If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24266 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.04,"lon":-81.24,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Guernsey | |
| Municipality: Oxford Township | |
| Operator Name: DIVERSIFIED PRODUCTION LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HAROLD WHEELER | |
| License Status: Producing | |
| License Date: 2013-03-08 | |
| Spud Date: 2013-06-07 | |
| Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
| Final Drill Date: 2013-06-13 | |
| Well Total Depth: 4380.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.040000 | |
| Longitude: -81.240000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2013-03-08 | Proposed Formations:BEREA-OHIO SHALE, Issued Date:3/8/2013, Expired Date:3/8/2015 12:00:00 PM, Drilling unit acres:100.47, Proposed Well Type:OG, Proposed Well Class:EW |
| Correction to Well | 2013-03-15 | CORRECTION TO FOOTAGE. |
| Reached Total Depth | 2013-06-13 | |
| Completion Report Received | 2013-11-18 | |
| Change of Owner | 2014-02-06 | Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC |
| Construction Permit Expires | 2015-03-08 | |
| Change of Owner | 2016-08-02 | Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-11-19 | 4046 | 4164 | 30 |
| 2013-11-19 | 4209 | 4217 | 32 |
| 4209 | 4217 | 32 | |
| 4046 | 4164 | 30 | |
| 4046 | 4164 | 30 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2013-07-24 | H2O | 15 | 0 | 45100 | Universal Well Services Inc. | STAGE 1 |
| H2O | 15 | 0 | 27500 | STAGE 3 | ||
| H2O | 15 | 0 | 45100 | Universal Well Services Inc. | STAGE 2 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | ECLIPSE RESOURCES-OHIO LLC | 1760.00 | 0.00 | 128 |
| 2014 | ECLIPSE RESOURCES-OHIO LLC | 3112.00 | 0.00 | 128 |
| 2015 | ECLIPSE RESOURCES-OHIO LLC | 1377.00 | 0.00 | 365 |
| 2016 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
| 2017 | M & R INVESTMENTS OHIO LLC | 1732.00 | 0.00 | 365 |
| 2018 | M & R INVESTMENTS OHIO LLC | 1346.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | ECLIPSE RESOURCES-OHIO LLC | Brine | 644 | 128 |
| 2014 | ECLIPSE RESOURCES-OHIO LLC | Brine | 20 | 128 |
| 2015 | ECLIPSE RESOURCES-OHIO LLC | Brine | 0 | 365 |
| 2016 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
| 2017 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
| 2018 | M & R INVESTMENTS OHIO LLC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -2022405712 | 2019-7-2 0:00:0 | PW | No Violations | 0.50 |
| -2097443321 | 2019-3-6 0:00:0 | PW | No Violations | 0.70 |
| -366006798 | 2014-8-12 0:00: | PL | No Violations | 1.50 |
| -744210152 | 2017-6-7 0:00:0 | PW | No Violations | 0.50 |
| 0366006798 | 2014-08-12 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the production equipment included a 100bbl tank, a 30bbl brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch casing, 4.5 inch casing, 2.375 inch tubing and a plunger lift system with valves in the open position at the wellhead. Well identification was present and the site passed preliminary restoration according ORC 1509.072A. |
| 0744210152 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a 100 barrel tank, a 3 barrel brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch diameter casing, 4.5 inch diameter casing, 2.375 inch diameter tubing and a plunger lift system with valves in the open position on the tubing and 1 of 2 valves open on the casing. Gauge present on the casing read 380psi. Well identification was present and production records were current through 2015. |
| 1466700373 | 2016-06-23 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a 100bbl tank, a 30bbl brine tank, a vertical separator, a drip and a 1.5 inch Honeywell rotary meter with a chart recorder all within an earthen dike. The well was equipped with 7 inch casing, 4.5 inch casing, 2.375 inch tubing and a plunger lift system with valves in the open position on the tubing and 1 of 2 valves open on the casing. Gauge present on the casing read 350psi. Well identification was present and production records were current. |
| 1664819697 | 2020-5-29 0:00: | PW | No Violations | 1.00 |
| 2097443321 | 2019-03-06 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with 4.5-inch diameter production casing with a tubing head, 2.375-inch diameter tubing, and a plunger lift. The production flow line was in the closed position. Gauges present read 245 pounds per square inch on the 4.5-inch production casing and 255 pounds per square inch on the production tubing. The production equipment consisted of one 100-barrel tank, one 1550-gallon poly tank, one vertical separator, and a Honeywell sales meter with chart recorder. M&R Investments have submitted production records reporting gas production for the year 2017. |
For data sources see[9]