If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24348 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Millwood Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000913 | |
Farm/Lease Name: FRITZ UNIT | |
License Status: Plugged Back | |
License Date: 2014-04-11 | |
Spud Date: 2014-04-23 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.000000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-03-27 | Proposed Formations:POINT PLEASANT, Issued Date:3/27/2014, Expired Date:3/26/2016 12:00:00 PM, Drilling unit acres:602.307, Proposed Well Type:OG, Proposed Well Class:NWC |
APP | 2014-04-11 | Proposed Formations:TRENTON, Issued Date:4/11/2014, Expired Date:4/10/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2016-04-10 | UPDATED STATUS TO PB FROM DR, PER INSPECTOR, WELL WAS PLUGGE DBACK TO HORIZONTALLY DRILL, PREVIOUS STATUS DATE 12/17/2014-ALE 03/29/2017 |
Record Last Modified | 2017-10-23 | UPDATED STATUS TO PB FROM DR, PER INSPECTOR, WELL WAS PLUGGE DBACK TO HORIZONTALLY DRILL, PREVIOUS STATUS DATE 12/17/2014-ALE 03/29/2017 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-19 | 8374 | 15810 | 0 |
8374 | 15810 | 0 | |
8374 | 15810 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/03/2014 | 08/03/2014 | 7811 | 13,002,800.0 | 166000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 MESH | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 1.06915 | 1,315,400.0 |
SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 100 | 0.000740457 | 911 | |
GelTrol 225 | Independence Oilfield Chemicals | High pH buffering agent | Sodium Hydroxide | 1310-73-2 | 35 | 0.00184179 | 2266 | |
X-CHEM Reagent B | XCHEM | Additive | Sodium hypochlorite | 7681-52-9 | 15 | 0.0012704 | 1563 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0281845 | 34676 | |
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Confidential | 100 | 0.00013086 | 161 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 88.1423 | 108,443,000.0 | |
ADOX 3125/8125 | DuPont | Additive | Sodium chlorite | 7758-19-2 | 25 | 0.00155244 | 1910 | |
Water | 7732-18-5 | 75 | 0.00465651 | 5729 | ||||
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Acetic acid | 64-19-7 | 60 | 0.007902 | 9722 | |
Acetic anhydride | 108-24-7 | 100 | 0.0131697 | 16203 | ||||
OPTIFLO-HTE | Halliburton | Breaker | Crystalline silica, quartz | 14808-60-7 | 30 | 0.000400708 | 493 | |
Walnut hulls | Mixture | 100 | 0.00133461 | 1642 | ||||
LoSurf-300D | Halliburton | Non-ionic Surfactant | Ethanol | 64-17-5 | 60 | 0.00133949 | 1648 | |
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.000669744 | 824 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00002276 | 28 | ||||
Naphthalene | 91-20-3 | 5 | 0.000112166 | 138 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.000112166 | 138 | ||||
Other Ingredient(s) | Oxyalkylated phenolic resin | Confidential | 0 | 0.000669744 | 824 | |||
Ethoxylated fatty acid | Confidential | 0 | 0.000351128 | 432 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 0 | 0.00469796 | 5780 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 0 | 0.000657552 | 809 | ||||
Silica gel | 112926-00-8 | 0 | 0.000312926 | 385 | ||||
Olefins | Confidential | 0 | 0.00002195 | 27 | ||||
C.I. Pigment Red 5 | 6410-41-9 | 0 | 0.00001382 | 17 | ||||
Polyacrylamide copolymer | Confidential | 0 | 0.0281845 | 34676 | ||||
Alcohols, C12-16, ethoxylated | 61791-08-0 | 0 | 0.000351128 | 432 | ||||
Fatty acids, tall oil | Confidential | 0 | 0.000657552 | 809 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 0 | 0.000939592 | 1156 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 0 | 0.000939592 | 1156 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00000081 | 1 | ||||
Aluminum Silicate | 1302-76-7 | 0 | 4.1594 | 5,117,400.0 | ||||
Water | 7732-18-5 | 0 | 1.22771 | 1,510,480.0 | ||||
Oxyalkylated phenolic resin | Confidential | 0 | 0.000199135 | 245 | ||||
Cured acrylic resin | Confidential | 0 | 0.000400708 | 493 | ||||
Enzyme | Confidential | 0 | 0.00006746 | 83 | ||||
Sodium chloride | 7647-14-5 | 0 | 0.00469796 | 5780 | ||||
Terpenes and Terpenoids | Confidential | 0 | 0.000117043 | 144 | ||||
Olefins | Confidential | 0 | 0.000109727 | 135 | ||||
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 0 | 0.00156138 | 1921 | ||||
Surfactant mixture | Confidential | 0 | 0.000312926 | 385 | ||||
Cured acrylic resin | Confidential | 0 | 0.00001382 | 17 | ||||
Ammonium chloride | 12125-02-9 | 0 | 0.00469796 | 5780 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0 | 0.00003170 | 39 | ||||
Fatty acid tall oil amide | Confidential | 0 | 0.00469796 | 5780 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 0 | 0.000657552 | 809 | ||||
HYDROCHLORIC ACID 10-30% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 30 | 0.0392824 | 48330 | |
Halliburton | Surfactant | Terpenes and Terpenoids, sweet orange-oil | 68647-72-3 | 30 | 0.000351128 | 432 | ||
Isopropanol | 67-63-0 | 30 | 0.000351128 | 432 | ||||
BA-40L BUFFERING AGENT | Halliburton | Buffer | Potassium carbonate | 584-08-7 | 60 | 0.00007234 | 89 | |
CERAMIC PROP | Halliburton | Proppant | Mullite | 1302-93-8 | 100 | 4.1594 | 5,117,400.0 | |
Silica, amorphous - fumed | 7631-86-9 | 30 | 1.24782 | 1,535,220.0 | ||||
Crystalline silica, cristobalite | 14464-46-1 | 30 | 1.24782 | 1,535,220.0 | ||||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 10 | 0.000219455 | 270 | |
Methanol | 67-56-1 | 60 | 0.0013151 | 1618 | ||||
VisLink 100 | Independence Oilfield Chemicals | Borate Crosslinker | Inorganic Borates | Proprietary | 50 | 0.00449964 | 5536 | |
Paraffinic Naphthenic Solvent | 64742-47-8 | 65 | 0.00584969 | 7197 | ||||
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0312203 | 38411 | |
X-CHEM Reagent A | XCHEM | Additive | Hydrogen chloride | 7647-01-0 | 32 | 0.00105501 | 1298 | |
40/70 White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 5.27626 | 6,491,500.0 | |
X-CHEM SC-30 | XCHEM | Scale Inhibitor | Sodium polyacrylate | NA | 30 | 0.00619757 | 7625 | |
HYDROCHLORIC ACID 5-10% | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 10 | 0.103934 | 127872 | |
BC-140 | Halliburton | Crosslinker | Ethylene glycol | 107-21-1 | 30 | 0.000321867 | 396 | |
Monoethanolamine borate | 26038-87-9 | 60 | 0.000642921 | 791 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ECLIPSE RESOURCES I LP | Brine | 3418 | 52 |
2015 | ECLIPSE RESOURCES I LP | Brine | 13516 | 362 |
2016 | ECLIPSE RESOURCES I LP | Brine | 14756 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 3540 | 253 |
2018 | ECLIPSE RESOURCES I LP | Brine | 14551 | 297 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1860 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1150565913 | 2019-9-6 0:00:0 | PW | No Violations | 0.20 |
-1553229217 | 2019-12-19 0:00 | PW | No Violations | 0.10 |
-1745996293 | 2020-3-10 0:00: | PW | No Violations | 0.10 |
-310011106 | 2018-6-11 0:00: | PW | No Violations | 0.20 |
-474033066 | 2016-11-9 0:00: | PW | No Violations | 0.50 |
-644079627 | 2017-2-8 0:00:0 | PW | No Violations | 0.50 |
-697138325 | 2020-6-18 0:00: | PW | No Violations | 1.00 |
-866588228 | 2018-7-20 0:00: | PW | No Violations | 0.30 |
0167360156 | 2016-03-21 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400bbl purge tanks. The well was equipped with Sweco wellheads and production trees with valves in the open position with 1800psi on the tubing and 2190psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF. |
0310011106 | 2018-06-11 | Production Wells | No Violations | The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring for all casing strings were present. The production equipment consisted of three 400 barrel tanks, nine sand traps, nine gas production units, and six indirect line heaters. The identification was located at the wellhead. |
0474033066 | 2016-11-09 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with plunger lift system with valves in the open position. Gauges present read 770 pounds per square inch (psi) on the casing and 455 psi on the tubing with annular pressure monitoring in place. Fluids and gas are separated at the GP unit and then transferred to the Hayes CGF. |
0551308838 | 2017-03-27 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 400 pounds per square inch on the tubing and 620 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current. |
0644079627 | 2017-02-08 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 300 pounds per square inch on the tubing and 635 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current. Further inspection revealed the mouse hole may not be plugged according to OAC 1501:9-11-11 (B). I contacted Eclipse Resources and requested that the plates be removed from the mouse hole and checked for cement. If cement was not at 30 inches, they need to be cemented to be compliant with OAC 1501:9-11-11 (B). |
0808301771 | 2015-02-10 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A. |
0866588228 | 2018-07-20 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Gauges were present reading 915 pounds per square inch on the production tubing,1150 pounds per square inch on the production casing, 500 pounds per square inch on the 9.875-inch diameter intermediate, and 100 pounds per square inch on the 13.375-inch diameter surface casing. The production equipment consisted of six indirect line heaters, nine sand traps, nine gas production units, and three 400-barrel tanks. Well product travels via pipeline to the Hayes Central Gathering Facility. |
1116862999 | 2017-05-30 | Production Wells | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2-400 barrel purge tanks. The well was equipped with a plunger lift system with valves in the open position. Gauges present read 360 pounds per square inch on the tubing and 545 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Hayes Central Gathering Facility. Identification was present and production records were current. Eclipse will set a plug in the tubing on Friday and nipple down wellhead for upcoming drilling on pad. |
1371901429 | 2015-01-26 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed that the production equipment included a sand trap, a GP unit and 2 400bbl purge tanks. Fluids are separated at the GP unit and then transferred to the Hayes CGF. The site passed preliminary restoration according to ORC 1509.072A. |
1398965341 | 2014-05-01 | Drill / Deepen / Reopen | No Violations | On the day of my inspection, I witnessed Halliburton load the well bore with fresh water, then break circulation, then mixed 1300 sacks of Halcem system with a density of 15.6 and a yield of 1.21, then displaced with 277 barrels of fresh water to a depth of 1,836, I witnessed 37 Barrels of cement returns to surface. |
1455959750 | 2017-06-12 | Production Wells | No Violations | On the day of my inspection I witnessed that a plug has been set in the tubing and the wellhead has been secured. Cages will be set later this week in preparation for H&P Drilling Rig #531 to arrive on location to drill the Yanosik wells. |
167360156 | 2016-3-21 0:00: | PW | No Violations | 0.50 |
551308838 | 2017-3-27 0:00: | PW | No Violations | 0.50 |
808301771 | 2015-2-10 0:00: | PL | No Violations | 1.00 |
For data sources see[7]