X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24351

Well Details

Well ID: 34-059-24351
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000914
Farm/Lease Name: J HALL UNIT
License Status: Producing
License Date: 2014-05-09
Spud Date: 2014-04-19
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-08-13
Well Total Depth: 12429.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-28 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/28/2014, Expired Date:3/27/2016 12:00:00 PM, Drilling unit acres:594.37, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2014-05-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/9/2014, Expired Date:5/8/2016 12:00:00 PM, Drilling unit acres:159.6, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-08-13
Correction to Well 2015-01-02 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-05-05
Correction to Well 2015-08-28 CHANGE IN TAKE-POINT FOOTAGES AND COORDINATES FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-05-08
Change of Owner 2017-02-15 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 8943, ANTERO RESOURCES CORPORATION
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-01-16 12260 12410 0
12260 12410 0
12260 12410 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/19/2014 12/13/2014 8207 6,814,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Parasorb 5005 Baker Hughes Paraffin Inhibitor Ethylene-Vinyl Acetate Copolymer NA 5 0.000459292 300
Naphthalene 91-20-3 1 0.00009186 60
Calcined Diatomaceous Earth 91053-39-3 100 0.00918584 6000
Crystalline Silica: Quartz (SiO2) 14808-60-7 1 0.00009186 60
Complex Ester 68607-07-8 30 0.00275575 1800
Heavy Aromatic Naphtha 64742-94-5 10 0.000918584 600
Mineral Oil 8042-47-5 5 0.000459292 300
Hydrochloric Acid (7.5%) PVS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0389416 25435.9
Water 7732-18-5 92.5 0.48028 313709
Hydrochloric Acid (10%) PVS Acidizing Water 7732-18-5 90 0.409707 267612
Hydrochloric Acid 7647-01-0 10 0.045523 29734.7
Sand (Proppant) Sargent/Momentive/Preffered Proppant Silica Substrate 14808-60-7 100 11.7557 7,678,600.0
ScaleSorb 7 Baker Hughes Scale Inhibitor Sodium Chloride 7647-14-5 10 0.000367434 240
Diatomaceous Earth, Calcined 91053-39-3 100 0.00367433 2400
Crystalline Silica (Quartz) 14808-60-7 1 0.00003674 24
Organo Phosphorus Salt NA 30 0.0011023 720
Other Chemicals Sodium Sulfonate 870-72-4 0 0.00000588 0
Sodium Bisulfate 7631-90-5 0 0.00002021 0
Water 7732-18-5 0 0.00146973 0
Slurry Gel, WGA-7 SLR PolyFrac Plus Gel Surfactant 154518-36-2 5 0.000141487 92.417
Guar Gum 9000-30-0 45 0.00127339 831.75
Clay 14808-60-7 5 0.000141487 92.417
Petroleum Distillate 64742-47-8 45 0.00127339 831.75
AP Breaker Sagar Enterprise Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00002756 18
Cla-Chek G Shrieve Chemical Products KCL Substitue Propietary non - hazardous salt NA 85 0.00215801 1409.57
Water 7732-18-5 15 0.000380826 248.748
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Acetophenone 98-86-2 1 0.00000533 3.483
Methanol 67-56-1 5 0.00002666 17.415
Short Chained Glycol Ether 112-34-5 60 0.000319942 208.98
Thiourea 62-56-6 1 0.00000533 3.483
Formaldehyde 50-00-0 1 0.00000533 3.483
Ethoxylated alcohol 68002-97-1 35 0.000186633 121.905
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00641361 4189.24
Other - (non-hazardous) NA 70 0.0149651 9774.89
Hydrochloric Acid (15%) PVS Acidizing Hydrochloric Acid 7647-01-0 15 0.0103837 6782.43
Water 7732-18-5 85 0.0588411 38433.8
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0270355 17659.1
Other - (non-hazardous) NA 70 0.0630829 41204.5
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 1049-04-4 0.3 0.000691233 451.499
Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 87.0618 56,867,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-10-31 H2O 8 6608 Bbl 1556400 Universal Well Services Inc. STAGE 1/24

60 SHOTS STAGES 2-23 SEE IMAGES

2014-12-12 H2O 8 6133 Bbl 1380800 Universal Well Services Inc. STAGE 24/24

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 R E GAS DEVELOPMENT LLC 828616 25446 360
2016 R E GAS DEVELOPMENT LLC 364734 3522 362
2017 ANTERO RESOURCES CORPORATION 169003 985 280
2018 ANTERO RESOURCES CORPORATION 179630 300 364
2019 ANTERO RESOURCES CORPORATION 39926 3 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 R E GAS DEVELOPMENT LLC Brine 13522 360
2016 R E GAS DEVELOPMENT LLC Brine 3603 362
2017 ANTERO RESOURCES CORPORATION Brine 3527 280
2018 ANTERO RESOURCES CORPORATION Brine 4966 364
2019 ANTERO RESOURCES CORPORATION Brine 143 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-110647698 2016-3-22 0:00: PW No Violations 0.50
-2050064788 2016-6-20 0:00: PW No Violations 0.50
-761422203 2017-2-13 0:00: PW No Violations 0.50
-770263328 2019-11-27 0:00 PW No Violations 0.20
0110647698 2016-03-22 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a production tree with valves in the open position and a gauge present read 555psi on the casing. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 2 inch orifice and chart recorder. Also present an oil stabilizer unit, a vapor recovery system, 15-400bbl tanks all within containment and a gas combustor all shared with the 2H, 4H, 6H, 8H and the 10H.
0264271107 2016-10-20 Production Wells No Violations On the day of my inspection I witnessed that annular monitoring is now in place. The well was equipped with a production tree with valves in the open position and a gauge present read 475 pounds per square inch on the casing. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 1.5 inch orifice and chart recorder. Also present an oil stabilizer unit, a vapor recovery system, 15-400 barrel tanks all within containment and a gas combustor all shared with the 2H, 4H, 6H, 8H and the 10H.
0395737102 2018-07-24 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. A pressure gauge was present on all casing strings along with a pressure relief valve on the annulus. The production equipment consisted of six gas production units, one combustor, and fifteen 400-barrel tanks. A triethylene glycol dehydration unit with a contact tower and reboiler was located by the tank battery. The identification was located on the wellhead.
0436664489 2016-04-28 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a production tree with valves in the open position and a gauge present read 540psi on the casing. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 2 inch orifice and chart recorder. Also present an oil stabilizer unit, a vapor recovery system, 15-400bbl tanks all within containment and a gas combustor all shared with the 2H, 4H, 6H, 8H and the 10H.
0761422203 2017-02-13 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a production tree with valves in the open position and a gauge present read 485 pounds per square inch on the casing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 1.5 inch orifice and chart recorder. Also present an oil stabilizer unit, a vapor recovery system, 15-400 barrel tanks all within containment and a gas combustor all shared with the 2H, 4H, 6H, 8H and the 10H.
0785309297 2019-03-06 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of six gas production units, one triethylene glycol dehydration unit with a contact tower and reboiler, and fifteen 400-barrel tanks with vent lines plumbed to a compressor and one combustor. The identification was located on the wellhead.
1406391352 2014-07-26 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #63 drilled a 17.5 inch diameter hole to the depth of 1300 feet and set 1300 feet of 13.375 inch J-55 54.5#/ft. casing. Halliburton was on site and gained circulation with 150bbls of fresh water then pumped 50bbls of gel, 5bbls of fresh water and cemented casing with 1140 sacks of Class A cement with a 15.6ppg density and a yield of 1.21. Displaced cement with 194bbls of fresh water. Good returns of 60bbls of cement, plug was landed at 625psi and pressured up to 1150psi for 5 minutes and the floats held. Cement stayed to surface.
1826259450 2015-02-25 Preliminary Restoration No Violations On the day of my inspection I witnessed that flow back has been completed and the well is online and equipped with a production tree with valves in the open position. Production equipment included a sand trap, a GP Unit, an oil stabilizer unit, a vapor recovery system and a total of 15-400bbl tanks all within containment. The site passed preliminary restoration according to ORC 1509.072A.
2050064788 2016-06-20 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a production tree with valves in the open position and a gauge present read 520psi on the casing. Production equipment included a sand trap, a line heater and a GP Unit with a 4 inch sales meter with a 1.5 inch orifice and chart recorder. Also present an oil stabilizer unit, a vapor recovery system, 15-400bbl tanks all within containment and a gas combustor all shared with the 2H, 4H, 6H, 8H and the 10H. I placed call to REX Energy EHS Supervisor Derrick Smith and I stated that valves were in place for annular monitoring but no gauges or relief valves. Mr. Smith stated that the work would be completed by the end of the week.
264271107 2016-10-20 0:00 PW No Violations 0.20
395737102 2018-7-24 0:00: PW No Violations 0.20
436664489 2016-4-28 0:00: PW No Violations 0.20
785309297 2019-3-6 0:00:0 PW No Violations 0.30

For data sources see[10]

References