X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24343

Well Details

Well ID: 34-059-24343
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000795
Farm/Lease Name: PORA UNIT
License Status: Producing
License Date: 2014-03-17
Spud Date: 2014-04-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-08-06
Well Total Depth: 16084.00 ft
Configuration: Horizontal
Latitude: 39.980000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-17 Proposed Formations:POINT PLEASANT, Issued Date:3/17/2014, Expired Date:3/16/2016 12:00:00 PM, Drilling unit acres:620.38, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2014-04-18 CORRECTION TO TAKE-POINT INFORMATION (COORDINATES) FROM AS DRILLED SURVEY PLAT. VARIANCE REQUEST GRANTED.
Reached Total Depth 2014-08-06
Completion Report Received 2015-02-23
Correction to Well 2015-11-27 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-03-16
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-24 8128 15899 798
8128 15899 798
8128 15899 798

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/08/2014 09/08/2014 7972 11,469,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OPTIFLO-HTE Halliburton Breaker Crystalline silica, quartz 14808-60-7 30 0.000265478 294
Walnut hulls Mixture 100 0.000884928 977
SP BREAKER Halliburton Breaker Sodium persulfate 7775-27-1 100 0.000975504 1077
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 86.5389 95,542,800.0
SAND - PREMIUM WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 11.5013 12,698,000.0
HYDROCHLORIC ACID 10-30% Halliburton Solvent Hydrochloric acid 7647-01-0 30 0.0145885 16107
SAND - COMMON WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 1.28129 1,414,600.0
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.026093 28808
Other Ingredient(s) Water 7732-18-5 0 0.58081 641241
Fatty acid tall oil amide Confidential 0 0.00434884 4802
Cured acrylic resin Confidential 0 0.000265478 294
Crystalline Silica, Quartz 14808-60-7 0 0.00004872 54
Surfactant mixture Confidential 0 0.000487245 538
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 0 0.000869768 961
Enzyme Confidential 0 0.00004425 49
Sodium sulfate 7757-82-6 0 0.00000098 2
Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 0 0.00243622 2690
Cured acrylic resin Confidential 0 0.00000885 10
Sodium chloride 7647-14-5 0 0.00434884 4802
Alcohols, C12-16, ethoxylated 68551-12-2 0 0.00434884 4802
Ammonium chloride 12125-02-9 0 0.00434884 4802
Polyacrylamide copolymer Confidential 0 0.026093 28808
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 0 0.000869768 961
C.I. Pigment Red 5 6410-41-9 0 0.00000885 10
Silica gel 112926-00-8 0 0.000487245 538
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0487245 53794
BC-140 Halliburton Crosslinker Ethylene glycol 107-21-1 30 0.00886649 9790
Monoethanolamine borate 26038-87-9 60 0.017733 19579
BA-40L BUFFERING AGENT Halliburton Buffer Potassium carbonate 584-08-7 60 0.000704233 778
HYDROCHLORIC ACID 5-10% Halliburton Solvent Hydrochloric acid 7647-01-0 10 0.0461559 50959

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-08-30 H2O 8 400999 Gal 0 Halliburton STAGE 1/31

48 SHOTS STAGES 2-30 SEE IMAGES

2020-09-08 H2O 8 328121 Gal 455154 Halliburton STAGE 31/31

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ECLIPSE RESOURCES I LP 19365 1719 12
2015 ECLIPSE RESOURCES I LP 1030641 101472 362
2016 ECLIPSE RESOURCES I LP 600066 29589 360
2017 ECLIPSE RESOURCES I LP 375200 14367 360
2018 ECLIPSE RESOURCES I LP 315109 20574 360
2019 ECLIPSE RESOURCES I LP 47006 1760 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ECLIPSE RESOURCES I LP Brine 1213 12
2015 ECLIPSE RESOURCES I LP Brine 22824 362
2016 ECLIPSE RESOURCES I LP Brine 8553 360
2017 ECLIPSE RESOURCES I LP Brine 6214 360
2018 ECLIPSE RESOURCES I LP Brine 22442 360
2019 ECLIPSE RESOURCES I LP Brine 1896 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-589227677 2016-3-21 0:00: PW No Violations 0.50
0242812571 2016-09-29 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 710 pounds per square inches on the casing and 525 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and 2-400 barrel purge tanks within containment and shared with the 6H, 4H and the 2H. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF for sales.
0389107160 2014-07-29 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Southeast Regional Supervisor Rocky King, I met with Company Man Jack Turner. Patterson UTI Drilling Rig #328 had completed cementing of the 2nd intermediate casing string, testing of the BOP and were preparing to trip back in hole to drill out float equipment.
0589227677 2016-03-21 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a line heater, a sand trap, a GP unit and 2-400bbl purge tanks. The well was equipped with a plunger lift system with gauges present reading 1050psi on the casing, 850psi on the tubing and valves in the open position Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF.
1528746297 2018-06-11 Production Wells No Violations The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring for all casing strings were present. The production equipment consisted of two 400 barrel tanks, four sand traps and four gas production units. The identification was located at the wellhead.
1584108609 2020-3-10 0:00: PW No Violations 0.20
1809899416 2018-07-19 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of two 400-barrel tanks, four sand traps, and four gas production units.
1936152384 2015-01-27 Preliminary Restoration No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A.
242812571 2016-9-29 0:00: PW No Violations 0.50
389107160 2014-7-29 0:00: DD No Violations 1.00
651892019 2020-6-18 0:00: PW No Violations 1.00

For data sources see[10]

References