If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Richland Township | |
Operator Name: UTICA RESOURCE OPERATING LLC | |
Well Pad ID: US-OH-000560 | |
Farm/Lease Name: DETWEILER | |
License Status: Producing | |
License Date: 2012-07-19 | |
Spud Date: 2012-07-25 | |
Spud Drilling Contractor: DALLAS MORRIS | |
Final Drill Date: 2012-08-31 | |
Well Total Depth: 11611.00 ft | |
Configuration: Horizontal | |
Latitude: 39.980000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-19 | Proposed Formations:POINT PLEASANT, Issued Date:7/19/2012, Expired Date:7/19/2014 12:00:00 PM, Drilling unit acres:541, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-08-31 | |
Completion Report Received | 2012-10-26 | |
End of Confidential Data | 2013-08-31 | |
Construction Permit Expires | 2014-07-19 | |
Correction to Well | 2016-01-29 | Updated Location info per as-drilled survey-ALE |
Change of Owner | 2018-05-04 | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC |
Record Last Modified | 2018-05-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-01-31 | 8844 | 9188 | 41 |
2013-01-31 | 11280 | 11536 | 30 |
2013-01-31 | 10579 | 10725 | 17 |
2013-01-31 | 9769 | 1000 | 40 |
2013-01-31 | 10000 | 10289 | 39 |
2013-01-31 | 10289 | 10579 | 40 |
2013-01-31 | 9188 | 9538 | 40 |
11280 | 11536 | 30 | |
11003 | 11280 | 41 | |
10725 | 11003 | 40 | |
10579 | 10725 | 17 | |
10289 | 10579 | 40 | |
10000 | 10289 | 39 | |
9769 | 1000 | 40 | |
9538 | 9769 | 39 | |
9188 | 9538 | 40 | |
8844 | 9188 | 41 | |
8501 | 8844 | 40 | |
8163 | 8500 | 40 | |
7963 | 8163 | 39 | |
7700 | 7963 | 41 | |
7700 | 7963 | 41 | |
2013-01-31 | 9538 | 9769 | 39 |
2013-01-31 | 8501 | 8844 | 40 |
2013-01-31 | 7700 | 7963 | 41 |
2013-01-31 | 7963 | 8163 | 39 |
2013-01-31 | 8163 | 8500 | 40 |
2013-01-31 | 10725 | 11003 | 40 |
2013-01-31 | 11003 | 11280 | 41 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/11/2012 | 12/20/2012 | 7373 | 111985 | 134436 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 30/50 Sand | Schlumberger | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 32.3388 | 5,926,620.0 |
J609 Friction Reducer | Schlumberger | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | 0.140102 | 0 | |
F112 Surfactant | Schlumberger | Surfactant | Polyethylene glycol monohexyl ether | 31726-34-8 | 13 | 0.0455421 | 0 | |
J218 Breaker | Schlumberger | Breaker | Diammonium peroxidisulphate | 7727-54-0 | 100 | 0.173443 | 0 | |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 16.0521 | 0 | |
L058 Iron Stabilizer | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.0150508 | 0 | |
15% HCL Acid | Schlumberger | Solvent | Hydrochloric Acid | 7647-01-0 | 15 | 0.358984 | 0 | |
100-Mesh Sand | Schlumberger | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 32.3388 | 546760 | |
J580 Water Gelling Agent | Schlumberger | Gellant | Carbohydrate polymer | Proprietary | 100 | 6.2319 | 0 | |
A264 Corrosion Inhibitor | Schlumberger | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 10 | 0.000415744 | 0 | |
Aliphatic acids | Proprietary | 30 | 0.00124723 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00166262 | 0 | ||||
Aliphatic alcohols, ethoxylated #1 | Proprietary | 30 | 0.00124723 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-12-13 | H2O | 15 | 7806 Bbl | 444540 | Schlumberger | STAGE 8 |
2012-12-13 | H2O | 15 | 9287 Bbl | 581580 | Schlumberger | STAGE 9 |
2012-12-14 | H2O | 15 | 9184 Bbl | 570920 | Schlumberger | STAGE 12 |
2012-12-15 | H2O | 15 | 6995 Bbl | 450580 | Schlumberger | STAGE 14 |
2012-12-12 | H2O | 15 | 7541 Bbl | 460260 | Schlumberger | STAGE 6 |
2012-12-11 | H2O | 15 | 7467 Bbl | 450160 | Schlumberger | STAGE 3 |
2012-12-13 | H2O | 15 | 7792 Bbl | 450780 | Schlumberger | STAGE 7 |
2012-12-11 | H2O | 15 | 7553 Bbl | 459700 | Schlumberger | STAGE 2 |
2012-12-14 | H2O | 15 | 11397 Bbl | 573280 | Schlumberger | STAGE 10 |
2012-12-12 | H2O | 15 | 9377 Bbl | 571660 | Schlumberger | STAGE 5 |
2012-10-03 | H2O | 15 | 9554 Bbl | 569300 | Schlumberger | STAGE 1 |
2012-12-15 | H2O | 15 | 5101 Bbl | 309660 | Schlumberger | STAGE 13 |
2012-12-14 | H2O | 15 | 10245 Bbl | 576960 | Schlumberger | STAGE 11 |
2012-12-12 | H2O | 15 | 2677 Bbl | 4000 | Superior Well Services | STAGE 4 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | PDC ENERGY INC | 202552 | 49156 | 243 |
2014 | PDC ENERGY INC | 70711 | 12663 | 362 |
2015 | PDC ENERGY INC | 57073 | 10162 | 364 |
2016 | PDC ENERGY INC | 46522 | 8428 | 366 |
2017 | PDC ENERGY INC | 39839 | 7120 | 365 |
2018 | UTICA RESOURCE OPERATING LLC | 36478 | 4654 | 364 |
2019 | UTICA RESOURCE OPERATING LLC | 8402 | 1354 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | PDC ENERGY INC | Brine | 14020 | 243 |
2014 | PDC ENERGY INC | Brine | 3313 | 362 |
2015 | PDC ENERGY INC | Brine | 1075 | 364 |
2016 | PDC ENERGY INC | Brine | 1339 | 366 |
2017 | PDC ENERGY INC | Brine | 1099 | 365 |
2018 | UTICA RESOURCE OPERATING LLC | Brine | 677 | 273 |
2019 | UTICA RESOURCE OPERATING LLC | Brine | 231 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1125438088 | 2016-12-20 0:00 | PW | No Violations | 0.50 |
-1458151118 | 2019-4-30 0:00: | PW | No Violations | 0.40 |
-177060115 | 2013-1-15 0:00: | PW | No Violations | |
-2097419113 | 2014-1-28 0:00: | PL | No Violations | 0.50 |
-474311463 | 2016-2-24 0:00: | PW | No Violations | 1.00 |
-834218211 | 2017-10-24 0:00 | PW | No Violations | 0.50 |
0177060115 | 2013-01-15 | Production Wells | No Violations | On the day of my inspection I found the service rig had moved out and the well was currently shut in. |
0474311463 | 2016-02-24 | Production Wells | No Violations | Inspection response to complaint # 5259. Upon inspection the following was observed at the well head- the well is equipped with a tubing head and casing head with the production flow line valve in the open position. Addressing the production facility and equipment- a total of (8) production tanks are present along with 3 vertical sand trap separators all located inside a polymer lined metal containment dike area. Also on location is 3 gas processing units processing the fluid from the 3 existing wells on location. Supporting the production facility is a low pressure vapor recovery system that is supported by a vapor recover burner system that is on the day of my inspection operating, with the vapor recovery ignition stack found to be located at a coordinates of 39.98900 x 81.38609. Addressing the complaint- On the day of my inspection the wind is noted to be coming from the East and the residence of the individual at 61100 Buzz Kirk Lane does lie a measured distance of 2600 approximately due West and downwind of the well pad. The coordinates for the home is 39.98609 x 81.39547. On this day I did contact a Blake Roush with PDC Energy at 970-260-7028 and inform Him that the landowner identified as Lee Ann Rudd has filed a complaint indicating she is getting a caustic smell during the evening hours inside Her home with the strongest odor between 1:30am and 2:00am. Mr. Roush Indicated the company would follow up on the issue. No compliance issues were present on the well pad on the day of my inspection and no gas reading were detected with my meter in the area of the residence or well pad. |
0772602607 | 2012-12-03 | Completion Testing | No Violations | Stopped by site to check on upcoming frac job a crew from Cresson Supply was laying containment down preparing site for frac operations in the near future. |
0834218211 | 2017-10-24 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500 barrel tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 310 pounds per square inch on the tubing and 590 pounds per square inch on the casing. Identification was present with production records current. |
1125438088 | 2016-12-20 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500 barrel tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 500 pounds per square inch on the tubing and 600 pounds per square inch on the casing. Identification was present with production records current. |
1343337561 | 2012-07-26 | Drill / Deepen / Reopen | No Violations | Express Services on site with auger type rig setting 30 conductor pipe to a depth of 60 they drill a 42 hole and ran 60 of 30 conductor pipe and cemented it in place with 6.5 yards cement. |
1355250337 | 2012-12-11 | Production Wells | No Violations | Schlumberger stimulating the first stage of the well. |
1361297725 | 2013-02-19 | Production Wells | No Violations | I received a phone call from Don Craiger on 02/16/2013 informing me that they would be flaring the well, and that the local fire department and sheriff department was notified. |
1458151118 | 2019-04-30 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500-barrel tanks with three vapor recovery towers, three gas production units, one gas compression skid, horizontal vent scrubber, and one combustor. Identification was present and production records were current. An ECM tanker truck was loading produced fluids from the tank battery and a Utica Resources well tender was present. |
1492168421 | 2015-07-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500bbl tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 450psi on the tubing. Identification was present with production records current. |
1525356800 | 2018-05-03 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The gauge on the production casing read 582 and the gauge on the production tubing read 416. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks with three vapor recovery towers, three gas production units, one gas compression skid, horizontal vent scrubber, and one combustor. Identification was present and production records were current. |
1694922238 | 2016-03-15 | Production Wells | No Violations | On the day inspection following up on complaint ID 5259, I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500bbl tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Completed walk around with PDC Well Technician Carl Caplinger revealing equipment was functioning properly. |
1723542395 | 2020-7-22 0:00: | PW | No Violations | 1.00 |
2097419113 | 2014-01-28 | Preliminary Restoration | No Violations | The site passed preliminary restoration according to 1509.072A. |
772602607 | 2012-12-3 0:00: | CT | No Violations |
For data sources see[10]