X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24219

Well Details

Well ID: 34-059-24219
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Center Township
Operator Name: DEVON ENERGY PRODUCTION CO LP
Well Pad ID: US-OH-000611
Farm/Lease Name: THE CHUMNEY FAMILY TRUST
License Status: Plugged Back
License Date: 2012-06-22
Spud Date: 2012-08-03
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-10-07
Well Total Depth: 7350.00 ft
Configuration: Vertical
Latitude: 40.010000
Longitude: -81.460000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-22 Proposed Formations: BLACK RIVER, Issued Date:6/22/2012, Expired Date:6/22/2014 12:00:00 PM, Drilling unit acres:322.95, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-10-07
Plugged Back 2012-10-09
End of Confidential Data 2013-10-07
Construction Permit Expires 2014-06-22
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-02-28 8440 8651 0
2013-02-28 11230 11432 0
2013-02-28 9680 9891 0
2013-02-28 9990 10201 0
2013-02-28 10300 10511 0
2013-02-28 8752 8956 0
11230 11432 0
10920 11131 0
10610 10821 0
10300 10511 0
9990 10201 0
9680 9891 0
9370 9581 0
9060 9271 0
8752 8956 0
8440 8651 0
8125 8337 0
7820 8026 0
7510 7511 0
7510 7511 0
2013-02-28 9060 9271 0
2013-02-28 7510 7511 0
2013-02-28 7820 8026 0
2013-02-28 8125 8337 0
2013-02-28 9370 9581 0
2013-02-28 10610 10821 0
2013-02-28 10920 11131 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/08/2012 11/08/2012 7086.00 2,958,023.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Operator 100.00 86.59
SURFACTANT
OptiKleen-WF Halliburton Energy Services Concentrate Sodium perborate tetrahydrate 10486-00-7
LOSURF-300 NONIONIC SURFACTANT Halliburton Energy Services Surfactant Isopropanol 67-63-0 60.00 0.04
WG-36 GELLING AGENT Halliburton Energy Services Gelling Agent Guar gum 9000-30-0
Sand Premium Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 9.96
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00230000
BE-9 Biocide Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00378000
WHITE Halliburton Energy Services Proppant
SSA-2 Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 1.54
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Propargyl alcohol 107-19-7
Methanol 67-56-1
FE ACID - 10 HCL Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 1.63
( by mass)** ( by mass)**
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
CLA-Web Halliburton Energy Services Scale Inhibitor 100.00 0.00
GBW-30 BREAKER Halliburton Energy Services Breaker Carbohydrates
Hemicellulase enzyme 9012-54-8
SURFACTANT Halliburton Energy Services Surfactant Ethoxylated nonylphenol
Solvent naphtha, petroleum, light arom 64742-95-6

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 DEVON ENERGY PRODUCTION CO LP 0 0 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 DEVON ENERGY PRODUCTION CO LP Brine 0 23
2013 DEVON ENERGY PRODUCTION CO LP Brine 0 0
2014 DEVON ENERGY PRODUCTION CO LP Brine 0 0
2017 GEOPETRO LLC Brine 0 37
2018 GEOPETRO LLC Brine 220 178
2019 GEOPETRO LLC Brine 0 35

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1063289078 2012-8-13 0:00: DD No Violations
-1203018121 2017-7-19 0:00: PW No Violations 2.00
-145460619 2019-7-22 0:00: PW No Violations 1.00
-1546759323 2017-12-7 0:00: PW No Violations 1.00
-1607980431 2018-3-8 0:00:0 PW No Violations 0.70
-1668945642 2014-1-9 0:00:0 PL No Violations 0.40
-1867334320 2012-10-9 0:00: PB No Violations
-28453882 2017-8-1 0:00:0 PW No Violations 1.00
-399901332 2016-1-4 0:00:0 PW No Violations 2.00
-407870527 2016-2-2 0:00:0 PW No Violations 1.50
-439811576 2020-6-3 0:00:0 PW No Violations 1.00
-53997861 2020-2-11 0:00: PW No Violations 0.50
-634716425 2017-8-15 0:00: PW No Violations 1.00
-978483319 2014-1-9 0:00:0 PL No Violations 0.30
-983339268 2019-7-22 0:00: PW No Violations 0.50
0028453882 2017-08-01 Production Wells No Violations On the day of my inspection I Energy Services Corporation was onsite with tank dike constructed and being lined with 4 inches of gravel to be placed in the bottom. 4-400 barrel tanks will be arriving from Pennsylvania for placement later this week.
0133303075 2019-03-04 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The production equipment consisted of one high-low separator, four 400-barrel tanks, one flare, and on sales meter. The sales meter had a 2-inch diameter sales line, 1-inch orifice plate, and a chart recorder. Production records were current and identification was present.
0325188242 2017-03-08 Production Wells No Violations Accompanied Guernsey County Inspector Doug Bennett, Reference his Report for further details
0334973743 2015-01-22 Production Wells No Violations
0399901332 2016-01-04 Production Wells Violations Noted

-9-05 (A)(1). Owner/operator shall remove oil residue, dispose of properly and replace with clean stone in accordance with ORC 1501:9-1-07.

0407870527 2016-02-02 Production Wells No Violations On the day of my inspection following up on Compliance Notice-399901332, I witnessed that ROC Service company had removed contamination and remediation was completed resolving compliance notice.
0413283786 2017-03-13 Production Wells No Violations On the day of my inspection I witnessed there was no change in the status of the well since the last inspection on February 2, 2016. The well was equipped GE Oil & Gas casing and production wellheads with valves in the closed position. No production equipment or flowline was present at the time of inspection. Location and wellhead were fenced, gated and locked with proper identification present at the entry and at the wellhead.
0634716425 2017-08-15 Production Wells No Violations On the day of my inspection I witnessed Energy Services Corporation was onsite completing tank installation. 4-400 barrel tanks have been set within a lined earthen dike. The tubing valve assembly has been removed in preparation of a plunger lift system.
0657882819 2016-01-28 Production Wells No Violations On the day of my inspection following up on Compliance Notice-399901332, I witnessed that no action has been taken to address the oil residue. I placed call to Ron Romanetti of ROC Service Company and he stated that they would be there on Monday to remediate and would notify upon completion.
0978483319 2014-01-09 Preliminary Restoration No Violations The site passed preliminary restoration according to 1509.072A.
1063289078 2012-08-13 Drill / Deepen / Reopen No Violations Received call from local office of possible complaint of sediment had overrun silt fence and had entered adjacent property inspected site and found work crew correcting problems with faulty silt fence and applying seed and mulch to edges of drill pad to help prevent any further problems with erosion.
1099288609 2012-09-19 Drill / Deepen / Reopen No Violations Inspection revealed that driller was drilling on fluid at 1175 and they should TD surface hole this evening and possibly be ready to cement it in place in the morning.
1203018121 2017-07-19 Production Wells No Violations On the day of my inspection I met with Geopetro LLC Field Representative Eric Brown to discuss their plans to get the well online. Geopetro plans to construct a lined dike for 4-400 barrel tanks along with a -low gas production unit and a flare. They are in talks with Mark West and Columbia Gas for possible gas sales. Additional equipment a NGL bullet tank and chiller unit would have to be set if sales would go to Columbia Gas. A discussion was held on flaring gas for oil production until the pipeline would be installed. Gauge present read 2850 pounds per square inch on the casing. Mr. Brown will be installing gauges to monitor the annulus and updated well identification to comply with OAC 1501:9-9-05 (A) (10).
1297455121 2017-10-06 Production Wells No Violations On the day of my inspection I witnessed Energy Services Corporation was onsite pressure testing flowlines. The plunger lift system, GP unit and flare are all in place with plans to test well tentatively beginning Monday 10/9/17.
133303075 2019-3-4 0:00:0 PW No Violations 1.00
1453306411 2016-01-20 Production Wells No Violations On the day of my inspection following up on Compliance Notice-399901332, I witnessed a plug has been installed in the casing valve securing the wellhead with no action as of date addressing the oil residue.
1546759323 2017-12-07 Production Wells No Violations On the day of my inspection I witnessed the well was not in operation and was equipped with a plunger lift system with valves in the open position. Gauges present read 2700 pounds per square inch on the casing and 2000 pounds per square inch on the tubing with annular monitoring present. The production equipment included 4-400 barrel tanks within a lined earthen dike, a GP unit, 2 inch meter run with a 1.25 inch orifice and a chart recorder and flare. Eric Brown of Geopetro LLC is still trying to work out a pipeline agreement with Mark West.
1574312883 2017-06-29 Production Wells No Violations On the day of my inspection I witnessed that the well was transferred to Geopetro LLC on June 22, 2017 with no other change in the status of the well since the last inspection on March 13, 2017. The well was equipped GE Oil & Gas casing and production wellheads with valves in the closed position. No production equipment or flowline was present at the time of inspection. Location and wellhead were fenced, gated and locked with proper identification present at the entry and at the wellhead.
1607002328 2020-2-11 0:00: PW No Violations 0.60
1607980431 2018-03-08 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Ryan Armstrong, I witnessed the well was in operation producing and flaring. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 1900 pounds per square inch on the casing and 1400 pounds per square inch on the tubing with annular monitoring present. The production equipment included 4-400 barrel tanks within a lined earthen dike, a GP unit, a 2 inch meter run with a 1 inch orifice and a chart recorder and flare.
1668945642 2014-01-09 Preliminary Restoration No Violations The site passed preliminary restoration according to 1509.072A.
1867334320 2012-10-09 Plug / Plug Back No Violations On site to witness plugging back of said well they drilled to a total depth of 7350 and logged well and then they ran drill string back into well to set 1200 cement plug, once cement is set up they will go back into well and then proceed to drill horizontal.
1893208365 2019-10-9 0:00: PW No Violations 0.30
2016132488 2012-10-21 Drill / Deepen / Reopen No Violations Total depth@11,538 operator ran 11,538 of 5.5 casing and two stage cementing tool@5550 and Halliburton cemented casing in place.
325188242 2017-3-8 0:00:0 PW No Violations 0.70
334973743 2015-1-22 0:00: PW No Violations 3.00
413283786 2017-3-13 0:00: PW No Violations 1.50
657882819 2016-1-28 0:00: PW No Violations 1.00
988067147 2019-8-28 0:00: PW No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0399901332 US-OH-124263 2016-02-05 Well operation causing pollution and contamination
0399901332 US-OH-124264 2016-02-05 Well insufficiently equipped to prevent escape of oil and gas

For data sources see[9]

References