If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24375 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Warren Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001036 | |
Farm/Lease Name: WHEELER UNIT | |
License Status: Producing | |
License Date: 2014-07-24 | |
Spud Date: 2014-09-08 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-12-23 | |
Well Total Depth: 15785.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-20 | Proposed Formations:TRENTON, Issued Date:5/20/2014, Expired Date:5/19/2016 12:00:00 PM, Drilling unit acres:691.049, Proposed Well Type:ST, Proposed Well Class:STRT |
Construction Permit Expires | 2014-07-23 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Reached Total Depth | 2014-12-23 | |
Correction to Well | 2016-01-08 | change in target/takepoint per as-drilled plat-ALE |
Completion Report Received | 2016-12-14 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-14 | 8821 | 15643 | 0 |
8821 | 15643 | 0 | |
8821 | 15643 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/10/2016 | 07/27/2016 | 7942 | 11,946,300.0 | 90000 |
2 | 07/10/2016 | 07/25/2016 | 7983 | 11,488,700.0 | 88000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hazardous and Non-Hazardous Ingredients | Fatty acids, tall oil | Confidential | 30 | 0.000166267 | 201 | ||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000166267 | 201 | ||||
Water | 7732-18-5 | 100 | 0.671409 | 807910 | ||||
Alcohols | 66455-14-9 | 30 | 0.000190724 | 230 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005542 | 67 | ||||
Methanol | 67-56-1 | 60 | 0.000332534 | 401 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000166267 | 201 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00268062 | 3226 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.100635 | 121095 | ||||
Acetic acid | 64-19-7 | 60 | 0.00160837 | 1936 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 16.626 | 20,006,200.0 | ||||
Olefins | Confidential | 5 | 0.00006651 | 82 | ||||
Glycerine | 56-81-5 | 7 | 0.00004450 | 54 | ||||
LD-7645W | Multi-Chem | Surfactant | NA | NA | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Proppant | NA | NA | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 82.6992 | 99,512,400.0 | |
2 | HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 |
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Proppant | NA | NA | 0 | 0 | 0 | |
LD-7645W | Multi-Chem | Surfactant | NA | NA | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 87.2616 | 95,700,600.0 | |
Hazardous and Non-Hazardous Ingredients | Fatty acids, tall oil | Confidential | 30 | 0.000178374 | 196 | |||
Methanol | 67-56-1 | 60 | 0.000356747 | 392 | ||||
Water | 7732-18-5 | 100 | 0.720296 | 789957 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000178374 | 196 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.0145 | 13,176,500.0 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.0028758 | 3154 | ||||
Olefins | Confidential | 5 | 0.00007135 | 80 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.107963 | 236808 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000178374 | 196 | ||||
Glycerine | 56-81-5 | 7 | 0.00004774 | 53 | ||||
Acetic acid | 64-19-7 | 60 | 0.00172548 | 1893 | ||||
Alcohols | 66455-14-9 | 30 | 0.000204611 | 225 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005946 | 66 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-10 | H2O | 15 | 377071 Gal | 300160 | Halliburton | STAGE 1/45
48 SHOTS STAGES 2-44 SEE IMAGES |
2016-07-25 | H2O | 15 | 196726 Gal | 306940 | Halliburton | STAGE 45/45
36 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 292861 | 39910 | 110 |
2017 | ECLIPSE RESOURCES I LP | 852830 | 55169 | 363 |
2018 | ECLIPSE RESOURCES I LP | 473334 | 15196 | 362 |
2019 | ECLIPSE RESOURCES I LP | 89476 | 2282 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 11268 | 110 |
2017 | ECLIPSE RESOURCES I LP | Brine | 15307 | 363 |
2018 | ECLIPSE RESOURCES I LP | Brine | 5311 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 279 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1398773020 | 2019-9-4 0:00:0 | PW | No Violations | 0.30 |
-1580990975 | 2016-11-28 0:00 | PW | No Violations | 0.50 |
-2048160157 | 2016-9-7 0:00:0 | CT | No Violations | 0.50 |
-490480541 | 2015-4-17 0:00: | PL | No Violations | 0.20 |
-854908816 | 2016-12-12 0:00 | PW | No Violations | 0.50 |
0034407964 | 2016-06-22 | Completion Testing | No Violations | On the day of my inspection I met with Eclipse Completions Consultant Will Ochampaugh revealing that proper containment was in place for upcoming frac operations, Sweco production wellhead was in place and Nine Wireline was onsite preparing to run a gauge and junk run on the 5.5 inch production casing prior to running a CBL. Plans to complete runs on the 3H, 5H, 7H and 9H will follow with plans to open flow guns next Wednesday 6/29/16. |
0490480541 | 2015-04-17 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
0854908816 | 2016-12-12 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2395 pounds per square inches on the casing and 2170 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1229104892 | 2016-10-13 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2995 pounds per square inches on the casing and 2745 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1418230843 | 2014-12-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed H&P Drilling Rig #531 drilled a 17.5 inch diameter hole to the depth of 1393 feet and Franks Casing crew ran 1380 feet of 13.375 inch 54.5#/ft. J-55 Surface Casing washing the last joint down. Schlumberger was on site and gained circulation with 22bbls of fresh water, pumped 20bbls of gel, 10bbls of fresh water and cemented casing with1291 sacks of Class A cement 15.6ppg, 1.21cuft/sk. cement, verified by mud scales. Displaced cement with 200bbls of fresh water had good cement returns of 28bbls, plug was landed at 620psi and pressured to 1345psi for 5 minutes and the floats held. |
1496842350 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 1165 pounds per square inches on the casing and 810 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater and a GP unit. Also present a 400 barrel purge tank within containment and a blow case skid both shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. Field testing of the sediment pond revealed a pH of 7 and chloride levels of 46 parts per million. |
1519105755 | 2016-09-27 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 3310 pounds per square inches on the casing and 3070 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1580990975 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2765 pounds per square inches on the casing and 2275 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1969736983 | 2019-01-28 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with the production tubing opened and the production casing valves closed. The 13.375-inch surface casing had 0 pounds per square inch, the 9.625-inch intermediate had 1650 pounds per square inch, the 5.5-inch diameter production casing had 600 pounds per square inch, and the 2.875-inch diameter production tubing had 400 pounds per square inch. The production equipment consisted of five sand traps, five gas production units, a blow case, and one 400-barrel tank. The produced gas and fluid are separated and then transferred to the Borton CGF for sales. Identification was located at each well and on the tank. |
2048160157 | 2016-09-07 | Completion Testing | No Violations | On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) was currently running 2.375 production tubing which will be set at 8771 feet. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained and flowback operations have begun on the Wheeler 9H |
34407964 | 2016-6-22 0:00: | CT | No Violations | 2.00 |
713451396 | 2020-6-4 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]