X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24348

Well Details

Well ID: 34-059-24348
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000913
Farm/Lease Name: FRITZ UNIT
License Status: Plugged Back
License Date: 2014-04-11
Spud Date: 2014-04-23
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.000000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-27 Proposed Formations:POINT PLEASANT, Issued Date:3/27/2014, Expired Date:3/26/2016 12:00:00 PM, Drilling unit acres:602.307, Proposed Well Type:OG, Proposed Well Class:NWC
APP 2014-04-11 Proposed Formations:TRENTON, Issued Date:4/11/2014, Expired Date:4/10/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Construction Permit Expires 2016-04-10 UPDATED STATUS TO PB FROM DR, PER INSPECTOR, WELL WAS PLUGGE DBACK TO HORIZONTALLY DRILL, PREVIOUS STATUS DATE 12/17/2014-ALE 03/29/2017
Record Last Modified 2017-10-23 UPDATED STATUS TO PB FROM DR, PER INSPECTOR, WELL WAS PLUGGE DBACK TO HORIZONTALLY DRILL, PREVIOUS STATUS DATE 12/17/2014-ALE 03/29/2017

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-11-19 8374 15810 0
8374 15810 0
8374 15810 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/03/2014 08/03/2014 7811 13,002,800.0 166000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 MESH Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 1.06915 1,315,400.0
SP BREAKER Halliburton Breaker Sodium persulfate 7775-27-1 100 0.000740457 911
GelTrol 225 Independence Oilfield Chemicals High pH buffering agent Sodium Hydroxide 1310-73-2 35 0.00184179 2266
X-CHEM Reagent B XCHEM Additive Sodium hypochlorite 7681-52-9 15 0.0012704 1563
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0281845 34676
LCA-1 Halliburton Solvent Paraffinic solvent Confidential 100 0.00013086 161
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.1423 108,443,000.0
ADOX 3125/8125 DuPont Additive Sodium chlorite 7758-19-2 25 0.00155244 1910
Water 7732-18-5 75 0.00465651 5729
FE-1A ACIDIZING COMPOSITION Halliburton Additive Acetic acid 64-19-7 60 0.007902 9722
Acetic anhydride 108-24-7 100 0.0131697 16203
OPTIFLO-HTE Halliburton Breaker Crystalline silica, quartz 14808-60-7 30 0.000400708 493
Walnut hulls Mixture 100 0.00133461 1642
LoSurf-300D Halliburton Non-ionic Surfactant Ethanol 64-17-5 60 0.00133949 1648
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000669744 824
1,2,4 Trimethylbenzene 95-63-6 1 0.00002276 28
Naphthalene 91-20-3 5 0.000112166 138
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.000112166 138
Other Ingredient(s) Oxyalkylated phenolic resin Confidential 0 0.000669744 824
Ethoxylated fatty acid Confidential 0 0.000351128 432
Alcohols, C12-16, ethoxylated 68551-12-2 0 0.00469796 5780
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 0 0.000657552 809
Silica gel 112926-00-8 0 0.000312926 385
Olefins Confidential 0 0.00002195 27
C.I. Pigment Red 5 6410-41-9 0 0.00001382 17
Polyacrylamide copolymer Confidential 0 0.0281845 34676
Alcohols, C12-16, ethoxylated 61791-08-0 0 0.000351128 432
Fatty acids, tall oil Confidential 0 0.000657552 809
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 0 0.000939592 1156
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 0 0.000939592 1156
Sodium sulfate 7757-82-6 0 0.00000081 1
Aluminum Silicate 1302-76-7 0 4.1594 5,117,400.0
Water 7732-18-5 0 1.22771 1,510,480.0
Oxyalkylated phenolic resin Confidential 0 0.000199135 245
Cured acrylic resin Confidential 0 0.000400708 493
Enzyme Confidential 0 0.00006746 83
Sodium chloride 7647-14-5 0 0.00469796 5780
Terpenes and Terpenoids Confidential 0 0.000117043 144
Olefins Confidential 0 0.000109727 135
Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 0 0.00156138 1921
Surfactant mixture Confidential 0 0.000312926 385
Cured acrylic resin Confidential 0 0.00001382 17
Ammonium chloride 12125-02-9 0 0.00469796 5780
Crystalline Silica, Quartz 14808-60-7 0 0.00003170 39
Fatty acid tall oil amide Confidential 0 0.00469796 5780
Alcohols, C14-C15, ethoxylated 68951-67-7 0 0.000657552 809
HYDROCHLORIC ACID 10-30% Halliburton Solvent Hydrochloric acid 7647-01-0 30 0.0392824 48330
Halliburton Surfactant Terpenes and Terpenoids, sweet orange-oil 68647-72-3 30 0.000351128 432
Isopropanol 67-63-0 30 0.000351128 432
BA-40L BUFFERING AGENT Halliburton Buffer Potassium carbonate 584-08-7 60 0.00007234 89
CERAMIC PROP Halliburton Proppant Mullite 1302-93-8 100 4.1594 5,117,400.0
Silica, amorphous - fumed 7631-86-9 30 1.24782 1,535,220.0
Crystalline silica, cristobalite 14464-46-1 30 1.24782 1,535,220.0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Propargyl alcohol 107-19-7 10 0.000219455 270
Methanol 67-56-1 60 0.0013151 1618
VisLink 100 Independence Oilfield Chemicals Borate Crosslinker Inorganic Borates Proprietary 50 0.00449964 5536
Paraffinic Naphthenic Solvent 64742-47-8 65 0.00584969 7197
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0312203 38411
X-CHEM Reagent A XCHEM Additive Hydrogen chloride 7647-01-0 32 0.00105501 1298
40/70 White Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 5.27626 6,491,500.0
X-CHEM SC-30 XCHEM Scale Inhibitor Sodium polyacrylate NA 30 0.00619757 7625
HYDROCHLORIC ACID 5-10% Halliburton Solvent Hydrochloric acid 7647-01-0 10 0.103934 127872
BC-140 Halliburton Crosslinker Ethylene glycol 107-21-1 30 0.000321867 396
Monoethanolamine borate 26038-87-9 60 0.000642921 791

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ECLIPSE RESOURCES I LP Brine 3418 52
2015 ECLIPSE RESOURCES I LP Brine 13516 362
2016 ECLIPSE RESOURCES I LP Brine 14756 360
2017 ECLIPSE RESOURCES I LP Brine 3540 253
2018 ECLIPSE RESOURCES I LP Brine 14551 297
2019 ECLIPSE RESOURCES I LP Brine 1860 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1150565913 2019-9-6 0:00:0 PW No Violations 0.20
-1553229217 2019-12-19 0:00 PW No Violations 0.10
-1745996293 2020-3-10 0:00: PW No Violations 0.10
-310011106 2018-6-11 0:00: PW No Violations 0.20
-474033066 2016-11-9 0:00: PW No Violations 0.50
-644079627 2017-2-8 0:00:0 PW No Violations 0.50
-697138325 2020-6-18 0:00: PW No Violations 1.00
-866588228 2018-7-20 0:00: PW No Violations 0.30
0167360156 2016-03-21 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400bbl purge tanks. The well was equipped with Sweco wellheads and production trees with valves in the open position with 1800psi on the tubing and 2190psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF.
0310011106 2018-06-11 Production Wells No Violations The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring for all casing strings were present. The production equipment consisted of three 400 barrel tanks, nine sand traps, nine gas production units, and six indirect line heaters. The identification was located at the wellhead.
0474033066 2016-11-09 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with plunger lift system with valves in the open position. Gauges present read 770 pounds per square inch (psi) on the casing and 455 psi on the tubing with annular pressure monitoring in place. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF.
0551308838 2017-03-27 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 400 pounds per square inch on the tubing and 620 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current.
0644079627 2017-02-08 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 300 pounds per square inch on the tubing and 635 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current. Further inspection revealed the mouse hole may not be plugged according to OAC 1501:9-11-11 (B). I contacted Eclipse Resources and requested that the plates be removed from the mouse hole and checked for cement. If cement was not at 30 inches, they need to be cemented to be compliant with OAC 1501:9-11-11 (B).
0808301771 2015-02-10 Preliminary Restoration No Violations On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A.
0866588228 2018-07-20 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Gauges were present reading 915 pounds per square inch on the production tubing,1150 pounds per square inch on the production casing, 500 pounds per square inch on the 9.875-inch diameter intermediate, and 100 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of six indirect line heaters, nine sand traps, nine gas production units, and three 400-barrel tanks. Well product travels via pipeline to the Hayes Central Gathering Facility.
1116862999 2017-05-30 Production Wells No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 360 pounds per square inch on the tubing and 545 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current. Eclipse will set a plug in the tubing on Friday and nipple down wellhead for upcoming drilling on pad.
1371901429 2015-01-26 Preliminary Restoration No Violations On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A.
1398965341 2014-05-01 Drill / Deepen / Reopen No Violations On the day of my inspection, I witnessed Halliburton load the well bore with fresh water, then break circulation, then mixed 1300 sacks of Halcem system with a density of 15.6 and a yield of 1.21, then displaced with 277 barrels of fresh water to a depth of 1,836, I witnessed 37 Barrels of cement returns to surface.
1455959750 2017-06-12 Production Wells No Violations On the day of my inspection I witnessed that a plug has been set in the tubing and the wellhead has been secured. Cages will be set later this week in preparation for H&P Drilling Rig #531 to arrive on location to drill the Yanosik wells.
167360156 2016-3-21 0:00: PW No Violations 0.50
551308838 2017-3-27 0:00: PW No Violations 0.50
808301771 2015-2-10 0:00: PL No Violations 1.00

For data sources see[7]

References