If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24336 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-81.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Richland Township | |
Operator Name: UTICA RESOURCE OPERATING LLC | |
Well Pad ID: US-OH-000877 | |
Farm/Lease Name: DYNAMITE | |
License Status: Producing | |
License Date: 2014-02-24 | |
Spud Date: 2014-03-22 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-09-16 | |
Well Total Depth: 12107.00 ft | |
Configuration: Horizontal | |
Latitude: 39.970000 | |
Longitude: -81.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-02-24 | Proposed Formations:POINT PLEASANT, Issued Date:2/24/2014, Expired Date:2/24/2016 12:00:00 PM, Drilling unit acres:560.836, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-16
-1/22/19 ALE. | |
Completion Report Received | 2015-07-23
-1/22/19 ALE. | |
Construction Permit Expires | 2016-02-24
-1/22/19 ALE. | |
Correction to Well | 2016-10-21 | CHANGE IN TARGET/TAKEPOINT/ACREAGE PER AS DRILLED PLAT RCVD 10/19/2016-ALE |
Change of Owner | 2018-05-04 | Operator changed from 8595, PDC ENERGY INC to 10114, UTICA RESOURCE OPERATING LLC |
Record Last Modified | 2019-01-22
-1/22/19 ALE. |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/17/2014 | 11/12/2014 | 7189 | 6,959,710.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 90.6178 | 57,974,200.0 |
100 Mesh - COMMON WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 0.850242 | 543956 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 10 | 0.00007181 | 46 | |
Methanol | 67-56-1 | 60 | 0.000430864 | 276 | ||||
BE-9W | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00232405 | 1487 | |
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00165342 | 1058 | |
BA-40L BUFFERING AGENT | Halliburton | Buffer | Potassium carbonate | 584-08-7 | 60 | 0.000327195 | 210 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0105956 | 6779 | |
BC-140 | Halliburton | Crosslinker | Ethylene glycol | 107-21-1 | 30 | 0.0168604 | 10787 | |
Monoethanolamine borate | 26038-87-9 | 60 | 0.0337207 | 21574 | ||||
30/50 - PREMIUM WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 7.53998 | 4,823,820.0 | |
SCALECHEK LP-55 SCALE INHIBITOR | Halliburton | Scale Inhibitor | Polyacrylate | Confidential | 60 | 0.0149159 | 9543 | |
Other Ingredient(s) | Propylene glycol | 57-55-6 | 0 | 0.0139443 | 8922 | |||
Olefins | Confidential | 0 | 0.00000718 | 5 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000353186 | 226 | ||||
Food red 10 | 3734-67-6 | 0 | 0.00000249 | 2 | ||||
Water | 7732-18-5 | 0 | 0.951105 | 608485 | ||||
2,7-Naphthalenedisulfonic acid,
3-hydroxy-4-[(4-sulfor-1-naphthalenyl) azo] -, trisodium salt |
915-67-3 | 0 | 0.00000249 | 2 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000215432 | 138 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00124299 | 796 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00176593 | 1130 | ||||
Olefins | Confidential | 0 | 0.00003591 | 23 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000215432 | 138 | ||||
2,7-Naphthalenedisulfonic acid,
5-(acetylamino) -4-hydroxy-3-[(2-methoxyphenyl) azo] -, disodium salt |
6625-46-3 | 0 | 0.00000249 | 2 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.00176593 | 1130 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000353186 | 226 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000215432 | 138 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0105956 | 6779 | ||||
Fatty acid tall oil amide | Confidential | 0 | 0.00176593 | 1130 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00176593 | 1130 | ||||
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.00329466 | 2108 | |
HYDROCHLORIC ACID 5-10% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 10 | 0.0810294 | 51840 | |
HYDROCHLORIC ACID 10-30% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.00628119 | 4019 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-10-21 | H2O | 0 | 112859 Gal | 104645 | Halliburton | 20 shots total |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | 12374 | 3666 | 13 |
2015 | PDC ENERGY INC | 260203 | 70635 | 365 |
2016 | PDC ENERGY INC | 138079 | 26958 | 366 |
2017 | PDC ENERGY INC | 95797 | 16499 | 365 |
2018 | UTICA RESOURCE OPERATING LLC | 51181 | 5730 | 287 |
2019 | UTICA RESOURCE OPERATING LLC | 20729 | 2349 | 69 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PDC ENERGY INC | Brine | 2516 | 13 |
2015 | PDC ENERGY INC | Brine | 12318 | 365 |
2016 | PDC ENERGY INC | Brine | 5335 | 366 |
2017 | PDC ENERGY INC | Brine | 4689 | 365 |
2018 | UTICA RESOURCE OPERATING LLC | Brine | 1361 | 196 |
2019 | UTICA RESOURCE OPERATING LLC | Brine | 50 | 69 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1000021737 | 2019-4-15 0:00: | PW | No Violations | 0.20 |
-1000869849 | 2019-12-11 0:00 | PW | No Violations | 0.10 |
-1362768952 | 2014-10-21 0:00 | CT | No Violations | 4.00 |
-1593424517 | 2018-9-27 0:00: | PW | No Violations | 0.30 |
-1873380787 | 2018-9-25 0:00: | PW | No Violations | 1.00 |
-2028188604 | 2015-2-27 0:00: | PL | No Violations | 1.00 |
-293903673 | 2018-9-25 0:00: | PW | No Violations | 0.20 |
-38855997 | 2019-1-11 0:00: | PW | No Violations | 0.20 |
-401668881 | 2017-6-29 0:00: | PW | No Violations | 0.50 |
-6244788 | 2018-10-9 0:00: | PW | No Violations | |
-678461106 | 2018-10-29 0:00 | PW | No Violations | 0.20 |
-826793655 | 2018-10-11 0:00 | PW | No Violations | 0.10 |
0006244788 | 2018-10-09 | Production Wells | No Violations | During my inspection the pad was being prepared for the rig to arrive to drill the surface boreholes for 3405924532 and 3405924533. During my inspection the well was caged and still appeared to be in production. Rig components were being brought on location. |
0014865322 | 2018-10-22 | Production Wells | No Violations | The well had been decommissioned with tubing plugs while 2 new wells are being drilled on the pad. |
0038855997 | 2019-01-11 | Production Wells | No Violations | The inspection was conducted as a simultaneous operation inspection on a production well. The well is equipped with a large Texas Style gas plunger lift system with a steel cage built over the well. The production master valves are open, and the annular valves are open measuring pressure. The tubing pressure is 0 psi and the annulus are reading 0 psi. |
0042217321 | 2018-11-08 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-4336. At the time of my inspection the well was temporarily abandoned and caged while Patterson #343 was rigging up to drill two additional wells on the pad. Jersey barriers were placed outside of the cage to prevent a collision with the well head. Pressure gauges to monitor annular, production, and tubing pressure remained in place. The intermediate casing annular pressure gauge indicated 100 psi. The production casing annulus indicated 10 psi. The casing and tubing gauges both indicated 0 psi. All valves remained in the closed position. No leaks were observed. The flare stack was positioned in the Southwest corner of the pad and away from the well heads and surface equipment. The proposed and approved SIMOPS plan conditions were met at this time. |
0067329125 | 2019-02-06 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was recently turned back on after being temporarily abandon in order for two addition wells to be drilled on pad. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of sixteen 500-barrel tanks, four gas production units, two gas compression skids, four vapor recovery towers, horizontal vent scrubber, and two combustors. |
0293903673 | 2018-09-25 | Production Wells | No Violations | Accompanied by ODNR Kenn Frye, during our inspection a berm was being constructed around the pad with the cuttings from the conductors. Conductors had been cemented for 3405924532 and 3405924533. The well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of fifteen 500-barrel tanks, four gas production units, two gas compression skids, four vapor recovery towers, horizontal vent scrubber, and one combustor. Kevin Rothenbuhler was contacted about the cellars bubbling on the 3H and 4H. Mr. Rothenbuhler stated that they would remove the pea gravel from the cellars on all wells and tighten valves and fittings that are plumbed up for annular pressure monitoring to remediate the bubbling. |
0401668881 | 2017-06-29 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges present read 250 pounds per square inch on the tubing and 410 pounds per square inch on the casing. Production equipment included a sand trap, a GP Unit, a vapor recovery system and a total of 12-500 barrel tanks all within containment and shared with the 2H, 3H and 4H. |
0617457057 | 2018-11-05 | Production Wells | No Violations | During my inspection there was not a drilling rig on location. The well was temporarily abandoned and caged. |
0678461106 | 2018-10-29 | Production Wells | No Violations | During my inspection Cameron was on location in the process of installing valve removal plugs and back pressure valves on the 1H, 2H, and 3H. |
0826793655 | 2018-10-11 | Production Wells | No Violations | During my inspection Fountain Quail Rig 4 was on location preparing to drill two additional wells on pad. The well was still producing during inspection. I spoke with Dave Grey, the company man on location for Utica Resources and Mr. Grey stated that they plan to produce the well until the super triple rig comes on location to drill the curves and laterals on the other two wells 7H and 8H. |
0868950181 | 2017-10-24 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges present read 410 pounds per square inch on the tubing and 570 pounds per square inch on the casing. Production equipment included a sand trap, a GP Unit, a vapor recovery system and a total of 12-500 barrel tanks all within containment and shared with the 2H, 3H and 4H. |
1000021737 | 2019-04-15 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of sixteen 500-barrel tanks, four gas production units, two gas compression skids, four vapor recovery towers, horizontal vent scrubber, and two combustors. The well was caged while the 2 wells that were recently added to the pad undergo drill-out operations. |
1195609424 | 2016-12-20 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges present read 255 pounds per square inch on the tubing and 650 pounds per square inch on the casing. Production equipment included a sand trap, a GP Unit, a vapor recovery system and a total of 12-500 barrel tanks all within containment and shared with the 2H, 3H and 4H. |
1265158625 | 2018-04-26 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of fifteen 500 barrel tanks, four gas production units, two gas compression skid, four vapor recovery towers, horizontal vent scrubber, and one combustor. Identification was present and production records were current. |
1362768952 | 2014-10-21 | Completion Testing | No Violations | On the day of my inspection I witnessed that Halliburton Services was on site fracing stage 7 of 64 total stages. 104645lbs of propant was used at average treating rate of 30.7bpm and an average treating pressure of 7608psi. |
1437048905 | 2015-07-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well is online and equipped with a plunger lift system with valves in the open position. Gauges present read 900psi on the tubing and 1500psi on the casing. Production equipment included a sand trap, a GP Unit, a vapor recovery system and a total of 12-500bbl tanks all within containment and shared with the 2H, 3H and 4H. |
1467999759 | 2016-07-08 | Production Wells | No Violations | I received a call on 7/7/16 at 22:00 from PDC EHS Supervisor Tony Long stating that at 18:45 an Ergon truck had a 2bbl oil release on the pad and that Energy Services had been dispatched to clean-up the release. Energy Services had put contained release, applied absorbent pads and bio sorb to the affected area but due to light shut-down final remediation. Energy Services was dispatched again on 7/8/16 at 09:30 and removed stone, remediated with clean fill. Upon arrival at 12:00 remediation was just being completed and contaminated stone will be hauled to a solids landfill. |
14865322 | 2018-10-22 0:00 | PW | No Violations | 0.10 |
1536086397 | 2018-08-29 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. The cellar had been filled with pea gravel. Gauges were present for all casing strings, but the annulus gauges were not identified. The production equipment consisted of fifteen 500-barrel tanks, four gas production units, two gas compression skid, four vapor recovery towers, horizontal vent scrubber, and one combustor. Identification was present and production records were current. Utica Operating Resources has been notified to identify the gauges for annular pressure monitoring. |
1556692291 | 2018-08-16 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. Gauges were present on all casing strings. The production equipment consisted of fifteen 500-barrel tanks, four gas production units, two gas compression skid, four vapor recovery towers, horizontal vent scrubber, and one combustor. QES was on location with a nitrogen truck injecting nitrogen into the 4H well for Enhanced Recovery. |
1561994965 | 2019-7-1 0:00:0 | PW | No Violations | 0.30 |
1562257984 | 2019-7-1 0:00:0 | PW | No Violations | 0.20 |
1565553976 | 2019-10-17 0:00 | PW | No Violations | 0.30 |
1593424517 | 2018-09-27 | Production Wells | No Violations | Accompanied by ODNR Southeast Regional Supervisor Brent Bear, during our inspection rig mats were being place on the pad. The well was equipped with a plunger lift system with production valves in the open position. Annular pressure monitoring was present. The production equipment consisted of fifteen 500-barrel tanks, four gas production units, two gas compression skids, four vapor recovery towers, horizontal vent scrubber, and one combustor. Kevin Rothenbuhler contacted me and stated that the pea gravel was removed from the cellar, the valves for annular pressure monitoring were tightened, and while utilizing a gas sniffer no leaks were detected. The pea gravel was placed back in the cellars today and no bubbling was present. |
1804821220 | 2014-09-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that H&P Drilling Rig #385 had cemented their production string and was setting slips, preparing to rig down and begin move to the Cole pad. The site passed preliminary restoration according to ORC 1509.072A. |
1873380787 | 2018-09-25 | Production Wells | No Violations | The purpose of my inspection was to document the status of Utica Resource Operatings Dynamite Pad prior to SIMOPS activities. Guerney County Inspector Austin Gutridge was present during the inspection. At the time of inspection well #2-4336 remained in production. Correct identification was present. A total of four (4) production wells were on the pad. Well #2-4336 will be within the fall radius of the anticipated rig contracted to drill the two permitted wells on the West side of the pad. Approved temporary abandonment permit conditions will need to be completed on well #2-4336 prior to the commencement of drilling activities that include well #2-4336 within the fall radius of the derrick. |
2028188604 | 2015-02-27 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the well is online and equipped with a production tree with valves in the open position. Production equipment included a sand trap, a GP Unit, a vapor recovery system and a total of 12-500bbl tanks all within containment and shared with the 2H, 3H and 4H. The site passed preliminary restoration according to ORC 1509.072A. |
42217321 | 2018-11-8 0:00: | PW | No Violations | 2.00 |
617457057 | 2018-11-5 0:00: | PW | No Violations | 0.10 |
67329125 | 2019-2-6 0:00:0 | PW | No Violations | 0.20 |
802190933 | 2020-1-24 0:00: | PW | No Violations | 0.20 |
868950181 | 2017-10-24 0:00 | PW | No Violations | 0.30 |
For data sources see[9]