X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24224

Well Details

Well ID: 34-059-24224
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Richland Township
Operator Name: UTICA RESOURCE OPERATING LLC
Well Pad ID: US-OH-000560
Farm/Lease Name: DETWEILER
License Status: Producing
License Date: 2012-07-19
Spud Date: 2012-07-25
Spud Drilling Contractor: DALLAS MORRIS
Final Drill Date: 2012-08-31
Well Total Depth: 11611.00 ft
Configuration: Horizontal
Latitude: 39.980000
Longitude: -81.380000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-07-19 Proposed Formations:POINT PLEASANT, Issued Date:7/19/2012, Expired Date:7/19/2014 12:00:00 PM, Drilling unit acres:541, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-08-31
Completion Report Received 2012-10-26
End of Confidential Data 2013-08-31
Construction Permit Expires 2014-07-19
Correction to Well 2016-01-29 Updated Location info per as-drilled survey-ALE
Change of Owner 2018-05-04 Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC
Record Last Modified 2018-05-04

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-01-31 8844 9188 41
2013-01-31 11280 11536 30
2013-01-31 10579 10725 17
2013-01-31 9769 1000 40
2013-01-31 10000 10289 39
2013-01-31 10289 10579 40
2013-01-31 9188 9538 40
11280 11536 30
11003 11280 41
10725 11003 40
10579 10725 17
10289 10579 40
10000 10289 39
9769 1000 40
9538 9769 39
9188 9538 40
8844 9188 41
8501 8844 40
8163 8500 40
7963 8163 39
7700 7963 41
7700 7963 41
2013-01-31 9538 9769 39
2013-01-31 8501 8844 40
2013-01-31 7700 7963 41
2013-01-31 7963 8163 39
2013-01-31 8163 8500 40
2013-01-31 10725 11003 40
2013-01-31 11003 11280 41

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/11/2012 12/20/2012 7373 111985 134436

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 30/50 Sand Schlumberger Proppant Crystalline silica, quartz 14808-60-7 100 32.3388 5,926,620.0
J609 Friction Reducer Schlumberger Friction Reducer Ammonium Sulfate 7783-20-2 30 0.140102 0
F112 Surfactant Schlumberger Surfactant Polyethylene glycol monohexyl ether 31726-34-8 13 0.0455421 0
J218 Breaker Schlumberger Breaker Diammonium peroxidisulphate 7727-54-0 100 0.173443 0
Water Operator Carrier Water 7732-18-5 100 16.0521 0
L058 Iron Stabilizer Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.0150508 0
15% HCL Acid Schlumberger Solvent Hydrochloric Acid 7647-01-0 15 0.358984 0
100-Mesh Sand Schlumberger Proppant Crystalline silica, quartz 14808-60-7 100 32.3388 546760
J580 Water Gelling Agent Schlumberger Gellant Carbohydrate polymer Proprietary 100 6.2319 0
A264 Corrosion Inhibitor Schlumberger Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 10 0.000415744 0
Aliphatic acids Proprietary 30 0.00124723 0
Methanol 67-56-1 40 0.00166262 0
Aliphatic alcohols, ethoxylated #1 Proprietary 30 0.00124723 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-12-13 H2O 15 7806 Bbl 444540 Schlumberger STAGE 8
2012-12-13 H2O 15 9287 Bbl 581580 Schlumberger STAGE 9
2012-12-14 H2O 15 9184 Bbl 570920 Schlumberger STAGE 12
2012-12-15 H2O 15 6995 Bbl 450580 Schlumberger STAGE 14
2012-12-12 H2O 15 7541 Bbl 460260 Schlumberger STAGE 6
2012-12-11 H2O 15 7467 Bbl 450160 Schlumberger STAGE 3
2012-12-13 H2O 15 7792 Bbl 450780 Schlumberger STAGE 7
2012-12-11 H2O 15 7553 Bbl 459700 Schlumberger STAGE 2
2012-12-14 H2O 15 11397 Bbl 573280 Schlumberger STAGE 10
2012-12-12 H2O 15 9377 Bbl 571660 Schlumberger STAGE 5
2012-10-03 H2O 15 9554 Bbl 569300 Schlumberger STAGE 1
2012-12-15 H2O 15 5101 Bbl 309660 Schlumberger STAGE 13
2012-12-14 H2O 15 10245 Bbl 576960 Schlumberger STAGE 11
2012-12-12 H2O 15 2677 Bbl 4000 Superior Well Services STAGE 4

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 PDC ENERGY INC 202552 49156 243
2014 PDC ENERGY INC 70711 12663 362
2015 PDC ENERGY INC 57073 10162 364
2016 PDC ENERGY INC 46522 8428 366
2017 PDC ENERGY INC 39839 7120 365
2018 UTICA RESOURCE OPERATING LLC 36478 4654 364
2019 UTICA RESOURCE OPERATING LLC 8402 1354 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 PDC ENERGY INC Brine 14020 243
2014 PDC ENERGY INC Brine 3313 362
2015 PDC ENERGY INC Brine 1075 364
2016 PDC ENERGY INC Brine 1339 366
2017 PDC ENERGY INC Brine 1099 365
2018 UTICA RESOURCE OPERATING LLC Brine 677 273
2019 UTICA RESOURCE OPERATING LLC Brine 231 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1125438088 2016-12-20 0:00 PW No Violations 0.50
-1458151118 2019-4-30 0:00: PW No Violations 0.40
-177060115 2013-1-15 0:00: PW No Violations
-2097419113 2014-1-28 0:00: PL No Violations 0.50
-474311463 2016-2-24 0:00: PW No Violations 1.00
-834218211 2017-10-24 0:00 PW No Violations 0.50
0177060115 2013-01-15 Production Wells No Violations On the day of my inspection I found the service rig had moved out and the well was currently shut in.
0474311463 2016-02-24 Production Wells No Violations Inspection response to complaint # 5259. Upon inspection the following was observed at the well head- the well is equipped with a tubing head and casing head with the production flow line valve in the open position. Addressing the production facility and equipment- a total of (8) production tanks are present along with 3 vertical sand trap separators all located inside a polymer lined metal containment dike area. Also on location is 3 gas processing units processing the fluid from the 3 existing wells on location. Supporting the production facility is a low pressure vapor recovery system that is supported by a vapor recover burner system that is on the day of my inspection operating, with the vapor recovery ignition stack found to be located at a coordinates of 39.98900 x 81.38609. Addressing the complaint- On the day of my inspection the wind is noted to be coming from the East and the residence of the individual at 61100 Buzz Kirk Lane does lie a measured distance of 2600 approximately due West and downwind of the well pad. The coordinates for the home is 39.98609 x 81.39547. On this day I did contact a Blake Roush with PDC Energy at 970-260-7028 and inform Him that the landowner identified as Lee Ann Rudd has filed a complaint indicating she is getting a caustic smell during the evening hours inside Her home with the strongest odor between 1:30am and 2:00am. Mr. Roush Indicated the company would follow up on the issue. No compliance issues were present on the well pad on the day of my inspection and no gas reading were detected with my meter in the area of the residence or well pad.
0772602607 2012-12-03 Completion Testing No Violations Stopped by site to check on upcoming frac job a crew from Cresson Supply was laying containment down preparing site for frac operations in the near future.
0834218211 2017-10-24 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500 barrel tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 310 pounds per square inch on the tubing and 590 pounds per square inch on the casing. Identification was present with production records current.
1125438088 2016-12-20 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500 barrel tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 500 pounds per square inch on the tubing and 600 pounds per square inch on the casing. Identification was present with production records current.
1343337561 2012-07-26 Drill / Deepen / Reopen No Violations Express Services on site with auger type rig setting 30 conductor pipe to a depth of 60 they drill a 42 hole and ran 60 of 30 conductor pipe and cemented it in place with 6.5 yards cement.
1355250337 2012-12-11 Production Wells No Violations Schlumberger stimulating the first stage of the well.
1361297725 2013-02-19 Production Wells No Violations I received a phone call from Don Craiger on 02/16/2013 informing me that they would be flaring the well, and that the local fire department and sheriff department was notified.
1458151118 2019-04-30 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of eight 500-barrel tanks with three vapor recovery towers, three gas production units, one gas compression skid, horizontal vent scrubber, and one combustor. Identification was present and production records were current. An ECM tanker truck was loading produced fluids from the tank battery and a Utica Resources well tender was present.
1492168421 2015-07-16 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500bbl tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Gauge present read 450psi on the tubing. Identification was present with production records current.
1525356800 2018-05-03 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The gauge on the production casing read 582 and the gauge on the production tubing read 416. Annular pressure monitoring was present. The production equipment consisted of eight 500 barrel tanks with three vapor recovery towers, three gas production units, one gas compression skid, horizontal vent scrubber, and one combustor. Identification was present and production records were current.
1694922238 2016-03-15 Production Wells No Violations On the day inspection following up on complaint ID 5259, I witnessed that the production equipment included a GP Unit, a vapor recovery system, a gas combustor and a total of 8-500bbl tanks all within containment and shared with the 2H and 3H. The well was equipped with a plunger lift system with valves in the open position. Completed walk around with PDC Well Technician Carl Caplinger revealing equipment was functioning properly.
1723542395 2020-7-22 0:00: PW No Violations 1.00
2097419113 2014-01-28 Preliminary Restoration No Violations The site passed preliminary restoration according to 1509.072A.
772602607 2012-12-3 0:00: CT No Violations

For data sources see[10]

References