| Well ID: 34-059-24313 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-81.41,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Guernsey | |
| Municipality: Washington Township | |
| Operator Name: CARRIZO (UTICA) LLC | |
| Well Pad ID: US-OH-000834 | |
| Farm/Lease Name: BROWN | |
| License Status: Plugged Back | |
| License Date: 2014-05-06 | |
| Spud Date: 2014-06-18 | |
| Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING | |
| Final Drill Date: 2014-07-04 | |
| Well Total Depth: 6034.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.180000 | |
| Longitude: -81.410000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2013-09-10 | Proposed Formations:POINT PLEASANT, Issued Date:9/10/2013, Expired Date:9/10/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class: |
| APP | 2013-09-20 | Proposed Formations:POINT PLEASANT, Issued Date:9/20/2013, Expired Date:9/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| APP | 2014-05-06 | Proposed Formations:POINT PLEASANT, Issued Date:5/6/2014, Expired Date:5/5/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| Reached Total Depth | 2014-07-04 | |
| Plugged Back | 2014-09-30 | |
| Completion Report Received | 2015-12-17 | |
| Construction Permit Expires | 2016-05-05 | |
| Record Last Modified | 2017-12-12 |
For data sources see[2]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 11/03/2014 | 11/15/2014 | 7090 | 12,038,100.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0685998 | 77324 |
| LP-65 | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00261588 | 2949 | |
| SAND - COMMON WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 0.268476 | 302620 | |
| MC B-8626 | MultiChem | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.000128026 | 1529 | |
| Ethanol | 64-17-5 | 5 | 0.00002134 | 255 | ||||
| Alkyl (C12-16) dimethylbenzylammonium chloride | 68424-85-1 | 7 | 0.00002987 | 357 | ||||
| Didecyldimethylammonium chloride | 7173-51-5 | 10 | 0.00004268 | 510 | ||||
| HCl < 10% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 60 | 7.76833 | 31322 | |
| HAI-OS | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 60 | 0.00313884 | 12.6558 | |
| Propargyl Alcohol | 107-19-7 | 10 | 0.00052314 | 2.1093 | ||||
| BC-140 | Halliburton | Crosslinker | Monoethanolamine borate | 26038-87-9 | 60 | 0.00286965 | 3235 | |
| Ethylene glycol | 107-21-1 | 30 | 0.00143482 | 1618 | ||||
| Other Ingredient(s) | Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000723994 | 817 | |||
| Cured acrylic resin | Confidential | 0 | 0.00000143 | 2 | ||||
| Water | 7732-18-5 | 0 | 0.0620046 | 69891 | ||||
| Amide | Confidential | 0 | 0.00361997 | 4081 | ||||
| Organic phosphonate | Confidential | 0 | 0.0156953 | 17692 | ||||
| Sodium chloride | 7647-14-5 | 0 | 0.00361997 | 4081 | ||||
| C.I. Pigment Red 5 | 6410-41-9 | 0 | 0.00000143 | 2 | ||||
| Formaldehyde | 50-00-0 | 0 | 0.000261588 | 295 | ||||
| Cured acrylic resin | Confidential | 0 | 0.00004282 | 49 | ||||
| Crystalline Silica, Quartz | 14808-60-7 | 0 | 0.00006860 | 78 | ||||
| Surfactant mixture | Confidential | 0 | 0.000685998 | 774 | ||||
| Enzyme | Confidential | 0 | 0.00000714 | 9 | ||||
| Silica gel | 112926-00-8 | 0 | 0.000685998 | 774 | ||||
| Polyacrylamide copolymer | Confidential | 0 | 0.0217198 | 24483 | ||||
| Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000723994 | 817 | ||||
| Alcohols ethoxylated | Confidential | 0 | 0.00361997 | 4081 | ||||
| Ammonium chloride | 12125-02-9 | 0 | 0.00361997 | 4081 | ||||
| Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 0 | 0.00342999 | 3867 | ||||
| Sodium sulfate | 7757-82-6 | 0 | 0.00000117 | 2 | ||||
| FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0217198 | 24483 | |
| SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.00117284 | 1322 | |
| 30/50 White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 8.87173 | 10,000,000.0 | |
| Crystalline silica, quartz | 14808-60-7 | 100 | 0.994911 | 1,121,440.0 | ||||
| Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.9629 | 100,277,000.0 | |
| LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.00234327 | 2642 | |
| OPTIFLO-HTE | Halliburton | Breaker | Walnut hulls | NA | 100 | 0.000142746 | 161 | |
| Crystalline silica, quartz | 14808-60-7 | 30 | 0.00004282 | 49 |
For data sources see[3]
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2015 | CARRIZO (UTICA) LLC | Brine | 17825 | 359 |
| 2016 | CARRIZO (UTICA) LLC | Brine | 70 | 8 |
| 2017 | CARRIZO (UTICA) LLC | Brine | 1316 | 160 |
| 2018 | ASCENT RESOURCES UTICA LLC | Brine | 773 | 318 |
| 2019 | ASCENT RESOURCES UTICA LLC | Brine | 521 | 79 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1145597947 | 2014-11-5 0:00: | CT | No Violations | 4.00 |
| -1406954476 | 2014-9-24 0:00: | DD | No Violations | 2.00 |
| -150120558 | 2019-5-1 0:00:0 | PW | No Violations | 0.70 |
| -155037871 | 2014-10-10 0:00 | DD | No Violations | 3.00 |
| -1609765750 | 2015-7-21 0:00: | CT | No Violations | 1.00 |
| -1761110288 | 2020-10-29 0:00 | PW | No Violations | 1.00 |
| -1934583030 | 2020-4-27 0:00: | PL | No Violations | |
| -1934601295 | 2018-7-26 0:00: | PW | No Violations | 1.00 |
| -50692918 | 2014-9-16 0:00: | DD | No Violations | 1.00 |
| -934834911 | 2017-6-8 0:00:0 | PW | No Violations | 1.00 |
| 0050692918 | 2014-09-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #334 was rigging up with plans to re-spud well on Friday. Met with Company Man Leon Hall and completed walk around. |
| 0150120558 | 2019-05-01 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with production tree style wellhead with valves in the open position. The gauge on the 13.375-inch diameter casing had 750 pounds per square inch, the 9.625-inch diameter intermediate casing had 2850 pounds per square inch, and the 5.5-inch diameter production casing had 450 pounds per square inch. The production equipment consisted of two gas production units, one compressor, one combustor, and four 400-barrel tanks. The Blue Racer pipeline tie in was located on the south side of the pad. Identification was located at the wellhead and the pad entry. Schlumberger and Halliburton equipment were staged on the west side of the pad. I called Adam Pence the manager of Ascents production and made him aware of the pressure that was found on the gauge of the 9.625-inch intermediate casing. Mr. Pence stated that Ascent personnel would respond immediately to investigate the high 9.625-inch casing pressure. |
| 0155037871 | 2014-10-10 | Drill / Deepen / Reopen | No Violations | |
| 0203832589 | 2015-06-19 | Production Wells | No Violations | On the day of my inspection I witnessed EFS was continuing flowback testing with planned completion of July 30, 2015. Flowback has leveled off and is currently at 280bbls of oil, 62bbls of water and 1.1MMCF of gas per day with casing pressure at 1100psi and tubing pressure at 766psi. |
| 0299975766 | 2015-08-10 | Production Wells | No Violations | On the day of my inspection I witnessed EFS was continuing flowback testing with production at 182bbls of oil, 35bbls of water and 1.1MMCF of gas per day with casing pressure at 768psi and tubing pressure at 545psi. Carrizo has plans to install a plunger lift system as fluid recovery levels are decreasing. |
| 0724844284 | 2015-03-06 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed EFS was in day 41 of 90 on flowback. 2.375 inch EUE 4.7#/ft J-55 tubing was set at 6501 feet with pressure on the casing at 1500psi. Flowback has leveled off and is currently 400bbls of oil, 80bbls of water and 1MMCF of gas per day with the oil at a specific gravity of 50. Production equipment included a GP unit and 400bbl tanks. The site passed preliminary restoration according to ORC 1509.072A. |
| 0763393361 | 2017-04-13 | Production Wells | No Violations | I received a phone call from Carrizo Utica Company representative on 4/12/17 stating that they will be bringing pipeline construction equipment on to the pad and that they will have the well in production by the end of May 2017. During my inspection I witnessed the pipeline being installed alongside the lease road, the production equipment being assembled, and the well was in a protective cage with cement barriers surrounding the cage. The Southeast corner of the pad was being used as a staging area for the pipeline equipment. The well was equipped with a production tree style wellhead with valves in the closed position. Annular pressure monitoring was present with 500 pounds per square inch on the 9.625 inch diameter intermediate casing and 700 pounds per square inch on the 13.375 inch diameter intermediate. The production equipment consisted of a gas production unit and four 400 barrel tanks. |
| 0934834911 | 2017-06-08 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a production tree and the valves were in the open position. Gauge present read 1150 pounds per square inch on the tubing with annular pressure monitoring in place. Production equipment included 2-GP units, a compressor unit, a gas combustor, 4-400 barrel tanks within containment and gas dryer skid. The well has been tied into Blue Racers pipeline and was selling gas at the time of inspection. |
| 1067906976 | 2020-11-3 0:00: | PW | No Violations | 1.00 |
| 1145597947 | 2014-11-05 | Completion Testing | No Violations | On the day of my inspection I witnessed that Halliburton Services was on site fracing stage 3 of 26 total stages. 417356lbs of propant was used at average treating rate of 80.9bpm and an average treating pressure of 8096psi. |
| 1403554489 | 2014-06-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection, I witnessed Baker Hughes break circulation with fresh water then displace one thousand fourteen sacks of NE1 cement with a weight of 15.6 and a yield of 1.20, I witnessed full returns to surface. |
| 1406954476 | 2014-09-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Supervisor Rocky King, I met with Company Man Leon Hall. Patterson UTI Drilling Rig #332 was tripping in the hole to drill cores from 6808 feet to 7108 feet and then plug back. Completed walk around and found minor containment tears and a drip on a drilling water frac tank inside containment. Issues were reported issues to Leon Hall and they will be addressed. |
| 1413377943 | 2014-10-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Drilling Rig #334 had reached td, ran and set 13663 feet of 5.5 inch production casing. The rig was in the process of rigging down and preparing to move to the Wagler Pad. |
| 1452695370 | 2016-01-13 | Production Wells | No Violations | On the day of my inspection I witnessed the well was shut-in with all valves in the closed position with the flowline disconnected and secure. I met with Consultant Chris Deel revealing that the production tanks were in the process of being emptied and cleaned as the plan is to leave well shut-in for an extended period. |
| 1609765750 | 2015-07-21 | Completion Testing | No Violations | On the day of my inspection I witnessed EFS was continuing flowback testing with a new completion date September 1, 2015. Flowback has leveled off and is currently at 240bbls of oil, 48bbls of water and 1.3MMCF of gas per day with casing pressure at 1000psi and tubing pressure at 680psi. |
| 1934601295 | 2018-07-26 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with production tree style wellhead with valves in the open position. The production equipment consisted of two gas production units, one compressor, one combustor, and four 400-barrel tanks. The Blue Racer pipeline tie in was located on the south side of the pad. Identification was located at the wellhead and the pad entry. |
| 1944059674 | 2020-2-28 0:00: | PW | No Violations | |
| 203832589 | 2015-6-19 0:00: | PW | No Violations | 1.00 |
| 299975766 | 2015-8-10 0:00: | PW | No Violations | 1.00 |
| 724844284 | 2015-3-6 0:00:0 | PL | No Violations | 2.00 |
| 763393361 | 2017-4-13 0:00: | PW | No Violations | 2.50 |
For data sources see[6]