If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24301 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.14,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Londonderry Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000533 | |
Farm/Lease Name: RIPLEY | |
License Status: Producing | |
License Date: 2013-07-19 | |
Spud Date: 2014-05-14 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-06-19 | |
Well Total Depth: 14370.00 ft | |
Configuration: Horizontal | |
Latitude: 40.140000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-19 | Proposed Formations:POINT PLEASANT, Issued Date:7/19/2013, Expired Date:7/19/2015 12:00:00 PM, Drilling unit acres:625.078, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-07-26 | CORRECTION TO SURFACE FOOTAGE |
Reached Total Depth | 2014-06-19 | |
Correction to Well | 2014-06-27 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 623.320 ACRES. |
Correction to Well | 2015-01-09 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2015-06-15 | |
Construction Permit Expires | 2015-07-19 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/03/2014 | 10/16/2014 | 7536 | 12,241,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.2023 | 0 |
OptiKleen-WF(TM) | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0105926 | 0 | |
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.000874444 | 0 | |
HCl > 10% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 100 | 0.0580616 | 0 | |
HCl < 10% | Halliburton | Solvent | Hydrochloric Acid | 7647-01-0 | 100 | 0.541822 | 0 | |
40/70 White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 2.41537 | 0 | |
Crystalline silica, quartz | 14808-60-7 | 100 | 8.64981 | 0 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 60 | 0.000257662 | 0 | |
Propargyl alcohol | 107-19-7 | 10 | 0.00004294 | 0 | ||||
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.00134051 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic anhydride | 108-24-7 | 100 | 0.00345737 | 0 | |
Acetic acid | 64-19-7 | 60 | 0.00207442 | 0 | ||||
LP-65 | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00101796 | 0 | |
Other Purpose | Amide | Confidential | 0 | 0.00469418 | 0 | |||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000938836 | 0 | ||||
Olefins | Confidential | 0 | 0.00000429 | 0 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000128831 | 0 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0281651 | 0 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00469418 | 0 | ||||
Alcohols ethoxylated | Confidential | 0 | 0.00469418 | 0 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000128831 | 0 | ||||
Water | 7732-18-5 | 0 | 0.0735734 | 0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000128831 | 0 | ||||
Olefins | Confidential | 0 | 0.00002147 | 0 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000938836 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0.000101796 | 0 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00469418 | 0 | ||||
Organic phosphonate | Confidential | 0 | 0.00610779 | 0 | ||||
FRA-407 | Weatherford | Friction Reducer | Ammonium acetate | 631-61-8 | 5 | 0.00352063 | 0 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 40 | 0.0281651 | 0 | ||||
FE-2A | Halliburton | Additive | Citric acid | 77-92-9 | 60 | 0.00239107 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
8 | 0 | 0 | ||||
2014-10-03 | H2O | 15 | 401181 Gal | 400900 | Halliburton | STAGE 1/32
45 SHOTS |
2014-10-16 | H2O | 0 | 386045 Gal | 406300 | Halliburton | STAGE 32/32
45 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | 62134 | 14646 | 29 |
2015 | GULFPORT ENERGY CORPORATION | 563507 | 126408 | 340 |
2016 | GULFPORT ENERGY CORPORATION | 358873 | 54319 | 364 |
2017 | GULFPORT ENERGY CORPORATION | 244437 | 31031 | 357 |
2018 | GULFPORT ENERGY CORPORATION | 189803 | 19257 | 349 |
2019 | GULFPORT ENERGY CORPORATION | 31459 | 3276 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | GULFPORT ENERGY CORPORATION | Brine | 5966 | 29 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 32521 | 340 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 9164 | 364 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 5975 | 357 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 6840 | 349 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1099 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1364803740 | 2018-5-2 0:00:0 | PW | No Violations | 0.50 |
-137720071 | 2016-4-7 0:00:0 | PW | No Violations | 0.30 |
-146440695 | 2014-5-21 0:00: | DD | No Violations | 2.00 |
-1879914567 | 2015-1-12 0:00: | PL | No Violations | 0.50 |
-2073491812 | 2016-9-6 0:00:0 | PW | No Violations | 0.20 |
-2137550092 | 2019-2-14 0:00: | PW | No Violations | 0.30 |
-80553823 | 2014-6-4 0:00:0 | CS | No Violations | 9.00 |
0013743380 | 2017-07-25 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 2-26H, and Ripley 3-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a plunger lift system with valves in the open position with 260 pounds per square inch on the tubing and 310 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
0080553823 | 2014-06-04 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Patterson UTI Drilling Rig #257 drilled a 17.5 inch diameter hole to the depth of 354 feet and Franks Casing crew ran 354 feet of 13.375 inch 54.5#/ft. J-55 Surface Casing. Stingray Cementing was on site and gained circulation with 124bbls of fresh water. Stingray Cementing pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 478 sacks of class A cement. Good returns of 12bbls, floats did not hold, pressured up and shut in cement head. |
0137720071 | 2016-04-07 | Production Wells | No Violations | On the day of my inspection I witnessed that the location was gated and locked. The production equipment included 8-400bbl tanks and 1-50bbl tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 2-26H, and Ripley 3-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 700psi on the tubing and 400psi on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
0146440695 | 2014-05-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac Drilling Rig #257 had begun to move on site with the rig moving from Pennsylvania. I met with Company Men Frank Bean and Jimmy Linger and did walk around. Cellars were being sealed at the time of inspection. No violations. |
0954386798 | 2018-04-19 | Production Wells | No Violations | The purpose of my inspection was to follow up on a fire that occurred on the Northeast side of the pad. The containment under the vertical heater treater ignited and caught fire which eventually spread to the vegetation beside the pad. During my inspection the wells were shut in and contractors were installing new containment under the vertical heater treater. The production equipment consisted of eight 400 barrel tanks, one 50 barrel tank, a vapor recovery tower, two compressors, a vertical heater treater, a gas combustor, back-up flare stack, a horizontal line heater, a vertical separator, and a sand trap. |
0955680054 | 2014-05-29 | Drill / Deepen / Reopen | No Violations | I am onsite today to attend the Pre-Spud meeting which consisted of Location, Permit, Regulatory, Geology, Completion, Drilling, Casing Strings, Cementing, Production tangent, curve and lateral. Rig up should be completed tomorrow with spud to follow. |
1356231902 | 2017-02-07 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 2-26H, and Ripley 3-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 250 pounds per square inch on the tubing and 550 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
1364803740 | 2018-05-02 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The production equipment consisted of eight 400 barrel tanks, one 50 barrel tank, a vapor recovery tower, two compressors, a vertical heater treater, a gas combustor, back-up flare stack, a horizontal line heater, a vertical separator, and a sand trap. |
13743380 | 2017-7-25 0:00: | PW | No Violations | 0.50 |
1400097731 | 2014-05-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Express Energy Services drilled a 32 inch diameter hole to the depth of 109 feet and ran 110 feet of 26 inch 102.63#/ft conductor pipe. Stingray Cementing was on site and gained circulation with 41bbls of fresh water. Stingray Cementing pumped 15bbls of gel, 10bbls of fresh water and cemented pipe with 236 sacks of class A cement. Good returns of 12bbls and cement stayed surface. |
1401211335 | 2014-05-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Nomac Drilling Rig #257 is rigging up with plans to spud on Friday. I discussed upcoming casing program with Company Man Frank Bean. Site inspection revealed no violations. |
1402244595 | 2014-06-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson UTI Drilling Rig #257 drilled a 12.25 inch diameter hole to the depth of 2084 feet and Franks Casing crew ran 2069 feet of 9.625 inch 36#/ft. J-55 Intermediate Casing. Stingray Cementing pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 720 sacks of class A cement. Good returns of 20bbls plug was landed @ 814psi and pressured up to 1356psi for 5 minutes and the floats held. Cement stayed to surface. |
1477875741 | 2020-10-22 0:00 | PW | No Violations | 1.00 |
1655352432 | 2014-06-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Inspector Brandon Trigg, I witnessed that Patterson UTI Drilling Rig #257 had performed their FIT test, drilled out their float equipment and was drilling an 8.75 inch diameter hole at the depth of 2262 feet. |
1879914567 | 2015-01-12 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A. |
2073491812 | 2016-09-06 | Production Wells | No Violations | On the day of my inspection I witnessed that the location was gated and locked. The production equipment included 8-400 barrel tanks and 1-50 barrel tank within containment, a vapor recovery tower, a vapor blow case, a disconnected horizontal 3-phase separator, 2-compressor units, a vertical heater treater, a gas combustor and back-up flare stack all shared with the Ripley 1-26H, Ripley 2-26H, and Ripley 3-26H. Also present a horizontal line heater, a vertical separator and a sand trap. The well was equipped with a production tree with valves in the open position with 200 pounds per square inch the tubing and 500 pounds per square inch on the casing. Annular pressure monitoring was present along with proper identification and production records being current. |
2137550092 | 2019-02-14 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present with valves reading 0 pounds per square inch on the 13.375-inch diameter surface casing, and 300 pounds per square inch on the 9.625-inch diameter intermediate casing. The production equipment on pad consisted of four vertical separators, four sand traps, four horizontal indirect line heaters, one vertical heater treater, eight 400-barrel tanks, one 50-barrel tank, one vapor recovery tower, one gas combustor, and one flare stack. Identification was located on the wellhead. |
954386798 | 2018-4-19 0:00: | PW | No Violations | 0.20 |
955680054 | 2014-5-29 0:00: | DD | No Violations | 3.00 |
For data sources see[9]