | 13 | 0.242457 | 0 | |
Corrosion Inhibitor A264 | Schlumberger | Corrosion Inhibitor | Aliphatic Alcohols, Ethoxylated #1 | Proprietary | 30 | 0.004497 | 0 | |
Methanol | 67-56-1 | 40 | 0.0059956 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.001499 | 0 | ||||
Aliphatic Acids | Proprietary | 30 | 0.004497 | 0 | ||||
Breaker J218 | Schlumberger | Breaker | Diammonium Peroxidisulphate | 7727-54-0 | 100 | 3.05133 | 0 | |
Water Gelling Agent | Schlumberger | Gelling Agent | Carbohydrate Polymer | Proprietary | 100 | 55.0663 | 0 | |
30/50 Mesh Sand | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 100 | 5,188,860.0 | |
100 Mesh Sand | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 45.5022 | 531205 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | PDC ENERGY INC | Brine | 1758 | 4 |
2013 | PDC ENERGY INC | Brine | 4184 | 132 |
2014 | PDC ENERGY INC | Brine | 5993 | 312 |
2015 | PDC ENERGY INC | Brine | 844 | 358 |
2016 | PDC ENERGY INC | Brine | 587 | 366 |
2017 | PDC ENERGY INC | Brine | 426 | 365 |
2018 | UTICA RESOURCE OPERATING LLC | Brine | 425 | 272 |
2019 | UTICA RESOURCE OPERATING LLC | Brine | 204 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1497226105 | 2020-8-25 0:00: | PW | No Violations | 1.00 |
-293411117 | 2015-7-16 0:00: | PW | No Violations | 0.50 |
-344866670 | 2018-10-24 0:00 | PW | No Violations | 0.20 |
-658627454 | 2014-7-15 0:00: | PL | No Violations | 0.80 |
-712447130 | 2017-6-29 0:00: | PW | No Violations | 0.50 |
0055562942 | 2015-05-07 | Production Wells | No Violations | I received a call from PDC EHS Supervisor Tony Long stating that while they were on a site inspection they found an area of stressed vegetation along their access road and they were planning to remediate on Monday. Upon arrival I witnessed an area 30 feet by 60 feet area of vegetation that was stressed. I placed a call to Tony Long stating that they needed to begin sooner on remediation and he agreed. Tony stated that they would remove all contaminated vegetation and take confirmatory samples and provide the results to ODNR before replacing any soil. |
0269964060 | 2013-06-26 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
0293411117 | 2015-07-16 | Production Wells | No Violations | On the day of my inspection I witnessed that production equipment included 8-400bbl tanks shared with the 2H and 3H all within containment, a line heaters, a compressor unit, a vapor recovery system and a gas combustor. The well was equipped with Cameron casing and tubing wellheads and plunger lift systems with valves in the open position. Production records were current and well identification was present |
0344866670 | 2018-10-24 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor. |
0601702390 | 2019-02-19 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present with gauges reading zero pounds per square inch. The production equipment consisted of eight 400-barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor. Identification was location at entry and the at the wellhead. |
0658627454 | 2014-07-15 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that production equipment included 8-400bbl storage tanks, 3-line heaters, a compressor unit and 3-separators. The well was equipped with Cameron casing and tubing wellheads and along with a Christmas tree valve assembly. Production records are current, well identification was present and the site passed preliminary restoration according ORC 1509.072A. |
0712447130 | 2017-06-29 | Production Wells | No Violations | On the day of my inspection I witnessed that production equipment included 8-400 barrel tanks shared with the 2H and 3H all within containment, a compressor unit, a vapor recovery tower and a gas combustor. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 465 pounds per square inch on the tubing and 485 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. Repair of slip on the west side of the well pad is complete with seed and mulch being applied. |
1102421590 | 2015-05-11 | Production Wells | No Violations | On the day of my inspection I witnessed that removal of stressed vegetation was completed with erosion control measures in place and waiting on final lab analysis with results being submitted to ODNR. |
1314438854 | 2017-02-17 | Production Wells | No Violations | On the day of my inspection I witnessed that production equipment included 8-400 barrel tanks shared with the 2H and 3H all within containment, a compressor unit, a vapor recovery tower and a gas combustor. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 445 pounds per square inch on the tubing and 515 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
1341334360 | 2012-06-29 | Drill / Deepen / Reopen | No Violations | Stopped by drilling rig for update they were drilling surface hole @981. |
1342037135 | 2011-07-10 | Drill / Deepen / Reopen | No Violations | On site to witness testing of BOP we tested annular at 1500# and blind ram at 3000# and pipe rams at 3000# also and choke system at 2500# and we also pressured tested casing at 1500# with no decline in pressure all test passed at this point in well drilling operation. |
1342645489 | 2012-07-18 | Drill / Deepen / Reopen | No Violations | Stopped by drilling rig for update they were drilling lateral section of well at 7070, and walked parameter of site to check for any potential problems none were found site looked good . |
1354660198 | 2012-12-03 | Completion Testing | No Violations | Stopped by site for update on flowback process and to witness setting of production facility storage tanks. |
1526992320 | 2018-05-22 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Gauges were present reading 440 pounds per square inch on the tubing, 480 pounds per square inch on the production casing, 0 pounds per square inch on the 13.375 inch diameter intermediate, and 0 pounds per square inch on the 9.625 inch diameter second intermediate casing. The production equipment consisted of eight 400 barrel tanks, three vapor recovery towers, three gas production units, a vapor recovery system skid, one vent scrubber, and one combustor. |
1851520568 | 2015-05-28 | Production Wells | No Violations | On the day of my inspection following up on the stressed vegetation along access road, I witnessed that remediation was completed with seeding and straw in place. Soil that was removed has been taken to the appropriate landfill and confirmatory test results will be sent to ODNR tomorrow. |
1875364218 | 2020-3-19 0:00: | PW | No Violations | 1.00 |
269964060 | 2013-6-26 0:00: | PL | No Violations | 1.00 |
55562942 | 2015-5-7 0:00:0 | PW | No Violations | 2.50 |
601702390 | 2019-2-19 0:00: | PW | No Violations | 0.20 |
For data sources see[7]